In order to improve the construction speed and economic efficiency of construction and installation works, with the approval of ________ (the competent authority of the construction), ______ (the construction unit) conducts a tender for all the works (or units of works, specialized works) of the construction and installation works of the ______ building (the open tender is issued by the construction unit by publishing a tender advertisement in a regional or national newspapers, invitation to tender is issued by the construction unit to a number of construction units capable of undertaking the project, and designated tender is issued by the competent authority of the construction project or by the competent authority of the capital construction to issue a directive tender to a number of construction enterprises belonging to the region).
One, the bidding for the preparation of the project
The following conditions for bidding for the project have been available:
1. The project has been included in the national (or ministry, commission, or province, city, autonomous region) annual plan;
2. There has been a nationally-approved design unit out of the construction drawings and budget estimates;
3. The land for the construction has been expropriated, obstacles are all Demolition and relocation; on-site construction of water, electricity, road and communication conditions have been implemented;
4. Funds, materials, equipment distribution plan and collaboration supporting conditions have been implemented, can guarantee the supply, so that the proposed project in the scheduled construction period, continuous construction;
5. There are local construction authorities issued building permits;
6. The project's bidding has been submitted to the construction authority and the construction bank for review.
II, the content of the project, scope, quantity, duration, geological survey unit and engineering design unit:
____________________________________________________________________ ____________.
II, site available for the project, water, electricity, roads, etc.
____________________________________________________________________ ___________.
Third, quality grade of the work, technical requirements, special requirements for the materials of the work and the bidding units, acceptance criteria for the work:
____________________________________________________________________ ___________.
Fourth, the way of supplying materials for the project and the price of main materials, the settlement of the project price:
____________________________________________________________________ ____________.
V, the organization of the bidding unit to carry out site survey of the project, the description and the time and place of the tender documents delivery:
____________________________________________________________________ _____________.
VI, registration, date of bidding, method of sending tender documents:
Date of registration: ____, ______ ____;
The period of bidding: ____, ______ ____ from the date of bidding until ____, ______ ____.
Mode of sending tender documents:
___________________________________________________________________.
VII, time and manner of opening and evaluation of tenders, basis of award and notification:
Time of opening of tenders: ____, September ______ (the period from the issuance of tender documents to the date of opening of tenders shall not normally exceed two months).
Evaluation of bids will end on: September ______ ____ ____ (from the date of opening of bids to the end of evaluation of bids, which generally shall not exceed one month).
Opening and evaluation of bids: the construction unit to invite the construction authorities, construction banks and notary public (or business administration) to participate in the public opening of bids, review of certificates, take collective deliberation on the evaluation of bids, the finalization of the bidding work).
Basis for winning the bid and notification: the project evaluation of the winning unit is based on the excellent quality of the project, the construction period is appropriate, the bid price is reasonable, good social reputation, the lowest bidding unit does not necessarily win the bid. When the bidding price of all the bidding enterprises is higher than the bidding price, if the bidding price is wrongly calculated, it should be adjusted according to the facts; if the bidding price is not wrongly calculated, the unreasonable parts will be eliminated through the evaluation of the bidding price to determine the reasonable bidding price and the winning enterprise. Within five days after the end of evaluation, the bidding unit by mail (or hand-delivered) to send the notice of award to the successful bidder, and with the successful bidder in January (up to two months) with the successful bidder to sign ______ the contract for construction and installation works contract.
VIII, Others:
____________________________________________________________________ ___________.
The bidding party promises that once this tender is issued, the content of the original tender document shall not be changed, otherwise, the bidding unit will be compensated for the loss caused by this. The bidding unit participates in the bidding preparation and bidding at its own expense in accordance with the requirements of the bidding documents. The bid (i.e., the bid letter) should be filled in the prescribed format, the handwriting must be clear, and must be stamped with the seal of the unit and the representative. Tenders must be sealed and must not be sent late. Once sent, the tender shall not be required to be withdrawn or altered for any reason.
