Supervision project department year-end work summary

Time flies, unknowingly, and to the end of the year, review the work of this year's history, paid efforts, but also harvested growth, which also means that, again, to be ready to start writing the year-end summary. I believe that writing the year-end summary is a headache for many people, the following is my compilation of supervision project department year-end work summary sample, welcome to learn and reference, I hope to help you.

Supervision project department year-end work summary Part 1

July 16 last year to report to the General Administration, stayed in Xining for two days was divided into xx branch, July 22 to xx cum xx hydropower station project, just came to the site, everything is still relatively new to us fresh graduates (because we have not seen before), in the safety of the special workers under the leadership of Master Kang, to take us to visit the entire plant, and give us a detailed explanation, after three days of work, we will be able to see the whole plant. And give us a detailed explanation, after three days of learning and understanding, coupled with their own professional knowledge of the hydropower system has a certain understanding of the fourth day, came to work in the test room, the director of the protection system I was assigned to, followed by Xu (my master) dry protection, in the leadership of the boss, I gradually recognize and learn about the power plant protection system, the following I summarize, the work of this year!

1, check the line, to ensure that the protection system is correct, the correctness of the wiring is very critical, the protection depends on the CT, CT wiring is not a problem, the protection can be correctly acted on, the switch can be normal action, if the wiring is connected to the wrong direction, then the direction of the protection of the opposite direction, that would be incorrect, then, it is the control circuit, in order to switch the correct action, it is necessary to ensure that the control circuit wiring is correct, so that the switch can be correctly acted on. Next is the control circuit, in order to correctly operate the switch, we have to ensure that the wiring of the control circuit is correct, so that the switch can be correctly operated, followed by the PT, the same reason, the system failure and normal operation of the voltage is not the same, so we also have to ensure that the correctness of the wiring of the PT, the next is the GIS (switching station), the GIS inside the switch, the CT, more, of course, wiring is also relatively more in the check of the inside of the line must be careful for the future uplift and boosting to play a good solid foundation, all the CTs, all the CCTs, more, of course, wiring is more. A good solid foundation, all the CT get line after checking, in the use of a multimeter to measure the resistance value, phase to phase, relative to the center line point N of the resistance value to see whether it is correct, generally above the resistance value is relatively small.

2, point to point, the so-called point to point, with the point of the monitoring system, as well as with some of their own points, the monitoring system is also a more important system, he can be the first time the situation occurred to the central control building, in order to run the staff to analyze and solve the problem, to complete the field to the point of the work, first of all, to all the points of the public **** end of the measurement, because all the signals of the public **** end of the monitoring of only one line, to first ensure that the public **** end of the monitoring of only one line, to make sure that the public **** end of the monitoring of only one line. Line, to first ensure the correctness of the public **** end, no short up the public **** end to the short-term, and then to the point, if the other side can not receive the protection has been acting on the signal, that is, there are two reasons, 1 the signal of the public **** end is not right, 2, the other side of the wiring is not right, with the monitoring of the end of the point, and some of the points are some with the main transformer, such as non-electricity protection, there are several with the reactor of some points, the method is to ensure the correctness of the signal to the monitor, and then to the point. Some of the reactor points, the same method.

3, debugging protection, this piece is more important, with the relay protection instrument to all the protection are debugged again, to see if the normal action, as well as in the set time within the action, if there is a problem, communicate with the manufacturer, so that he can solve it, so far, there is a protection will not be adjusted, the loss of magnetism protection.

4, transmission test, this step is very important, is to check the accuracy of the control circuit of the switch, if the protection action, but the switch does not act, the control circuit of the switch must have a problem, either the line is loose, or the line is connected to the wrong, further verification and corrected over.

5, the main transformer, the main transformer has a few relays, gas relay, and a few temperature-sensitive resistors, check the gas relay can be correctly operated, use a multimeter to measure the resistance of the temperature-sensitive resistors to see if it is normal, the neutral reactor is the same.

6, to complete the above work, that's about right, but there are two points, check the neutral point of each protection N grounding, if not grounded, then grounded, note that can not be two points of grounding, only a point of grounding, in order to ensure that the smooth progress of the uplift of the current uplift, all the CT to the secondary side of the current, in the protection disk to get the amount of the terminals to see if the energy, A/B/C/three-phase! Separately add different values of current, in order to distinguish, in order to CT is not burned, in checking all the CT secondary side of the wiring is compact, if not tight, in the tight again. Secondly, the staff at the substation to the line protection in the pair, to see if it can be correct action.

