Article 12 All secondary decoration waste of all units and individual residences must be bagged throughout the entire process from the decoration site to the time it is transported out of the city. Ar
Article 12 All secondary decoration waste of all units and individual residences must be bagged throughout the entire process from the decoration site to the time it is transported out of the city. Article 13 Construction waste must be handled in accordance with the "Fuzhou City Construction Waste and Engineering Waste Disposal Management Regulations" (Rongzheng [1992] No. 28) and the "Fuzhou City Construction Waste Disposal and Transportation Management Interim Regulations" (Rongzheng [1997] No. 6) requires centralized and unified transportation and unified disposal. The construction unit must ensure that vehicles transporting slag are clean and must not pollute the road outside the construction site. During the transportation process of slag, it is prohibited to "drip, leak, scatter" and dump it randomly during transportation. Article 14 When vehicles transporting floor materials (sand, stone, cement, etc.) drive in urban areas, measures must be taken to prevent "drips, leaks, and spills". Article 15 Construction projects in the urban area shall use commercial concrete in accordance with the "Administrative Regulations on the Use of Bulk Cement and Commercial Concrete in Fuzhou Construction Projects" and its "Supplementary Notice". If commercial concrete must be used instead of commercial concrete according to regulations, the environmental protection department shall not approve on-site concrete mixing operations that produce high noise. Construction projects that do need to operate will be charged twice the noise and sewage discharge fees for exceeding the standard, and compensation shall be made in accordance with the law. Losses caused by noise pollution to residents surrounding the construction site.