Disputes occurring in the bidding process, such as the two sides failed to negotiate on their own, the department responsible for bidding management mediation and arbitration, the arbitration is not satisfied, you can go to court.
Construction unit (i.e., the bidding unit): ___________________
Address: _________________________________
Contact: ____________________
Tel: ____________________
19 ______ ____ _____
Tender for Construction and Installation Works from BigSecretary.com, the site provides free article finding aid for all full members. Happy reading Building Installation Project Tender.
Title of the article: hospital medical equipment tender sample
Project name: school hospital equipment
Name: X-ray, blood cell counter, automatic biochemical analyzer
Project number: 2007-wzgyk-02
List of bidding documents
One, the Shandong **General Rules for Tendering for Purchase of Instruments and Equipment of the University,
The main contents include:
Principles and precautions that should be observed in the tendering process.
Second, the tender technical documents, documents include the number, requirements.
Shandong ** University Experimental and State-owned Assets Management Office System
2007-01-05
Shandong ** University General Rules for Tendering
Project No.: 2007-wzgyk-02
Shandong ** University (the bidding party) on the school hospital equipment for the relevant professional company Limited competitive bidding. Companies participating in the tender are requested to read this General Conditions carefully and provide relevant information as required.
1, Project Overview
(1), Project Name: School Hospital Project
(2), Project Location: Shandong ** University
(3), Project Content: X-ray, Automatic Biochemical Analyzer, Hematology Counter
2, Contents of Bidding Documents
(1), Please give a brief introduction to the basic situation of your company and provide Proof of credibility
A, a copy of the company's business license, organization code certificate, tax registration certificate: belonging to the nature of the branch or agent or office must also be attached to the head office or the headquarters of the power of attorney.
B, the company's strength, reputation and can explain your company in the domestic example of the project (preferably Zibo area or domestic university projects), including the name of the user unit, the project name, the person in charge of the name, contact number and so on.
C. The above information shall be bound as an attachment to the tender and attached to the catalog on the first page.
(1), the bidder shall, on the basis of the general conditions, make a detailed overall response to the requirements in the annex (including system solutions and their corresponding specific equipment, single price and total price), and to ensure that in the implementation of the project within the period of the award of the bid, the spot supply.
(2) The bidder shall not make any changes to the contents of the tender schedule issued by the bidder. If the bidder has other better constructive comments or programs on the contents thereof, it may make another program and quote, and please indicate the characteristics of the proposed program for the bidder's reference. However, a verbal affirmation must be made to the bidder before the opening of the bid and at the same time hand in written information, the expert evaluation, the proposed program will be treated the same as the original bid program.
(3), after-sales service commitment (including product warranty period, service response time and guarantee measures, contact person, contact number, etc.).
(4) The bidder shall complete the relevant bidding documents according to the requirements attached to the bidding letter.
(5) The bidder shall prepare one "original" and three "copies" of the bidding documents, and clearly indicate "original bidding documents" and "copies" of the bidding documents. "copies of bidding documents". If there is any difference between the original and the copies of the tender documents, the original shall prevail. The original and copies of the bidding documents should be printed on GB/T148 - A4 type paper, charts and other charts can be extended by multiples of the same specifications, handwriting and arbitrary changes are not allowed, unless these deletions are made according to the instructions of the bidding unit. If it is an error that the bidding unit must modify, the modification shall be stamped by the bidder with the official seal of the legal entity and the seal of the legal representative or delegated representative.
The Bidding Documents, in four copies (in one envelope), must be submitted with the seal of the Bidding Unit stamped on each page of the Schedule, sealed as a whole and sealed with a flush seal. If the bidding documents are not sealed and stamped and sealed as above, the bidder will not be liable for misplacing or opening the bidding documents in advance, and the bidding documents opened in advance as a result will be rejected.