7, to complete the above work, you can wait for the trial run behind. In the trial run of a month, although often on the night shift, but I also learned a lot of things, I probably summarize the above one year's work.

Supervision project department year-end work summary Part 2

I supervise the project department since the beginning of the year into the Yellowstone Park project department, in the company's correct leadership and the guidance of the company's departments and the support of the A party, I supervise the department of the staff work hard to continuously optimize the internal management mode and to strengthen the contact with the A party. Zhongye Huangshi Park Project Group A project has been basically completed, all into the final phase of construction, in addition to ground work and sporadic work, before the Spring Festival, Group A can be basically completed. group B 5 #, 6 #, 7 # building has begun piling construction. group C clubhouse and garden landscaping project can also be completed before the Spring Festival.

According to the supervision commissioning contract, the supervision fee of group A has been paid back 150,000, and the payment of supervision fee of group B and C is unknown, but we are still starting to fight for payment.

Comprehensive review of the supervision of this project:

The foundation division of this project, the main structural division in the construction process of each process according to the specification requirements of the test batch for acceptance, of which there are a few parts of the existence of slag, running mold, leakage of tendons, pockmarked surface, masonry mortar joints is too large and other phenomena, rectified basically to meet the qualifying standards, does not affect the structural safety and use of functionality, the quality of the view of the general. The quality inspection department accepted the foundation and main structure and reached the qualified standard. Other divisions are in the final stage of construction, door and window frames installed in a small part of the gap is too large, line installation of joints, straight and other deficiencies, the existence of paint inside and outside the boundaries of unclear, leakage of brush, flowing and other defects, in order to ensure the quality of the project on the above deficiencies and defects and other issues, I supervisory staff and the A side of the Ministry of Engineering has put forward rectification views and methods, and further urge the construction side of the rectification of the repair and improvement until it meets the standard requirements and perception of quality standards. Requirements and perception of quality standards.

Decorative painting part, through the efforts of the construction side, I supervise the staff and the strict management of the engineering department of the A party, verticality, flatness, perception, etc. have been greatly improved, especially the 2 # building is to achieve basic satisfaction, as long as the construction process in the future to make persistent efforts to strengthen the management does not let up, I believe that we will certainly achieve satisfactory results.

The supervision of the project in 20xx, although some management deficiencies, but still achieve better results. Any effect achieved by our supervision work is inseparable from the support of the construction side and the cooperation of the construction side. We will work harder in the future supervision work, in line with the "strict supervision, warm service" purpose, strictly abide by the fairness, honesty, science, to ensure that the future supervision work goes smoothly. The following will be a group of one year of supervision work self-assessment summarized as follows:

First, the control of engineering quality:

The project supervision department of the project quality control principles:

① quality control throughout the entire process of project construction, the quality of the idea of first throughout the entire process of construction of the project in each link.

② project supervision engineers adhere to the principle of quality control throughout the process, not only the quality of the product, but also the quality of the work, the quality of the process, the quality of intermediate products;

not only the quality of the product formed to control the acceptance of the product, but also to the project in the pre-construction and construction process of quality control. ③ Check and acceptance of the quality of the project based on the design drawings, in accordance with the current construction specifications and quality assessment standards, and subject to measured data.

④ In the whole process of quality control control to adhere to the human-centered quality control. ⑤ Adhere to the supervision method of "strict control, active participation and warm service".

Reviewed the construction program of the construction party and the special program of the important process, and supervise the implementation;

Strengthened the inspection, the focus, the key parts of the side station;

Witnessed the sampling of the materials to re-inspection of the unqualified steel supervision of the withdrawal of two times;

The hidden works carefully in accordance with the specification requirements for acceptance before agreeing to carry out the next process, and the main works of the problem will not be accommodated. Problems in the main project will not be accommodated (such as 1 # building steel level error), the rework resolutely rework;

commercial concrete grade, slump, etc. are carefully checked;

energy-saving insulation materials in accordance with the specification requirements of the re-inspection.

