311 Accident Investigation Report Part 1
At about 12:00 noon on May 4, 20xx, a dump dump truck (Yunp:13531) sent by Huaping Red Brick Factory transported the red bricks to the new town of Nyingchi County constructed by Luzhou Construction Engineering Company of Sichuan Province, and constructed the second phase of the residential building project of the new area. When unloading the red bricks next to the 30th building, the rear wheels of the vehicle were too heavy, causing the rear wheels of the vehicle to sink, and the dump truck could not unload the bricks from the vehicle smoothly, so the driver took the liberty of arranging for the migrant worker Sharha and other workers to help unload the vehicle, and when the workers were unloading the vehicle, the rear doors were not disposed of in a stable manner, resulting in the fall of the rear doors and hitting the head of the migrant worker Sharha who had been unloading the bricks, which resulted in Sharha's head being seriously injured, and the project department of the company received the The project department of the company received the call and immediately started the emergency rescue program for safety accidents and promptly organized the personnel to send the injured to the hospital in Ninglang County, due to the seriousness of the injuries, the hospital made every effort to rescue and died.
At 12:37, Liu Liguo called to the project safety supervision and management station in Ninglang County to report the case, saying that one person on the site was hit by the door of the car under the brick, and was sent to the hospital for rescue, and he did not know whether he died or not. After receiving the report, Xu Lifang, the leader of the County Construction Bureau in charge of safety, and two comrades from the Safety Supervision Station, Li Jinfeng and Yang Zhiping, rushed to the scene of the accident to conduct on-site investigation; at the same time, Yang Xinhong, the deputy director of the Safety Supervision Bureau, Mao Yingguo, Yang Kailong, and Yang Zu, chief of the Daxing Township Police Station, and other comrades of the unit arrived at the scene, and comprehensively started the investigation work and aftermath disposal work for the safety accident of "54". The investigation of the "54" safety accident and the aftermath of the work. In the afternoon, the county people's government and the deputy governor of Junqiang further instructions.
May 5, 9:00 am or so, the County Safety Supervision Bureau convened the Supervision Bureau, Construction Bureau, Daxing police station, trade unions and other relevant departments, set up an accident investigation team to investigate, after on-site investigation, witnesses questioning, check the Sichuan Luzhou City, construction engineering companies of various qualification certificates and safety management organizations, systems, education records, etc., so far, the accident has been basically investigated, the accident is reported as follows. The accident investigation is now reported as follows:
I. Background of the accident
Sichuan Luzhou City Construction Engineering Company is a construction enterprise attracted by the county people's government to develop the construction of the new area of Nyingchi in Nyingchi, and it has a Certificate of Qualification for Building Construction, Certificate of Safety Production License, etc., and a sound safety production organization and management system. The vehicle that was involved in the accident, Yunp:13531, was self-assigned by the brick factory, transporting red bricks to the construction site to sell them to the Sichuan Luzhou Construction Engineering Company, which had not signed a certificate of responsibility for work safety with the Sichuan Luzhou Construction Engineering Company. The car owner is Yang Wenhua, and the driver Li Yong (ID: 533224198602162117) is the uncle and nephew relationship.
Second, the accident occurred
May 4, 20xx at about 12:00 noon, cloud p:13531 dump dump truck transport red bricks to the construction by the construction engineering company in Luzhou City, Sichuan Province, the construction of the new area of development and construction of residential phase II of the Ninglang County, next to the 30 buildings, in the dump truck dump truck unloading of red bricks, due to the vehicle's rear wheels loaded with too much weight, causing the vehicle cloud p13531 rear wheels sagging, the vehicle can not be successfully unloaded out of the rear wheels of the vehicle. Dump trucks can not be smooth self-unloading out of the car bricks.