(6), the bidder after receiving the bidding documents, if there is a need for clarification or modification of the issue, should be required in the bidding documents at least 2 days before the deadline for submission of bidding documents, in writing to the bidder, the bidder believes that there is a need for clarification will be responded to in writing. The response will be delivered to all bidding units and will be made an integral part of the bidding documents. The supplementary notice, as an integral part of the bidding documents, is equally binding on the bidding units and the bidding units shall take the contents of the supplementary notice into account when preparing the bidding documents.
3. Schedule:
Tenders will be issued on 05/01/2007. Bids are available on the Web site: Experimental and State-owned Assets Management Division bidding information.
January 12, 2007 before 8:30 a.m. to the bidding office to pay the bid fee and bid deposit, 9:00 a.m. in Shandong ** University Hongyuan Building, Room 414, the bid opening.
Please participate in the bidding party on time to send staff to attend, each bidding unit is limited to three representatives to attend, the bidding unit must be attended by the legal representative or legal person entrusted with the representative, otherwise the bidding unit bidding will be regarded as invalid. When opening the bids, each bidder is allowed to have five to ten minutes of additional oral presentation (which can also be waived). The bidder will open the bids at the time and place specified in the bidding documents.
4, the relevant costs (limited to this project)
To participate in the bidding units need to pay the bidding fee of $ 100 (non-refundable), the bidding deposit of $ 10,000 (unsuccessful units of the deposit refund, the winning unit into a contract deposit, equipment acceptance and return).
Successful unit in the contract signing to pay 0.8% of the total contract bidding service fee.
5, delivery requirements and payment
(1), delivery time: March 10, 2007 to the goods or according to the specific circumstances of the supplier to negotiate.
(2) Transportation: the bidder is responsible for.
(3), the payment method of this project is in installments, 90% of the total contract payment will be paid after acceptance, and the balance will be paid in 3 months.
6, the bidding tender nullification provisions:
(1), not formally purchased the tender;
(2), the bidder in the bidding and evaluation of the bidding period in an attempt to affect the results of the bidding and other acts of unfair competition;
(3), not in accordance with the general conditions and the bid content requirements of the bidding tender;
(4), the contents of the bidding documents for unauthorized Changes without the consent of the bidding party;
(5) Failure to deliver the bid at the specified deadline;
(6) The number of bidders is insufficient to generate effective competition;
(7) Bidders in the bidding process to the bidding party to provide false evidence (including proof of credit, performance, product performance, production plant, etc.). Performance, product performance, production plant, etc.).
7, bid evaluation principles:
(1), the bidding party commitment to bid evaluation by the bidding party in accordance with the law to organize the bid evaluation committee formed by the relevant bid evaluation experts, in the spirit of "openness, fairness, impartiality, science, and selection of the best" principle of comprehensive evaluation of the bidding strictly evaluation, in order to fully ensure the legitimate interests of the bidders.
(2), the bid evaluation in the spirit of standardization and flexibility of the principle of combining the comprehensive consideration of the bidder's bidding program, quality, service commitment and the company's technical strength, social response and other factors as the premise of a comprehensive evaluation, the initial determination of the winning unit, through the consultation of the uncontested, the bidding for approval by the leading group, and will be announced.
Whether the bidding offer takes the second offer is determined by the bid evaluation team based on the first offer.
(3) After the results of the bid evaluation, the bidder will issue a Notice of Award to the successful bidder within five working days and formally notify the bidders of the results of the award.
(4), after the bidding party formally notifies the successful bidder, the two sides will formally sign the contract between the bidding unit and the successful bidder at the specified time and place within 5 working days, in accordance with the "Contract Law of the People's Republic of China*** and the State of China" and its relevant provisions, based on the relevant contents of this solicitation and bidding documents and their annexes. The contract shall, in principle, be based on the standardized contract provided by the bidder.