Second, progress control:

The project A request schedule is very tight, the construction side according to the A request schedule compiled a total progress plan,

monthly plan, weekly plan. In the daily inspection process, found that the problem is timely pointed out to reduce unnecessary rework, reduce the impact on the construction progress. For the construction process of the many factors affecting the progress of the project, the Project Supervision Department to take the minutes of regular meetings, thematic meetings and other ways to study and supervise the construction unit is required to adjust the construction program in a timely manner, as far as possible to increase the number of parallel operations, cross operations and overtime work, etc., under the premise of guaranteeing the quality of the reasonable arrangements, scientific organization of construction, and strengthen the management of the construction of the overall progress of the plan to ensure that the goal of the construction plan to achieve. We do not relax the management of subcontracting units appointed by the owner, and convene the progress coordination meeting attended by relevant personnel to urge them to speed up the construction progress. The matters determined by the construction unit, timely reminder of the construction unit as early as possible arrangements to reduce the adverse impact on the implementation of the project progress plan.

Third, safety management:

1, strict implementation of the "Regulations on the Management of Safety Production in Construction Projects", the implementation of the current national laws and regulations on safety production, the rules and regulations of the competent departments of the construction administration and the mandatory standards for construction projects;

2, urging the construction unit to implement the production safety Organizational guarantee system, establish and improve the production safety responsibility system;

3, supervise the construction unit for workers to carry out production safety education and sub-parts of the project safety technology delivery;

4, review the construction program and safety technology measures. Check and supervise the construction unit, in accordance with the construction safety technical standards and specifications, the implementation of sub-parts, sub-projects or each process of safety measures;

5, supervision and inspection of the construction site of the fire work, winter cold, summer heat, civilized construction, sanitation and epidemic prevention and other work. Quality and safety comprehensive inspection, found illegal risky operations should be ordered to stop operations, found that the construction unit should be required to rectify hidden safety hazards, the situation is serious, should be ordered to stop rectification and timely report to the construction unit;

6, the project after I supervise the careful management of the staff, the support of the Party, the cooperation of the construction unit, the entire project has not occurred so far, construction safety accidents, civilization of construction was nominated for the Hubei civilized construction. Construction won the Hubei civilized construction nomination award.

Fourth, organization and coordination:

Because of the diversity and complexity of construction projects, but also because of the different projects involved in all aspects of the personnel and their combination of changes, so the site is responsible for the project director, the organizational and coordination capabilities of the high and low basically determines the effectiveness of the entire project supervision department.

1, how to deal with the relationship with the owners

The current engineering reality determines the master-slave relationship between the owners and supervision, many times the owners of the site supervision satisfaction is the only yardstick to measure the supervision work. So from the supervision company leaders to the project director's work center, are around how to make the owners satisfied. To deal with the relationship with the owners, the premise is to supervise the quality of their own business to be excellent, can not be easily authorized, in addition to the position and coordination of relations to pay attention to the position, as far as possible to leave room for manoeuvre.

2, how to deal with the relationship with the quality supervision station

On behalf of the government to exercise engineering supervision responsibilities of the quality supervision station (including safety supervision station and material supervision station), is the site of the supervision of the most important external coordination of the object, because supervision and inspection of supervision behavior is one of the main content of the work of the quality supervision station. Generally speaking, the coordination work of the quality supervision station is implemented by the contractor (construction unit). If the construction unit of good quality, public relations in place, supervision is relatively easy, because the site of the supervisory work and then try, it is impossible to everything;

If the construction unit of the site management is chaotic, but also refused to spend the effort to coordinate the relationship between the supervisor is very easy to be implicated by the construction unit and assume joint and several responsibilities, or be notified of the criticism, or by the owner of the penalties. In this case, the site supervisor is to do their own work, good at self-protection, the construction unit's violations of timely written request for rectification;

Second, we must urge the construction unit to do a good job on-site rectification of the work at the same time, but also to take up the corresponding public relations liaison, passive as active, and actively coordinate with the QA station's relationship. Quality Supervision Station is both the power sector, but also the authority, the smooth implementation of the project has a very important impact on the site supervision of the work also has a strong guiding role, so put some thought into early planning is very necessary. If properly coordinated, it is entirely possible to achieve benign interaction with the government supervision departments, for the site supervision work to add wings.

