Maintenance unit contract template 1
Party A (full name): _______
Party B (full name): _______
In accordance with the "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China" and other relevant laws and administrative regulations, and in compliance with the principles of equality, voluntariness, fairness and good faith, the parties shall The construction matters of this construction project have been reached through consultation and this contract has been concluded.
Article 1 Project Overview
Project Name: _____
Project Location: _____
Article 2 Contract Duration
Construction start date: After the contract is signed, construction will start within two days after the advance payment is received
Construction period: 20 days for pipeline repair and 5 days for compressor replacement
Total calendar days of the contract period 20 days
The third maintenance content
____________________.
Article 4 Contract price and payment method
Contract amount (in capital letters): One hundred thousand yuan (RMB) 100,000 yuan Payment method: 30% of the contract price is payable after the contract is signed As an advance payment for the start of construction, 30% of the contract price will be paid within three days after the compressor replacement is completed, 30% of the contract price will be paid after the completion of the project, and the balance will be paid after one year of the contract.
Article 5 Party B promises to Party A to carry out construction and completion in accordance with the contract and assume the responsibility for project quality warranty within the quality warranty period.
Article 6 Party A promises to Party B to pay the contract price and other payable amounts in accordance with the time limit and method agreed in the contract.
Article 7 Liability for breach of contract
If one party breaches the contract and the other party has the right to terminate the contract, the liability for breach of contract shall be borne by the breaching party.
Article 8 The principle of safety first shall be followed, and Party B shall be responsible for all safety losses during construction.
Article 9 The contract becomes effective upon signature, and both parties shall hold one copy.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): ________ Legal representative (signature): _________
< p> _________year____month____day_________year____month____dayMaintenance unit contract template 2
Party A: (below Party A for short)
Party B: (hereinafter referred to as Party B)
Party A and Party B, in accordance with the city's "Interim Measures for the After-Sales Management of Public-Owned Housing" and "Interim Measures for the Sale of Public-Owned Housing" and related documents This contract is concluded with regard to the management and maintenance of the housing purchased by Party A and other relevant provisions.
1. Party A agrees to entrust Party B with the maintenance of a house located in an urban (county) road (street) lane (new village) with a building area of ??square meters.
2. Party B shall combine and store the first-phase housing maintenance fund provided by Party A and the one-time housing maintenance fund provided by the house selling unit in accordance with regulations, and use them exclusively for the main parts and components of Party A's housing. *Use the housing maintenance fund rationally with the maintenance and update of equipment. Party A has the responsibility for supervision.
3. Party A agrees to pay Party B a management fee of RMB yuan on a monthly basis every year in accordance with the provisions of the Interim Measures for After-sales Management of Public-owned Housing and the Implementation Rules for the Sale of Public-owned Housing, and in accordance with the requirements of socialized management. Party B will use it for management personnel funds and office expenses.
4. For parts or equipment that are not used by the housing maintenance fund, Party B will provide high-quality paid services. Party A agrees to pay the maintenance costs in accordance with regulations and provide convenience for Party B to repair (including common parts and adjacent rooms).
5. Party B is responsible for the maintenance of Party A’s house and ensures the normal use of public parts and public facilities. If the equipment and facilities for public use are damaged by man-made damage, the person who caused the damage shall be responsible for repair or compensation.
6. Party A agrees to pay the housing maintenance fund based on the area when the housing maintenance fund is insufficient to pay maintenance costs in accordance with the provisions of the Interim Measures for Residential After-sales Management.
If Party A delays the payment of the maintenance fund, causing Party B to be unable to repair the house and equipment in a timely manner, Party B will not bear the resulting financial liability.
7. This contract is made in triplicate, with Party A and Party B each holding one copy, and Party B’s management department holding one copy. This contract will take effect after it is signed and sealed by both parties.