On the arrangement of the cement under the migrant workers Sharha and other workers to help unload the car, in the workers unloading the car, due to the upturned rear door is not handled properly, resulting in the rear door drop, hit to the next brick Sharha head, resulting in serious head injuries, the company's project department received a call, immediately start the emergency rescue plan for safety accidents in a timely manner organization of personnel to send the injured to the county hospital, by the hospital all-out rescue, due to the more serious injuries, the death of the rescue. After all efforts to rescue the hospital, due to the seriousness of the injury, the rescue failed and died. At the same time reported to the Safety Supervision Bureau, Construction Bureau, Daxing police station and other relevant departments.
Third, the accident caused casualties and economic losses
"54" accident caused one death and one injury, of which: Sharha, Yi, death, ID number: 53322419671020xx56 belongs to the Sichuan Luzhou City, Sichuan Province, construction engineering company of migrant workers; Li Xuehua, Yi, minor injuries, has been discharged from the hospital, belongs to the Sichuan Province Luzhou City, construction engineering company. Now has been discharged from the hospital, belongs to the Sichuan Province Luzhou City Construction Engineering Company migrant workers. The accident caused economic losses of about 30 million yuan.
Fourth, the cause of the accident and the nature of the accident
According to "production safety accidents and investigation and treatment of regulations" and "enterprise staff casualty analysis planning" requirements, "54" safety production accident occurred for the following reasons:
First, the direct causes
1 The driver of the vehicle transporting bricks, Yunp:13531, Li Yong, violated the rules of command, illegal operation;
2, the deceased Sharha and his accomplices violated the operating procedures, violation of labor discipline, in the dump dump truck can not be successfully unloaded out of the car when the bricks, did not have to fix the rear door, in the rear door under the operation, resulting in the rear door drop, and hit Sharha's head, so Sharha died.
Second, the indirect causes
1, Nyingchi Construction Bureau of the construction enterprise supervision is not in place, there are regulatory loopholes and blind zones;
2, Luzhou City, Sichuan Province, the construction engineering company hired by the company's migrant workers safety education is not in place, the company's migrant workers lack of the necessary knowledge of safety, safety awareness of production, lack of self-protection, which is the root cause of the accident. This is the root cause of the accident.
Third, the nature of the accident
Through the investigation and evidence collection, it was determined that the accident that occurred in the second phase of the new urban area project in Ninglang County at around 12:00 a.m. on May 4, 20xx was an accident of work safety responsibility caused by unauthorized command and unauthorized and illegal operation.
IV. Determination of Responsibility for the Accident and Punishment for the Person Responsible for the Accident
The Ninglang Project Department of Sichuan Luzhou Construction Engineering Company had a standardized production safety management system, but did not carry out serious management, command and supervision of construction operations on site according to the system, and was held secondarily responsible for the accident, according to the Measures for Administrative Punishments for Production Safety Violations, paragraph 1 of Article 44 of the Measures for Administrative Punishments for Production Safety Violations, Paragraph 3, paragraph 4 and the provisions of Article 66 of the Regulations on the Administration of Work Safety in Construction, a fine of 10,000 RMB was imposed on the Ninglang Project Department of Sichuan Luzhou Construction Engineering Company.
Sharha and his accomplices violated labor discipline and carried out operations without supporting and stabilizing the rear door, causing a production safety accident and taking the main responsibility for the accident. However, because Sharha was dead and his accomplices belonged to a vulnerable group, his punishment was borne by the Ninglang Project Department of Sichuan Luzhou City Construction Engineering Company, and he was no longer punished. Li Xuehua and others need to be educated and trained on safety production knowledge by the County Construction Bureau before returning to the production line to improve their awareness of safety production.
V. Accident prevention measures and recommendations.
1, it is recommended that the county construction bureau to increase the supervision of building construction enterprises, combined with the "county safety production hidden trouble centralized investigation and rectification of special action" on the building construction industry industry site management chaos, the enterprise practitioners of production safety awareness of weak, unauthorized command, unauthorized operation of the phenomenon of serious and other status quo, a cleanup and rectification, crack down on the site of the production safety knowledge training. And rectification, crack down on site management chaos and illegal command, illegal operation and other behavior, to stop the "54" accident similar to the accident occurred again.