3, how to deal with the relationship with the construction unit

In fact, the relationship between the supervisor and the construction unit, more often than not, is an extension of the relationship between the supervisor and the owner. Some field supervisors, see the owner of the construction unit to take sides, will be tolerated, even the necessary self-protection is also given up, once the big problem, the responsibility to push can not be pushed off. Dealing with the construction unit, the most important thing is to correct the relationship between the two, the construction unit and the owner of the relationship is good, but also not the owner, although the owner of the personal interests of some people and the construction unit is connected, but this does not represent the fundamental interests of the owners and the overall interests of the supervisors to exercise the power of the contract and the law, do not need to the construction unit bowed down and bent over;

In turn, the construction unit is the pursuit of profit maximization. Construction unit and the pursuit of profit maximization, any payment is required to return, if the supervisor to give up the principle of sacrificing the interests of the owners, there is a price. Therefore, the construction unit only not humble, with a civilized attitude and professional skills to supervise in order to coordinate the relationship between the two sides, to win each other's respect.

4, how to deal with the relationship within the project team

Supervisors from all corners of the world, mobility, age gap, the level of good and bad, the professional each has its own strengths, each director hopes that their own men with strong business skills, high cultural level, good coordination skills, strong organization and discipline.

But the reality is often contrary to expectations, some of them have just entered the profession, can not stand alone;

There are words unwritten, misspelled;

There is a hard attitude, the construction unit to command;

There are self-righteous, do not listen to the command. In front of the market with low supervision threshold and fierce price competition, it is unrealistic to force high quality and low cost supervisors. Site supervision project team as a team, the most important thing is unity and centripetal force. Unity is about the whole, the foot has its own shortcomings, inch long. To pay attention to the advantages of each member, in addition to those who are free to loose, like to create disharmony or fear of hardship and tiredness, greed to invest in a small profit, resolutely cut off, as long as the value of the post, can be self-discipline can be used in their strengths;

centripetal force is that the director to play its core role, lead by example, the newcomer to encourage the spirit of learning as soon as possible to become a success;

to the veterans to stimulate the sense of honor, to strive for the top of the bench. V. Suggestions for the future development of the company:

The market is the source of survival of enterprises, and talent is the key to enterprise development. Competition between enterprises will ultimately be determined by the competition for talent, an enterprise is not easy to train people, train a talent is not easy, the company once the loss of a large number of talents, will be directly related to the rise and fall of an enterprise. Supervision is a highly intelligent, scientific and paid technical services. As a supervisory unit, it should be soberly realized that: the potential for great energy of highly intelligent composite talents is the most valuable wealth and source of survival and development of enterprises. In terms of talent, the following recommendations:

1, the establishment of talent management system to improve the competitive awareness of employees.

2, based on the long-term, strengthen the talent reserve work

3, pay attention to the introduction of excellent supervisory personnel, stabilization work.

4, in terms of employing people to follow the "capable, the mediocre to let the mediocre down" principle and the use of talent in an eclectic manner.

5, increase the training of supervisors.

Zhongyue Huangshi Park Project Supervision Department

Supervision Project Department Year-end Work Summary Part 3

I. Project Overview

1 Project Name: xx Industrial Park Phase I Project Workshop Plant.

2 Construction location: the project is located in xx Industrial Park, xx Town, xx City, xx Province.

3 types and characteristics of the project:

3.1 Scale of the project:

(1), xx Industrial Park Phase I project workshop plant, is one of the components of xx three-wheeled motorcycle Co., Ltd. daiyun industrial park project, built by the lightweight steel portal single-storey steel structure building. The building covers an area of 59,328 square meters, with a total floor area of 55,650 (design 54,446) square meters (including the workshop door ramp and 1.2-meter wall bulk water). The building height is 13.5 meters.

(2), construction by the design of a unified standard, structural consistency, the same specifications of the painting workshop and assembly workshop of two units of engineering, as well as a topcoat line, 2 pickling and phosphating line, 2 assembly line civil works. The construction content includes civil construction, steel structure construction, water and electricity construction works.

(3), the total investment estimate of about xxxx million yuan.

(4), the project construction time: xx years xx months - xx years x months

3.2 engineering structural characteristics:

(1), the project location of the geological stratum for the plains alluvial layer, the soil was sandy, high water content, poor stability. The project adopts three seven soil for holding layer foundation treatment, the main structure foundation using cast-in-place reinforced concrete bearing platform foundation.