8. Other matters that need to be supplemented:
Party A:
Party B:
Signing date: Year, month, day
Maintenance unit contract template part 3
Party A: _______________
Party B: _______________
Party A *** has a _______ trolley. Party A and Party B agree that Party A agrees to entrust Party B to repair _______ cars of its own unit. In order to regulate the behavior of Party A and Party B, the contract is signed as follows:
Article 1. Party A agrees that Party B is the vehicle of ______________ Designated maintenance unit.
Article 2. Party B’s Service Scope
Vehicle overhaul, maintenance at all levels, minor repairs, annual vehicle inspection and other services related to vehicle maintenance.
Article 3. Repair and handover procedures for maintenance vehicles
Party B shall undertake the vehicle maintenance business according to the arrangement of Party A’s vehicle management leadership. After Party B completes the maintenance of the vehicle, it must provide a printed "Destined Point" "Maintenance Settlement List" shall be submitted to the repair unit for review.
Article 4. Maintenance time
Car minor repairs, first-level and second-level maintenance should leave the factory in _______ hours, engine level 3 maintenance should leave the factory in _______ hours; engine overhaul ______ The vehicle will leave the factory on _ days; the vehicle will leave the factory for complete overhaul at the agreed time. For each day of delay in delivery, Party B will bear liquidated damages of _______ yuan.
Article 5, Maintenance Services
Party B implements _______ hour service (including holidays). Vehicles are repaired at any time. Party B goes on the road to repair and rescue vehicles. No maintenance is required in the city. Save costs.
Article 6, Quality Assurance
Our factory implements three guarantees (guaranteed return, guaranteed replacement, guaranteed compensation) for vehicle maintenance quality. The quality standards are strictly in accordance with the "_______ Provincial Automobile Maintenance Industry Quality Standards" implementation. The vehicle warranty for automobile overhaul is ______ ten thousand kilometers or _______ years, and the three-level engine maintenance warranty is ______ ten thousand kilometers. Party B will be responsible for all vehicle losses and traffic accident losses caused by maintenance quality and accessories problems.
Article 7. Rights and Obligations of Party A
1. In view of the long-term cooperative relationship established between Party A and Party B, Party A has the right to require Party B to give priority to repairing the vehicles repaired by Party A.
2. If the completed vehicle is found to be unqualified or inconsistent with the "repair order", Party A has the right to require Party B to rework it for free until it meets the requirements.
3. Party A shall settle the vehicle maintenance costs with Party B according to the contract.
Article 8, Party B’s Rights and Obligations
Party B has the right to require Party A to settle vehicle maintenance costs on time; Party B gives priority to providing maintenance services for Party A’s vehicles sent for repair; Party B The obligations stipulated in this contract shall not be transferred to any third party; Party B shall complete the maintenance work according to the time specified in the "Repair Order"; Party B shall ensure the safety of the vehicle sent for repair; Party B shall ensure the quality of repairs; Party B shall ensure that all accessories comply with national quality standards Brand new original parts, and shall not be used as inferior or replaced at will;
Article 9, Settlement Method
Settlement will be made _______ times per quarter. Party B shall issue to Party A a settlement statement for each maintenance in the current period.
Article 10. Validity Period of the Contract
The validity period of this contract is _______ years, from the date of signing of this contract to _____ month _____ day _____ year end.
Article 11, Disputes and Resolution Methods
If a dispute arises between the two parties during the performance of this contract, they should try to resolve it through negotiation. If negotiation fails, either party has the right to file a lawsuit with the People's Court where Party A is located.
Article 12. For matters not covered in this contract, Party A and Party B can sign a supplementary agreement if they reach consensus through consultation. The supplementary agreement has the same legal effect as this contract.
Article 13. The contract is made in one copy. Party A and Party B each hold _______ copies, which shall take effect after being stamped and signed.