2, "54" accident occurred, exposed the enterprise on the operating personnel management chaos, supervision is not in place, especially equipment and personnel supervision is not effective, through the "54" accident seriously analyzed, and put forward the following rectification proposals:
(6) Strengthen the closed management of the construction site and the registration system for people coming and going.
(7) The management of raw materials to and from the command of a person, and tracking and supervision of the implementation.
(8) Strengthen the management of temporary electricity, scaffolding, construction equipment, protection of the four mouths and five edges of the construction site, construction site and other parts of the construction site.
Signature of the investigation team members:
311 Accident Investigation Report Part 2
A, before?
Shanghai Jing'an fire is the most serious fire accidents in 20xx years. Its casualties, property losses and the resulting social impact are the focus of recent public discussion. The Jing'an fire has passed, but the accident is not really finished, followed by the mourning of the dead, the comfort of the living and the people and the government's warning, the responsibility is heavier than Mount Tai.
Purpose of the investigation: the Internet will be the main resource, to complete a round of the overall report, the whole Jing'an accident before and after the cause and effect of the show to everyone, and put forward the views of our members of the group for the accident.
The significance of the investigation: exercise our group members to collect information, integrate information and the ability to analyze the information, experience the benefits of division of labor and cooperation, and through the Internet investigation, experience the process of screening information, understand the basic matters of the investigation and the format of the investigation report.
Second, the cause of the fire
2 welders illegal implementation of the operation after a preliminary analysis, the fire building in the renovation work construction, there are 2 welders illegal implementation of the operation, in a short period of time to form a dense fire.
The accident also revealed five aspects of the problem: welding without special operators qualification certificate, serious violations of operating procedures, triggering the fire fled the scene; renovation works illegal, layers of multiple subcontracting, resulting in the implementation of safety responsibilities; construction site management chaos, safety measures are not implemented, there is an obvious rush, rush progress, construction of the raid behavior; the accident site irregularities using a large number of nylon mesh, polyurethane foam, and the use of the fire. A large number of nylon nets, polyurethane foam and other flammable materials, resulting in the rapid spread of the fire; the relevant departments of safety supervision is not effective, resulting in multiple subcontracting, multiple operations and unlicensed welders on the job, the shutdown after the resumption of the project safety management is not in place.
Third, the rescue process
Government:
1, 2:05 pm around the floor of the fire
2, 14:16 pm, received a fire alarm call
3, the 18th minute after the fire alarm, there are fire vehicles appeared at the scene of the fire to rescue. Immediately following the arrival of the ambulance, the fire engine used a water hose to put out the fire and rushed into the building to rescue people.
4, 14:40 hours, the police helicopter has also been rushed to the scene
5, 15:30 hours to use the elevated ladder and high-pressure water cannons to start controlling the fire
6, 15:50 hours, the three police helicopters have been flown to the top of the burning building, the implementation of the rope drop rescue trapped in the roof of the residents.
7, 16:00 hours, the police helicopter flew away from the top floor.
8, 18:30, the fire was basically extinguished, firefighters entered the fire scene in a timely manner, layer by layer to clean up the residual fire, carefully search and rescue the residents of all floors, 200 officers and men door-to-door search and rescue; 45 fire brigade 122 fire engines deployed to rescue more than 100 people
Residents of the self-help:
1, sensible people affected by the disaster decisively shut off the power and gas, with wet Towels to cover their faces
2. Many people ran directly to the scaffolding outside the building to escape the fire
3. Some people jumped down from the upper floors
4. Ran to the roof of the building to call for help
5. Waiting for rescue in the same place
4. Post-disaster resettlement and compensation
Treatment of the injured:
The Shanghai Municipal Health System The first time to go all out to treat the injured, 120 city medical emergency center mobilized 30 ambulances to rescue, transfer the injured and put into the emergency security work. Nine hospitals to receive the injured medical staff stayed up all night, all-out rescue fire injured.