(2), the project steel structure for the parallelogram heterogeneous planar structure, the horizontal axis is 300 meters long, the oblique axis is 90 meters long. The beam-column structure is welded combined H-beam, and the node connection adopts twisted-shear high-strength bolts. Painting requirements for the steel surface using shot blasting treatment up to Sa2.5 level, primer for the epoxy zinc-rich paint, intermediate paint for epoxy mica iron thickening, top coat for the oxidized rubber top coat.

(3), the project according to the Luoyang City earthquake intensity of 7 degrees, seismic acceleration of 0.10g defense. Production of fire hazard type category for Category D.

(4), the building roof waterproofing level of Ⅲ; the reasonable service life of the main structure of the building: 50 years for steel structure, 10 years for maintenance structure.

(5), the main material use specifications:

1) the civil part of the concrete is made of local commercial concrete C15, C20, C25, C30, and related seepage-resistant concrete; reinforcing bars are made of Ansteel HRB235, HRB335, HRB400 qualified steel;

2), the steel structure is made of Q345B (16Mn) low alloy high strength structural steel, Q345 ordinary carbon structural steel, cold-formed thin-walled steel.

4 project construction and implementation of the relevant unit directory:

4.1 construction unit: xx three-wheeled motorcycle Co.

4.2 quality supervision unit: Luoyang City, the General Bureau of Quality Supervision

4.3 design unit: Henan Zhibo Architectural Design Co.

4.4 supervision unit: Hubei Lianxing Construction Engineering Supervision Co.

4.5 General Contracting Unit: Hubei Industrial Construction Corporation

4.6 Civil Construction Unit: Hubei Industrial Construction Corporation Danyun Industrial Park Civil Construction Project Department

4.7 Steel Structure Construction Unit: Hubei Industrial Construction Corporation Danyun Industrial Park Steel Structure Project Department

4.8 Water and Electricity Construction Unit: Henan Pengcheng Fire Protection Engineering Co. strong> Second, the supervision organization, supervision personnel and input supervision facilities

1, according to the project characteristics, the project supervision body staff by the following table of personnel.

General superintendent engineer: 1 person;

General superintendent engineer representative: 1 person;

The main structure of the construction of the station: 4 people, civil and steel construction and installation of the combination of supervisory personnel;

Installation and renovation of the construction of the station: 4 people, civil, steel, water and electricity construction and installation of the combination of supervisory personnel;

Data information administrator 1 people 1 person (concurrently), safety supervisor.

2, put in the supervision facilities

Site by the construction unit to provide supervision office and drawings, supporting a set of office facilities.

Supervision company to prepare their own steel tape measure, computer 1, camera 1, vernier calipers.

The supervision facilities provided by the construction unit have all been transferred to the construction unit after the completion of the project.

Third, the performance of the supervision contract

In accordance with the supervision contract, the preparation of supervision planning, combined with the actual characteristics of the project, the timely preparation of the supervision of the implementation of the rules and regulations, and in the project before the commencement of construction in accordance with the "Construction Supervision Specification" requirements and the relevant supervision provisions of the program and other construction units into the site will be convened and a more detailed and specific written supervision work. The written supervision of the work, supervision process strictly fulfill the supervision contract, and in strict accordance with the construction law and the supervision of the relevant provisions of the supervision of the operation, and seriously exercise the responsibility, rights and obligations of the supervisory staff, and successfully completed the supervision task.

1, project progress control

In the process of supervision of this project, the progress of the project was controlled in accordance with the target duration agreed in the contract and relevant documents. Due to the natural disaster found steel structure column and beam collapse disaster, the schedule progress deviation. Project Supervision Department in time to take to enrich the supervision force, with the construction unit, the construction unit together with the negotiation to adjust the implementation of the project progress, timely convening of regular meetings of the site engineering, issued a supervision notice and other measures, according to the actual situation of the project at any time to adjust the project progress control program.