8, other notes:
(1), please carefully review the bidding documents in the requirements of the bidding price and commitment to fill in carefully. If the tender documents prepared by the bidder cannot respond to and meet the requirements of this tender, the responsibility shall be borne by the bidder, and its tender documents will be rejected by the bidder or be regarded as invalid tender.
(2), the bidders please read this tender and annexes, they contain most of the terms to be written into the contract, once the bidder formally bidding, that is regarded as the bidder has made a legally binding commitment, unless the irresistible factors shall not be changed at will.
(3), on the malicious bidding, winning the contract does not guarantee the supply of manufacturers, the bidding party reserves the right to notify the criticism, claims, fines, liquidated damages and stop all the products of the supply qualification behavior.
(4), regardless of the bidding results, the bidder's bidding documents will not be returned, and does not give any explanation for the unsuccessful unit. All costs incurred by the bidder in the bidding process shall be borne by the bidder regardless of the bidding result.
(5) The quotation form includes transportation and handling charges.
Contact Tel:
Address:
Experimental and State-owned Assets Management Department
Bidding Office ()
Account Unit: Shandong ** University Bank:
Account No.:
Bidding Unit (Seal)
2007-01-05
Automatic Biochemical Analyzer 1 set
I. Testing speed: 300-400 tests/hour.
Second, independent sample needle, reagent needle, stirring needle, sample needle, reagent needle with internal and external wall automatic rinsing, liquid level sensing, automatic safety anti-collision function.
Three, 60 sample positions, can use a variety of specifications of the test tube, the original test tube can be directly on the machine. The reagent tray is refrigerated for 24 hours without interruption to reduce the play of reagents.
four, reagent full open.
V. Optimized anti-Cross-contamination procedures to reduce cross-contamination.
VI. Free service for 2 years.
Hematocrit 1 unit
I, three classified ≥ 18 parameters,
II, dual-needle, dual-channel
Three, peripheral blood, venous blood two modes
Four, the power system: mute peristaltic pumps, no noise, no interference.
V. Automatic plugging, automatic filling and cleaning.
VI. Quality control mode: X-R XB XD-CV three.
VII. Free service for two years.
X-ray fluoroscopy machine 1
I. Line high-voltage generator: program-controlled 500A host.
Two, remote diagnostic bed: ZC15XY-1
Three, integrated camera: SC4-4
Four, image intensifier: image intensifier 9 inches.
V. TV Monitor : Built-in 14-inch TV monitor.
VI.Rotatable foot pedal.
VII. Wire duct assembly.
VIII. Line high voltage cable.
"Hospital Medical Equipment Request for Proposals Sample" from BigSecretary.com, this site provides free article finding aid for all official members. Welcome to the hospital medical equipment tender sample.
Title of the article: bus station yard design bidding
One, the project overview
1, project name: county bus station
2, the construction unit: the city of motor transport limited liability company branch
3, the project geographic location: the line of the intersection of the southwest corner of the highway in the highway cutout.
Two, natural conditions
l, extreme maximum temperature
2, extreme minimum temperature
3, average annual temperature
4, annual precipitation
5, the maximum wind force in the past year
6, the maximum wind speed in the past year
7, fog
Three, design requirements
1, based on the Municipal Development and Reform Commission, Development and Reform Investment No. "on the county bus station east of the feasibility study report on the approval".
2, in line with the Ministry of Transportation, "bus station level division and construction requirements" (JT/T200-2004) and the Ministry of Construction, Ministry of Transportation, "Bus Terminal Construction Design Code" (JGJ60-99).
3, basically in line with the county planning office "county bus station construction land planning and design conditions.
4, the design program economic and practical, beautiful principle. Reflect the people-oriented and convenient for travelers, the main economic and technical indicators should be expressed clearly, such as: land acquisition area, the actual use of the station area, parking lot area, the main station building area (waiting room, ticket hall and the area of the sub-floor) and the construction of auxiliary facilities area, etc..
Four, the bidding requirements description
1, the bidding unit must have an independent legal personality and architectural design of class B (including class B) or higher qualifications.
2, the way to invite design units to participate in the program design, voluntary acceptance of the invitation of the design unit must pay a deposit of 5,000 yuan, and according to the specified time to the site survey.
3, the program design bidding won the unit for the preliminary design and construction drawing design unit. /p>
(5) program design generally shall not exceed the feasibility study report of the indicators ± 5%, such as special circumstances can be explained, the parking lot area to increase unrestricted.
5, the design unit to submit seven copies of the program design documents, one of which is the original, including the relevant qualification certificates, business license (copy) for inspection. The original document should be stamped with the official seal of the design unit, and by the statutory or its authorized person and the appropriate qualifications of registered practitioners, specific preparation of the person in charge of signing and sealing, individually sealed and sealed with the word "original document", the rest of the document for the copy for the evaluation of the use of bidding, the copy of the document and other information shall not have any obvious or implicitly design the unit's text and mark.
The design unit shall deliver the above copy documents and the sealed original documents to the designated place within the specified time.
6, the tender submission location:
Contact: Contact: Tel:
7, the site site visit time: year month noon
Design program delivery deadline: year month noon
Five, the design unit commitment
Design units in the provisions of the design program at the same time, the design unit is required to submit to the construction unit of the relevant commitment.
1, the design progress, depth, design quality, quality service commitments:
2, the time required for the preliminary design, construction drawings design time required:
3, the design costs quoted for the work can be approved for all the construction projects, and includes the program design, the total cost of the preliminary design and construction drawings design must be based on the national standard, and its design fee quotes Propose a preferential rate, calculate the actual offer, and explain the relevant additional conditions.
VI. Bid evaluation methods
According to the "county bus station design bidding evaluation rules".
VII. Documents and information to be provided by both parties:
l. Inviting units to provide basic information for design
(1) Engineering feasibility study report approved by Provincial Department of Transportation:
(2) Planning and design conditions provided by County Planning Office:
(3) Bidding invitation for design proposals.
2. The following documents are required to be provided by the participating program design unit:
(1) Provide a full set of design plan drawings approved by the Public Works Committee in accordance with the depth required by the design specifications, including the general layout, traffic network planning, environmental layout, and the effect of the main station building.
(2) Program design specifications and economic and technical analysis information, design drawings and descriptions of projects approved by the Public Works Permit.
3, program design drawings and instructions album specifications for the A3, ***7 sets (including the original document a set of) the main station color spray drawing format for Al, ***1 sets, another increase in the general layout plan, the main station building a floor plan of a map of the map for Al.
4, the design cost of the bidding price must be a two-envelope method, an envelope for the end of the signature is packaged in a copy of the document, another envelope signed and stamped and packaged in a copy of the document. An envelope signed and sealed package in the original document.
VIII, the main conditions and requirements for the signing of the planning and design contract
l, the program was selected by the evaluation, the construction unit and the unit selected to sign a design contract, the design costs in accordance with the current national standards to give preferential.
2, the applicant's design program is no longer charged separately, the unsuccessful unit's participation in the program to pay the cost of _______ yuan, and return the deposit, the unsuccessful unit's design program of intellectual property rights to the construction unit. Experts assessed as invalid design program of the unit does not pay the cost of work, and does not return the deposit.
Nine, the construction unit contact person and telephone number
Contact person: telephone number:
Attachments:
1, Municipal Development and Reform Commission No. "on the county bus station feasibility study report of the approval of the report"
2, the county planning office, "the county bus station construction site planning and design conditions"
3, the county bus East Railway Station Clerical Map
County East Railway Station Project Detailed List (Engineering feasibility)
Project Name Quantity Investment (million yuan) Description
I. Building Construction 16000m2 800
1, Station Service Room 2863 m2 143
Of which: Waiting Room 1200 m2
2, Administration Room 540 m2 30
Other projects include the construction of a new bus station, the construction of a new bus station, the construction of the new bus station, and the construction of the new bus station, the construction of the new bus station.
3, production auxiliary facilities 12337 m2 622
Of which: vehicle maintenance workshop 300 m2
Auxiliary workshop 200 m2
Materials room 200 m2
Wash bay 100 m2
Vehicle safety inspection bay 100 m2
Electricity distribution room 30 m2
Boiler room 100 m2
Guard room 60 m2
Other auxiliary facilities 1300 m2
Dormitory building 9947 m2
4, service facilities 260 m2 5
Of which: motorcycle shed 200 m2
Medical room 60 m2
The second, general engineering 234
1, site filling and leveling 52000m3 98 level ground
2, station square 1500 m2 54 sheet rock bedding
3, parking lot 23874 m2
4, indoor water and electricity, fire fighting 50
5, landscaping 10
6, perimeter wall and gate 1200m 22
Third, equipment, security, substation equipment, etc.
Fourth, other 684
1, land acquisition 37227 m2 670
2, construction, design, supervision, etc. 14
Total 16,000 m2 1718
Bus Station Design Bidding Rules for Bid Evaluation
(Trial)
According to the "China's People's Republic of China and the State Tendering Rules for the Bidding of Bus Station Designs"
(Trial)
According to the Chinese People's *** and the State Tender Law", the State Development Planning Commission and other seven ministries and commissions "Bid Evaluation Committee and tender evaluation methods", "** Provincial Transportation Construction Project Bidding Management Provisions", "** Provincial Construction Project Design Bidding Management Implementation Rules" and other relevant provisions, combined with the requirements of the project bidding documents, to formulate the "County East Bus Station Design Tender Evaluation Rules".
Article 1 The bid evaluation project follows the principles of openness, fairness and justice. Any unit or individual shall not unlawfully intervene or influence the bid evaluation process and results.
Second Article The bid evaluation of this tender project is in accordance with the bid evaluation method stipulated in the bidding documents, the use of comprehensive evaluation method, the bidding documents of all the bidders to carry out a comprehensive evaluation and comparison, and put forward the winning bid, abolition of the bid or re-tendering and other bid evaluation opinions.
Article 3 The opening of bids is presided over by the bidder and all bidders are invited to attend. The opening of bids shall be held publicly at the time specified in the bidding documents: the place of opening of bids shall be the place specified in the bidding documents.
Article 4 The evaluation shall be carried out by a bid evaluation committee established by the bidder in accordance with law. Bid evaluation committee consists of representatives of the bidder and relevant experts, the number of experts shall not be less than two-thirds of the number of bid evaluation committee. Bid evaluation experts from the provincial transportation department in charge of the expert database.
Article 5 The bid evaluation committee in the evaluation of the bid within twenty-four hours before the formation of the list of its members in the winning bid before the results are determined confidential.
Article 6 When evaluating the bids, the bidder may invite the relevant functional departments to participate in the evaluation as needed, and the bid evaluation committee shall give full consideration to the opinions of the functional departments.
Article 7 The scoring value of this tender shall be a percentage system. The main content and score of the evaluation and scoring of the tender documents by the bid evaluation committee shall be divided as follows:
Scoring content Score
Response to tender 5
The first envelope of the tender documents:
(i) scheme design documents 80
The second envelope of the tender documents:
(ii) design fee 15
Article 8 Scoring Criteria for the First Envelope of the Bidding Documents
Each member of the Bid Evaluation Committee scores each schematic design individually. The score of each program design is the arithmetic average of the score of each member of the bid evaluation committee for the program design minus a maximum score and a minimum score.
Assessment Item Score
Main Station Building Elevation Modeling 40
Plan Function 15
General Layout 15
Design Description and Cost Estimation 5
Auxiliary Rooms 5
Article 9 Quotation Score is scored based on the lowest quotation, and the specific method of calculating the scores is as follows:
(1) The lowest quotation of the bidder is scored as follows:
(1) The lowest quotation of the bidder is scored as follows ) The lowest bidder's quotation score is the highest score:
(ii) Other bidders' quotation score = 15 x lowest quotation/quotation.
Article 10 The bid evaluation committee shall score the bids independently in accordance with the provisions of the bid evaluation rules. The bid evaluation committee shall make a comprehensive evaluation of the bidders, and comprehensively calculate the results of the score and arrange the order.
Article 11 The bid evaluation committee may reject all bids and re-tender the project if, after evaluating the bids, it finds that all the bidding proposals do not meet the bidding requirements.
Article 12 After the evaluation of bids is completed, the bidder determines the successful candidate based on the evaluation results of the bid evaluation committee.
Article 13 The members of the bid evaluation committee shall perform their duties objectively and impartially, abide by the professional ethics, and take personal responsibility for the evaluation opinions put forward. Members of the bid evaluation committee shall not contact the bidders privately, shall not accept any property or other benefits from the bidders, and shall not disclose the evaluation of the bidding documents, the recommendation of the winning candidate and other circumstances related to bid evaluation. In order to ensure the fairness of the bid evaluation, when evaluating the bids, the bid evaluation members shall not carry any communication tools.
Article 14 If the winning candidate ranked first in the overall score gives up the winning bid or proposes that it cannot fulfill the contract due to force majeure, the bidder may determine the winning candidate ranked second as the winning bidder. If there is no next winning candidate that meets the requirements for evaluating tenders, the bidder shall issue a new tender.
Article 15 The unsuccessful bids shall be given a certain financial compensation in accordance with the provisions of the bidding documents, and the bidding proposals recognized as rejected by the bid evaluation committee shall not be compensated.
County bus east station planning and design conditions
Notification
City bus transportation limited liability company branch:
Your unit declared the county bus east station construction project engineering, after study agreed in the provincial highway S306, S305 line of the intersection of the southwest corner of the intersection of the highway in Zhang Chang cut (the former Wanfu village, seven, eight, nine groups location), according to the following planning Conditions for constructive planning and design.
I, the design basis:
1, the county master plan
2, the county urban planning administrative and technical regulations
3, "bus passenger station building design specification" JGJ60-99
2, the land situation:
1, the scope of the planned construction land.
County bus station site location in the provincial highway S306, S305 line of the intersection
Convergence of the southwest corner of the Zhangchang Expressway cut (the former Wanfu Village, seven, eight, nine groups location).
2, road planning width:
3, other planning points:
Planning layout should be a clear functional zoning, traffic organization is reasonable, functional, advanced facilities, and to meet the longer-term development of the use of the requirements of the requirements and future expansion.
The total land area of the planned construction is 37,227 square meters.
Three, the ground control indicators:
Concentration rate:
Building density:
Greening rate:
Four, building design requirements:
Five, the municipal requirements:
1, in accordance with the provisions of the configuration of the garbage collection facilities;
2, all entrances and exits and safety exits must be set up in the bus station obvious signs;
2, the bus station must be set up in the entrance and exit. Signs;
3. The layout of the municipal pipe network within the site must be connected with the urban pipe network.
Sixth, the layout of the planned buildings should meet the fire safety requirements.
VII. Matters to be followed:
1. The planning and design conditions listed in this notice are the basis for the approval of planning and design by my office;
2. Before declaring the design plan, the project needs to consult the competent departments of fire protection, transportation and other departments;
3. The general layout of the bus station made in accordance with the notice of planning and design conditions must be submitted to my office for review and adoption;
4. Through;
4, the project in the planning of land within the power corridor, water supply pipelines, drainage ditches, communication trunk lines, etc. must reach an agreement with its competent departments;
5, this notice is valid for one month, invalid after the expiration date.