Disaster victims resettlement:
Emergency arrangements for more than 700 rooms in 16 hotels, the fire building as well as the other two buildings in the same neighborhood of the residents of more than 800 people emergency resettlement to the hotel. For that night more than 30 households can not find relatives of the affected households, Jing'an District arranged to accompany them to the hospital, the reception point and each settlement to look for relatives, to carry out psychological guidance and other work. 16th morning, Jing'an District arranged to find relatives to the funeral home to recognize the victims. At the same time, Jing'an District has sent the first batch of temporary relief money to the hands of residents, and in the region to raise the first batch of more than 2.4 million yuan of donations.
311 Accident Investigation Report Part 3
xxxxxxxxxxxxxx Company
Workplace Accident Investigation Report
Injured Employee's Department: Name: Sex: Age:
Date of Accident: Time of Accident: x year x month Place of Accident: xxx
Employee's regular job: xxx Job performed at the time of the accident: xxx
Time of joining the factory: x years x months Length of service: x years
Witness at the scene of the accident: xxx Injury: Injured part: Treatment provided: (stitches, medication, or other)
Job assignment at the time of the accident: Please describe the equipment or object that directly caused the employee's injury:
Accident findings:
What was the employee doing:
List tools used:
List personal protective equipment used:
How often does the employee engage in this activity?
□ Daily□ Weekly□ Monthly□ Less than once a month□ Previously□ Never Is this activity part of normal work? □ Yes □ No
Is there a standard operating procedure for the work task being performed by the employee? □Yes □No
Do workers follow standard procedures? □Yes □No , if not, describe how it was done in violation of the standard procedures:
Analysis of the cause of the accident:
Preventive measures and programs:
The report is filled out by: Position: Supervisor: Date:
General Manager's approval:
311 Accident Investigation Report Part 4
**Tunnel **inclined shaft workers fall safety accident
Investigation report and treatment opinion
Accident unit: China Railway ** (Group) the first engineering limited liability company
Accident time: 20xx *** day ** time ** minutes
Accident occurred in: ** to ** railroad passenger line **
Accident location: ** to ** railroad passenger line **
The accident is the result of a major accident in the tunnel.
The accident occurred after: 20xx * month **, the evening of 21:50 or so, the second inclined shaft integrated class workers *** (male, Han nationality, born in 19** year **, ** province ** ** city ** county Xiaoxi township ** village ** group **, 20xx * month ** to the second team of the second inclined shaft integrated class) in the evening out of the dormitory door in the dormitories not far away from the concrete road due to the slippery road and the poor lighting on the road at night. After leaving his dormitory at night, he fell on the cement road not far from his dormitory due to the slippery road surface and the poor lighting effect and unclear vision on the road at night, which eventually caused a fracture of the upper part of the elbow joint of his left arm and a crack in one part of the bone. After the accident, the comprehensive shift leader *** immediately reported to the person in charge of the No. 2 inclined shaft hole, and the comprehensive shift leader *** was sent to the Third Hospital of **** City in time, arriving at 1:00 a.m. The accident occurred in the morning, and was reported to the person in charge of the No. 2 inclined shaft hole. The cause of the accident analysis: after the accident, our team formed a corresponding accident investigation team, accident investigation team to the scene according to the "four do not spare" principle of investigation. The investigation team through the accident scene investigation and related personnel investigation and evidence analysis; that the accident has the following aspects of the reasons:
1, the main reasons:
(1) rainy days slippery road and integrated class dormitory night lighting lighting is insufficient.
2, indirect causes:
(1), the integrated class workers are not enough safety awareness, in the rainy days rain will accumulate on the road surface
will lead to slippery road surface, and the integrated class workers did not wear non-slip rain boots.
(2) The cement road in front of the dormitory of the integrated class does not have some corresponding protective settings for the slippery road in rainy days.
(3) The labor insurance products were not issued in time.
Nature of the accident: This accident is a liability accident.
Accident Type: This accident is recognized as a minor injury accident, belonging to the type of personal injury accident.