2, project quality control

(1) in the supervision of the project, the supervision staff in strict accordance with the contract, supervision specifications and construction specifications for the implementation of supervision and management, can actively cooperate with the owners of the work, and timely report to the owners of the quality of the project supervision, inspection, tracking and control, supervision staff to take the three diligence "diligently run, diligently check, diligently talk", in order to supervise the project, and to ensure the quality of the project. ", for the supervision of project quality has played a role. In order to ensure the quality of the certificate project, for technically weak construction units, supervisory staff for each process of the project to carefully check the check. In the construction of the project did not occur major quality problems or accidents.

(2) in the quality supervision station supervision and inspection, the overall quality of the project is evaluated better. But some problems were also raised. After supervision by the supervisors, these quality problems have been rectified.

(3) the project are through the construction, design, investigation, supervision, construction of five parties completion acceptance, according to the "Uniform Standards for the Acceptance of Construction Projects" (GB50300-2001), the unit project view evaluation for "good", the successful realization of the contract quality objectives.

3, the project investment control

(1) in the supervision of the project, the supervisory staff in strict accordance with the contract and the amount of work related to the change of documents, through the measurement of the amount of engineering entities by the superintendent of the approval of the project payment application certificate.

(2) engineering claims, supervision work focusing on the prior, during the control, timely change visa, and in accordance with the construction contract and procedures in advance to assist the construction unit for the construction unit to do the work to be done, in the whole process, the occurrence of some of the construction unit to the construction unit for the personnel nesting claims event, the supervision staff of the claim matters and the amount of money carefully reviewed, to achieve the investment control and contract management The goal.

4, engineering safety control

Supervisors regularly (weekly, holidays, changing seasons) on the construction site safety inspection,

Supervision of the project department year-end summary of the work of Part 4

It is now December 25, 20XX 15:4:19, the earth and then turn 6.628 circles 20XX year has passed. The past year under the correct leadership of the company and the project department, under the reasonable arrangement of the director, under the care and guidance of colleagues, with the company's quality objectives for the work, in the spirit of "unity and hard work, pioneering and pragmatic, scientific and fair, dedication," the spirit of the eight months of hard work (Note: I was April 26, 20XX to the Su'an company reported. Su'an company reported.) Through eight months' efforts (Note: I reported to Su'an on April 26, 20XX), I have basically completed all the work given by my superiors. As a member of Su'an Supervision Company, I would like to report the past year's work to the leadership as follows:

First, my main work content and completion of the year 20XX

April 27, 20XX to May 22, 20XX this period of time due to the main steam engine plant installation has not yet begun, so the leaders Let me be responsible for supervising the installation of the circulating jellyfish pipe in the domestic waste incineration power plant in Nanjing Jiangnan Vein Industrial Park. Due to the fact that there are not many things, during this period of time, I have also learned the practice of "four diligence" while doing a good job of supervising the installation of the circulating jellyfish pipe, i.e.: eye diligence, foot diligence, mouth diligence and hand diligence. Eye diligence is to seize the time to study the supervision specification, study the supervision service outline, study supervision planning, study the design institute drawings, study the drawings and instructions of the manufacturing plant, study and modify the construction unit to review a variety of installation work instructions. Foot hard is to insist on going to the construction site a few times a day, mainly in the field to familiarize with the basic features or characteristics of waste incineration power generation, the study of the difference between installation and overhaul. Mouth diligence is to ask more questions when finding problems, ask Mr. Zheng, ask other old supervisors, learn from them and ask for advice on how to do a good job of supervision. Hand diligence is to remember and write more, do a good job of supervision diary, do a good job of construction material inspection approval, do a good job of inspection batch review, do a good job of construction program approval, no special reasons for the backlog of construction unit approval of the written materials.