Party A (official seal): ____________________ Party B (official seal): __________________
Legal representative (signature): __________Legal representative (signature): ____________
< p> Date: _________year____month____Date:_______year____month____dayMaintenance unit contract template part 4
Party A : Party B:
This agreement is negotiated and agreed upon by Party A and Party B. In order to ensure the normal use of the weak current intelligent system equipment, Party A entrusts Party B to be responsible for the repair and maintenance of the existing weak current intelligent system and peripheral equipment. The following maintenance contract has been negotiated:
1. Contract period:
The contract period is from ____year____month____ to ____year____month Ends on ____. After the contract expires, both parties can choose to renew or terminate the contract naturally:
2. Service content
Regular maintenance, troubleshooting and repair of weak current system equipment See the attachment for the list;
3. Service requirements
1. In order to ensure the normal operation of Party A's weak current system, Party B will designate technical personnel to serve Party A.
2. Party B shall rush to Party A’s company to eliminate the fault as soon as possible within 24 hours after receiving Party A’s equipment failure notification (except for special circumstances);
3. When Party A’s system fails and needs to be replaced Party B shall provide the configuration at the lowest market price and be responsible for the installation;
4. During the contract period, Party B will visit regularly (at least twice a month) to perform maintenance and optimization operations
5. If there are special operations notified outside the contract (such as adding new points, adding new wiring), etc., Party B will quote separately.
6. Party B shall be responsible for paying if the total price of the accessories required for a single replacement of equipment by Party B does not exceed 100 yuan during the maintenance process. If the single price of replacement of equipment accessories during the maintenance process exceeds 100 yuan, Party A shall pay Pay separately.
4. Maintenance costs:
The maintenance items required for Party A’s weak current system include: monitoring system, conference system, background music system, parking lot management system, UPS system, lightning protection system, See the attachment for a detailed list; based on the above information, after negotiation and agreement between Party A and Party B, Party B will charge Party A a monthly maintenance fee of _ (6500.00) 6,000-500 yuan, with a period of 12 months, totaling 70,000 yuan. Eight thousand yuan (78,000.00) yuan.
5. Payment method:
Party B will collect the maintenance fee on a semi-annual basis: 50% of the total payment, that is, (36,000.00 yuan) thirty thousand six thousand yuan, shall be paid within ten days after the contract is signed. 50% of the total amount, that is, thirty thousand six thousand yuan (36,000.00 yuan), must be paid within ten days after the contract expires.
6. Responsibilities of both parties
(1) Responsibility of Party A
1. When hardware or software fails, Party A shall notify the other party in time.
2. Party A shall not dismantle or change other connections of the equipment at will, and shall not involve third parties in the services under this contract;
3. Party A shall not require Party B to provide services during the service process. Providing illegal services;
4. During the maintenance process, if Party A has important data that needs to be saved or processed, it should inform Party B first, otherwise Party B may lose important data due to ignorance
etc. does not bear any responsibility and shall be borne by Party A himself. However, Party B shall try its best to repair or restore Party A's lost data or equipment; if Party A's equipment or data is damaged due to Party B's fault, Party B shall be responsible for the repair or restoration, and Party B shall bear the costs required.
(2) Party B’s responsibilities
1. Party B will keep Party A’s business data confidential during the maintenance process and shall not disclose it to third parties;
2. Party B During the maintenance process, Party A’s legitimate requirements must be met to ensure the normal operation of the weak current system and other related equipment.
7. Other Matters
This contract is made in duplicate, with each Party A and Party B holding one copy. It has the same legal effect and will come into effect upon signature and seal of both parties. No party may change or cancel without authorization. Unilateral termination or modification of this contract shall bear all relevant responsibilities.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): ________ Legal representative (signature): _________
< p> _________year____month____day_______year____month____dayMaintenance unit contract template part 5
Construction unit (hereinafter referred to as Party A):
Construction unit (hereinafter referred to as Party B):
The water pipe maintenance project at No. 71 Huaihai South Road, Huai'an City, according to the "Economic Contract Law of the People's Republic of China and the Republic of China", Based on the specific circumstances of this project, in order to clarify the project and the responsibilities of both parties, and based on the principle of mutual cooperation to ensure the smooth completion of the construction project, this contract was signed through negotiation.