Accident responsibility analysis and treatment recommendations:
In accordance with the principle of "four spares" in accident handling, according to the company signed the "20xx security target management responsibility", "security responsibility and accountability system for accidents" and "production safety responsibility system" and other relevant provisions of the company, through the accident investigation and cause analysis, it is recommended that the accident unit and its staff should be punished for the accident. Cause analysis, it is recommended that the accident unit and the relevant responsible person to deal with the following:
1, the injured person *** check, care costs, such as hidden follow-up costs by the West into the project department frame two team and the parties involved in the negotiation to solve.
Accident prevention and corrective measures:
In order to draw lessons from the accident, improve the ability to prevent, strengthen the site safety management, to prevent similar accidents from happening again. Through the investigation of the cause of the accident, on-site understanding and analysis, the following precautionary and corrective measures were formulated:
1, strengthen
2, give the workers and team managers full configuration of the whole team's safety education and training, to cite one to prevent the next time a similar accident occurs again. Non-slip rain boots.
3, in the work shift dormitory and team dormitory around the increase in lighting facilities, to ensure that the night light enough.
4, in the work shift dormitory and team dormitory around the increase in safety signage, play to remind the work shift workers and team management personnel to pay attention to the purpose of safety in the rainy days and night walking.
311 Accident Investigation Report Part 5
1.Purpose
In order to do a good job of all kinds of industrial accidents report and investigation and treatment, and to actively take all effective protective measures to avoid or prevent the occurrence of similar accidents, according to the relevant laws and documents of the State, the provisions of this regulation have been formulated.
2. Scope of application
This document applies to the management of reporting and investigation of work-related accidents of Shanghai Volkswagen (including Shanghai Volkswagen plants and Shanghai SAWV Sales Co., Ltd.).
3. Definitions
3.1 Work-related accidents: Work-related accidents referred to in this regulation refer to personal injuries and acute poisoning accidents occurring in the course of production and labor of employees.
3.1.1 Attempted incident: refers to an incident in which the conditions for the occurrence of an accident are already in place, or which occurs but does not result in casualties.
3.1.2 Bandaging/First Aid Incident: an injury that has been treated briefly with medicine kit drugs or in the infirmary and does not require further hospitalization to continue working.
3.1.3 Recordable Accident: an injury that occurs where it is temporarily difficult to continue the original job description after hospital treatment, but without loss of a second workday.
3.1.4 Slightly injured accidents: refers to disabling work accidents where the loss of working days is greater than 1 day and less than 105 days according to the "Accidental Injury Loss of Working Days Standard (gb/t15499-1995)"
3.1.5 Seriously injured accidents: refers to disabling work accidents where the loss of working days is equal to and more than 105 days according to the "Accidental Injury Loss of Working Days Standard (gb/t15499-1995)". working days equal to and more than 105 days of incapacitating work accidents.
3.2 Occupational Disease: refers to the diseases caused by the exposure of workers to dust, radioactive substances and other toxic and hazardous substances in the course of their occupational activities, within the scope of the statutory occupational diseases expressly stipulated by the competent government departments of the State, and diagnosed as occupational diseases by the medical and health diagnostic institutions approved by the local health administrative departments.
3.3 Accident handling "four do not let go": the cause of the accident analysis is not clear do not let go; the accident responsible for the people and the public have not been educated do not let go; no precautionary measures do not let go; the person responsible for the treatment of do not let go.
4. Responsibility
4.1 fire and safety (msf) is the company's investigation and handling of workplace accidents in the competent authorities, the organization or participate in the investigation of workplace accidents within the company, processing, rectification tracking and management.
4.2 safety and security planning and control (msp) is responsible for the identification of work-related injuries application and work-related injuries leave, work-related injuries file management.
4.3 Occupational health (msh) is the competent authority for occupational diseases and medical aid for work-related injuries in the company, and is responsible for the management of occupational diseases, medical aid for work-related injuries, work-related injury rehabilitation situation and labor capacity appraisal in the company.
4.4 Personnel (mp) is the competent authority for the treatment of injured employees, responsible for the management of the treatment of employees injured at work.
4.5 The departments at all levels of the incident are the responsible departments for the accident treatment, responsible for the rescue of the accident scene, reporting the accident, organizing or participating in the investigation of the accident, submitting the materials of the work injury, appeasing the injured employees and their families, and implementing the corrective measures.
4.6 The labor union participates in and supervises the investigation and treatment of all kinds of employee injury accidents and occupational diseases as well as the aftermath work.
4.7 The administration of the Shanghai and overseas factories is responsible for (or cooperates with) the reporting, investigation, treatment, rectification and implementation of workplace accidents in the Shanghai and overseas factories, as well as medical assistance, application for recognition of workplace injuries, management of workplace injury leave, appraisal of work capacity, and treatment of workplace injuries to appease the injured employees and their family members, and so on.
5. Provisions
5.1 Reporting of workplace accidents
5.1.1 After the occurrence of workplace accidents, the accident scene should immediately report the relevant personnel belonging to the k2 department, which involves casualties, but also report the msh/Huwai factory administration, and should be taken in a timely manner to take self-help, self-help measures, to prevent the expansion of the accident, reduce casualties and property losses.
5.1.2 After receiving the accident report, the leader of the incident k2 department shall immediately report to the affiliated r1 department, the affiliated departmental union, the branch union, msf, mp or the administration of shanghai outside factory, and send the injury report to the company's msf within 12 hours of the occurrence of the accident.
5.1.3 The incident belongs to the affiliated r1 department, msf, mp, the branch union, the shanghai outside factory After receiving the serious injury and above work accident, the administrative department should report to the higher department directly or by telephone step by step until the general manager of the company and the chairman of the labor union.
5.1.4 After receiving the report of serious injury and above work accident, the general manager of the company and the chairman of labor union shall report to SAIC Group Safety Supervision Center, District Safety Supervision, Public Security, Procuratorate, Labor Union and other relevant departments in a timely manner according to the nature of the accident, and SAIC Group shall report to the relevant administrative departments of the Municipal Bureau according to the law; after receiving the report of serious injury and above work accident, the person in charge of Shanghai factory and the chairman of labor union shall report to Shanghai Municipal Bureau in a timely manner according to the nature of the accident. After receiving the report of serious injuries and above, the person in charge of the factory outside Shanghai and the chairman of the labor union should, according to the nature of the accident, report to the headquarter of Volkswagen Shanghai in a timely manner and report to the local administration of work safety supervision, the labor union, the local public security department and the People's Procuratorate according to law.
5.1.5 The content of the accident report includes:
(a) Overview of the department in which the accident occurred;
(b) Time and location of the accident and the accident scene;
(c) Brief description of the accident;
(d) Number of casualties that the accident has resulted in or is likely to result in (including number of people whose whereabouts are unknown);
(e) Number of persons that the accident has caused or is likely to cause (including number of persons who are unaccounted for);
(f) The number of persons who have been killed or wounded.
(e) a preliminary estimate of the direct economic losses;
(f) the accident control situation, the measures that have been taken;
(g) other reportable conditions.
5.1.6 Accidents in the emergence of new circumstances, should be promptly reported. New circumstances mainly refers to:
(a) the accident occurred within 30 days from the date of occurrence, the number of casualties changed;
(b) road traffic accidents, fire accidents occurred within 7 days from the date of occurrence, the number of casualties changed.
5.1.7 After the accident, the relevant departments and personnel should properly protect the accident scene as well as the relevant evidence, and no department or individual shall damage the accident scene or destroy the relevant evidence.
Rescue personnel, prevent the expansion of the accident and traffic and other reasons, the need to move the scene of the accident objects should be marked, photographed or drawn a sketch of the scene and make a written record, and properly preserved the scene of the important traces, physical evidence.
5.1.8 In case of emergency, all relevant personnel can report to the next level.
5.1.9 msf received the accident report, should be in accordance with the company's regulations or leadership requirements reported to the two offices, and instructed to supervise the investigation of workplace accidents lead department to set up an accident investigation team, to carry out the investigation and handling of accidents.
5.2 Workplace accidents on-site treatment
5.2.1 Workplace accidents occurring k2 departmental leaders receive the accident report, should immediately start the corresponding production safety emergency rescue plan, personally or designated personnel to the scene, to protect the scene of the accident, marking, and quickly take measures to rescue people and property, to prevent the further expansion of the accident.
5.2.2 After the occurrence of industrial accidents, the incident k2 department should immediately organize the operating personnel at the scene of the accident, convene an on-site meeting to inform the accident, do a good job of the staff's ideological work, sum up the lessons of the accident, and make preparations for the continuation of production.
5.3 Workplace Accident Investigation Team Composition:
5.3.1 Attempted incidents, bandaging/first aid accidents, and recordable accidents are led by the incident k2 department, and an accident investigation team is formed by the organization of the union of the k2 department, the production, technology, and the safety professionals.
5.3.2 Minor injury accidents are led by the incident r1 department, organizing the incident k2 department, the incident r1 department union, subunion and other relevant production, technology, safety professionals to form an accident investigation team.
5.3.3 Serious injuries, fatal accidents by the district people's government to take the lead, the organization of the District Safety Supervision Bureau, the District Federation of Trade Unions, the supervisory organs, the Procuratorate, the Public Security Bureau and other relevant personnel to form the accident investigation team; Shanghai outside the factory by the local people's government to take the lead, the organization of the local Safety Supervision Bureau, the General Federation of Trade Unions, the supervisory organs, the Procuratorate, the Public Security Bureau and other relevant personnel to form the accident investigation team; the person in charge of the company or its designated departments Should take the lead, the organization of the incident r1 department, branch trade unions and the company's trade unions and related production, technology, safety professionals to form an accident investigation assistance team.
311 Accident Investigation Report Part 6
I. Workplace Accident Investigation Report
1, after the occurrence of workplace accidents, the injured person or the scene of the relevant personnel should immediately report to the shift, the project department or the company's relevant person in charge and safety supervision section.
2, the person in charge of the project department or the company shall immediately report to the competent department and other relevant functional departments upon receipt of the accident of serious injury or death or above.
3, should be as far as possible to protect the scene, quickly take the necessary measures to rescue people and property, to prevent the expansion of the accident.
4, such as special circumstances require damage to the scene, the scene should be marked or recorded.
Second, the investigation and analysis of work-related accidents
1, minor and serious injuries by the company manager or deputy manager in charge of safety to organize the safety, technology, production and other departments and members of the trade unions to form an investigation team to carry out investigations.
2, where the higher authorities intervene in the accident, the company as required to do their best to actively assist in the investigation.
3, where the investigation involves units and individuals, must be truthful to the relevant personnel to answer questions, provide relevant evidence and testimony. Not allowed to make false statements and conceal the truth of the accident.
4, by the Company to deal with the investigation of workplace accidents must find out when the accident occurred, location, through, cause, casualties, economic losses.
5, held an accident analysis meeting to determine the views of the accident handling preventive measures proposed.
6, write an accident investigation report.
Third, industrial accidents and archiving
1, by the Company to deal with industrial accidents, must be written in the accident investigation team accident investigation report by the company to convene a special meeting to study and deal with.
2, the results of the accident should be publicly announced to the entire company cadres and workers. And the entire accident handling situation to write a written report to the relevant departments.
3, the accident must be handled fairly and reasonably, not to accommodate, not to avoid, to achieve the accident "three do not spare".
4. If you are not satisfied with the handling of the Company, you can raise objection and sue the higher authorities.
5, the accident processing case, the company's safety section is responsible for the collection and organization of all relevant materials, archives and cards.
6. The company will be responsible for the approval procedures of work-related injuries.