In 20XX, after the second half of May, my things began to gradually more and more. 20XX June 2, the plant's underground fire mains and water supply and drainage pipes to start. 20XX June 17, the chemical water plant to start. 20XX July 16, steam engine room 32/5 tons of traveling car began to be installed (20XX August 23, 32/5 tons of traveling car began to be put into use). 20XX August 9, #1 turbine began to start the installation. 20XX August 9, #1 turbine began to be put into use. Installation of #1 steam turbine started on Sep. 9, 20XX (passed the provincial quality inspection on Dec. 6, 20XX, and #1 steam turbine buckled successfully on Dec. 10, 20XX) Installation of #2 turbine started on September 27, 20XX (still continuing). installation of comprehensive water pump house started on August 2, 20XX (installation work finished on December 2, 20XX). ...At present, within the scope of my supervision, 80% of the fire water pipes of the whole plant have been completed, 60% of the industrial water pipes of the whole plant have been completed, 98% of the circulating water pipes of the whole plant have been completed, 95% of the rain water pipes of the whole plant have been completed; the chemical water workshop has been handed over to the commissioning; the comprehensive water pump house has been handed over to the commissioning; in the turbine room, the #1 turbine has been equipped with the conditions of the oil cycle, and the #2 turbine will have the conditions to buckle the big one by the end of December 20XX. In the turbine room, #1 turbine has the condition of oil circulation, #2 turbine has the condition of buckling the big cover at the end of December 20XX, and the feed water pump, deaerator and hot water tank have been handed over for commissioning.

The above is the work I did in the past year. I am doing supervision in the process of learning to do supervision. In the past year, I also prepared a steam engine professional supervision rules; visa opening records 26; visa installation records 36; visa #1 turbine turbine foundation settlement records; preparation of a bystander rules; preparation of a list of W, H, S control points; do the bystander and bystander records 9; preparation of a strong supervision implementation plan; visa strong checklist of two; open the work of the contact list 7; Approve 12 copies of construction program or work instruction. Visa one inspection report of alloy steel parts of #1 turbine; visa 10 records of concealed works; issue one rectification notice; visa one defect notice. And so on.

Second, in the past year, the experience of the work

In the past year I experience the following five points:

1. Obey the leadership arrangements, strengthen the theoretical and practical study, strict requirements for their own, seriously for the construction unit of passionate service, in accordance with the contract, in accordance with the supervision specification and supervision procedures, to fulfill the duties of supervision, is to do a good job of supervision. Fulfillment of supervisory duties, is to do a good job of supervision and to ensure the quality of the installation of the first condition.

2. For incoming materials (such as pipes, valves, etc.), in accordance with the standards and design requirements of the construction party to submit the relevant inspection information to verify the appearance of the material into the field quality checks on the appearance of the quality of non-compliance with the requirements of the ban on the use of the project is to ensure that the quality of the installation of the basic conditions.

3. In the construction process, the use of side, inspection, parallel inspection is conducive to the process control of each procedure, is conducive to the existence of quality and safety issues on site for investigation and research, is conducive to identify the root causes of the problem, is conducive to the supervision of the construction side of the implementation of the rectification is conducive to the elimination of similar problems again, is to ensure that the quality of the installation of the important conditions.

4. To accept the acceptance of hidden works in strict accordance with the acceptance specifications for acceptance, if the acceptance is unqualified, so that the rectification until qualified, in order to carry out the next process of construction, is to ensure that the quality of the installation of the necessary conditions.

5. Check the construction process of the problems found during the construction, timely use of verbal or written form to inform the construction unit, found that the problem of timely reporting to the director, and urge the construction unit to implement the corrective action and to carry out another review inspection. Do your best to do a good job of supervision of the construction phase of the project construction, is to ensure that the installation of the quality of the full conditions.

Third, the future work intentions

I intend to supervise the work process, strengthen the supervision of theoretical learning, pay attention to the current stage of the development of the state of the supervisory industry, and further experience as a supervisory staff, should be proactive for the interests of the construction unit, for the quality of the project is responsible for the construction personnel responsible for the importance of safety. The program will be organized in the following ways: (1) to improve their professional skills and to Further improve their professional skills and comprehensive quality, cultivate their own good professional ethics, do a good job of supervision, reflecting the law-abiding, integrity, justice and fairness of the code of practice, set up a correct attitude of supervision, with a pragmatic approach to deal with various issues arising in the construction work, proactive use of their own professional and technical skills and wisdom, the exercise of scientific and fair supervision of the right and obligation, and the construction unit to work well with the construction, to meet the needs of the construction unit, and to improve the quality of work. Work well with the construction unit to meet the requirements of the construction unit, to provide quality and efficient service for the owner. Seriously complete the work assigned by the leadership, and strive to improve their professional and technical level to a new level, and strive to make themselves a truly qualified supervisory personnel. For Su'an supervision company to win the honor.

The above is my 20XX annual work summary, if not appeasement, please give advice.

These are the summaries of my work in 20XX.