The first project
(1) Project location: No. 71, Huaihai South Road, Huaian City
(2) Project content: Water pipe maintenance
(3) Contracting method: Contracting work and materials
Article 2 The project cost is RMB 1,050
Article 3 Contract duration
1 .Both parties agreed on a total construction period of 1 day.
Date of commencement of construction: November 6, 20xx, date of completion: November 6, 20xx
2. In case of the following circumstances, the construction period can be postponed after obtaining a visa from Party A’s representative .
① Suspension due to force majeure natural disasters (typhoons, fires, earthquakes), etc.
② When the project quantity is increased due to modification of design drawings and is affected.
③ When there is a water outage, power outage, etc. that lasts for more than six hours.
④ When Party A is affected due to insufficient financial resources or failure to prepay project material preparation and project progress payments as stipulated in the contract.
⑤ Party A cannot hand over the construction site and connect the construction water and power sources five days before the start of construction as stipulated in the contract.
Article 4 Project Quality Standards and Warranty Period
(1) Project quality standards shall be accepted according to the current national construction specifications
(2) Project warranty shall be based on construction-related According to the provisions, the warranty shall be calculated from the date of completion acceptance and signature.
(3) If the project within the construction scope of Party B is damaged due to construction quality problems, Party B shall repair it free of charge.
Article 5 Supply of Materials and Equipment
(1) The materials required for the project shall be purchased by Party B according to the brands and models specified by Party A.
(2) Materials and equipment shall be accompanied by factory certificates of conformity. If there are any objections to materials and equipment, they shall be inspected.
Article 6 Payment Method
After the project is completed, Party A will inspect and accept it. Payment will be made after passing the inspection.
Article 7 Scope of Responsibilities
(1) Responsibilities of Party A:
1. Responsible for solving construction and domestic water, electricity, and smooth roads;
p>
2. Organize the completion acceptance of the project in a timely manner;
3. Handle the completion acceptance and pay Party B the project payment within the time limit specified in this contract.
(2) Party B’s responsibilities:
1. Ensure construction quality according to construction safety regulations, carefully construct, complete on time, and deliver for use. Any construction quality and safety accidents that occur during the construction period shall be borne by Party B. Party B is responsible.
① The contractor should strengthen safety education on fire and theft prevention for construction workers on site. Construction workers are not allowed to violate laws and disciplines at the construction site. Once problems occur, they will be responsible for the consequences.
② Party B’s on-site construction personnel shall unconditionally obey and abide by various management regulations in the construction site, unconditionally obey the management of security on site, and properly handle the relationship between neighboring units, otherwise they shall be responsible for all consequences.
③ Party B shall be responsible for all consequences if the original buildings and fire-fighting facilities are damaged during the construction period.
2. Responsible for the purchase and storage of materials and equipment:
3. Responsible for clearing up construction waste in a timely manner. After the project construction is completed, responsible for cleaning up the construction waste on site.
Other matters in Article 8
(1) After the contract is signed, if Party A requests to add or change the project, it must abide by the following principles:
1. Both parties fully negotiate and issue a "Design Change Notice"
2. After Party B submits design drawings, quotations or project adjustments, Party A must sign and stamp their approval respectively;
3. The materials required to add or change the content must be implemented;
(2) Party B shall be responsible for any losses caused by improper construction by Party B's personnel;
(3) Party A does not have the construction conditions Party A shall bear the responsibility for any work stoppage or loss caused by the work stoppage, and shall compensate Party B for the loss caused by the work stoppage;
(4) For matters not covered in the contract, a separate supplement shall be prepared after discussion by both parties, and shall have the same legal effect as this contract. If any dispute arises during the execution of the contract, it should be resolved through friendly negotiation. If the negotiation is invalid, it can be submitted to the relevant arbitration institution for ruling.
(5) The contract shall become effective upon signature and seal of both parties, and shall become invalid upon completion and acceptance of the project and settlement of the project payment.
Article 9 This contract is made in two copies, including one copy for Party A and one copy for Party B, both of which are equally valid.
Signature of the person in charge of Party A:
Signature of the person in charge of Party B:
Date of signing: