Everyone already knows a lot about integrated walls. Today we will introduce the installation method of integrated walls and ceilings in Aksu. The installation of integrated wall is very convenient, but it is still a little different from traditional carpentry work. Let’s take a look.
1. The first step in the installation process: determine the decoration style.
The whole house is equipped with European, Chinese, American, modern and other styles. There are many other styles. Customers can customize it according to their preferences. After meeting the 3D representation, Aksu Integrated Wall and Ceiling can display the construction plan and then prepare the materials. Preparation begins!
2. The second step of the installation process: Preparation of decoration tools and materials.
Such as multiple angle cutters, steel nails, caulking guns, cutter cell phone manuals for grooving and other general tools and consumables used for woodworking some such as nails, absolutely necessary tools special steel, US Seams, structural glue, wooden keels, wooden boards, etc.
3. The third step of the installation process: on-site cleaning, measurement and positioning.
Clean up construction debris. For local potholes, it must be full or level and the wall must be flat. When measuring, measure as closely as possible based on the actual internal area. Some feel uneasy and only offer a unified floor plan for the community. However, it is unknown whether the actual structure will be slightly modified. Therefore, it is recommended that customers re-measure in place to avoid making mistakes and affecting the final decoration. Effect
4. The fourth step of the installation process: brand line.
According to the design and building size, determine the starting position and the joint position of the joint, and then spray the horizontal and vertical lines, respectively, according to the size of each part of the building and the length of the wall integration, determine the keel location and then erecting walls on the walls of the building. Straight line, keel spacing, height >30M, usually choose a height between 400-500MM.
5. The fifth step of the installation process: the general structure of the frame
Our wall blocking usually creates some styles, Aksu integrated wall and ceiling keels must be installed into an initial frame . Of course, it is not necessary to install the keel on the wall. As long as the flatness of the wall is ensured, the embryonic wall can be placed on the wall. It is mentioned here that the keel of the kitchen and the top of the toilet must also be installed, so the keel is essential.
6. Step 6 of the installation process: Integrate the wall.
Cut the integrated wall according to the confirmed design drawings and actual dimensions, paying special attention to the alignment of the pattern stitches. When installing, Aksu integrated walls and ceilings are first placed in a large area, and the corners of the windows and other processing methods will be retained until the end. First there is the upper part, the back wall and the integrated wall from bottom to top. The rear routing strip of the first wall panel.
The above is the installation method of Aksu integrated walls and ceilings that the editor has told you. In addition, owners should pay attention to the fact that when splicing integrated walls, they can use a rubber hammer to tap lightly and gently plug in for a while. The gun nails can be fixed by loosening the space. When encountering the pillars, the wall can be directly covered with grooves at 90 degrees. Pay attention to the thickness of the wall when slotting. When splicing all lines, pay attention to the seams. It is best to fix the seams with glue. To avoid subsequent thermal expansion and contraction.
Tubatu provides you with "each decoration quotation, 1-4 local decoration companies, 3 sets of decoration design plans" for free online, as well as decoration avoidance strategies! Click this link:/yezhu/zxbj-cszy.php?to8to_from=seo_zhidao_m_jiare&wb, and you can get it for free~