Request: a trial production report
Trial production application report & lt; & gt; the preparation of the requirements of the construction unit after the completion of the project should be approved by the environmental impact of the project environmental protection department in charge of the administrative department to apply for trial production, the environmental protection department receives the application, after the on-site inspection, to confirm that the project's environmental protection facilities have been implemented in accordance with the requirements of the approval of the trial production. At this time the project can be put into use (trial production stage). Construction units in the application must be submitted to the project trial production application report & lt; & gt; and "three simultaneous" audit sheet (copy), trial production application report & lt; & gt; the basic requirements for the preparation of the project is to faithfully reflect the overall situation and the implementation of environmental protection facilities, the application report & lt; & gt; the main contents of the report are as follows: First, the project profile 1, project name and nature of the project name project Address the name and nature of the construction unit (sole proprietorship, joint venture) nature of the construction project (new, alteration, expansion, technological transformation) covers an area of the building area 2, environmental approval documents ............. Year ...... month by ............... unit to prepare the environmental impact report or table, (Shanghai Municipal Environmental Protection Bureau approval number). ............. Year ...... Shanghai Municipal Environmental Protection Bureau to review and approve the construction plan design ("three simultaneous" sent for review), (please attach a copy of the "construction project" three simultaneous "audit sheet"). 3, the main contents of the project project should include the main project and ancillary facilities, including the following aspects: the total investment, including investment in environmental protection; main Product name, design production capacity; the name and amount of major raw materials, fuels, water consumption, drainage, etc.; the main production process; the main production equipment and auxiliary facilities, such as boilers, substations, etc.; green area, greening rate of two, environmental protection facilities, environmental protection facilities should reflect the name of the environmental protection facilities, type, processing technology, design capacity, equipment installation and commissioning, including the following aspects: waste water, waste water, waste water, waste water and waste water. Several aspects: wastewater, including production wastewater, sewage, content should include the total amount of wastewater, **** there are several sets of wastewater treatment facilities, each set of facilities, treatment processes, the expected treatment effect, the direction of discharge of treated wastewater, if included in the municipal wastewater treatment plant should be provided with municipal water supply and sewage plant contract, if included in the combined sewage mains should be provided with municipal water supply and pipeline proof. Exhaust, including process exhaust, boiler fumes, sewage treatment odor, kitchen fumes, and other harmful to the environment, harmful to the health of the various exhaust, the content should include a variety of exhaust treatment process, the height of the exhaust, exhaust volume, location, etc.. Noise, should reflect the source of noise, the location of the noise source, noise reduction measures (such as vibration damping, closed, acoustic insulation, etc.). Solid waste, including the production process may produce slag, wastewater treatment sludge, waste gas treatment dust, slag, etc., focusing on the national definition of hazardous waste, solid waste treatment and disposal, including internal recycling, entrusted to other units of comprehensive utilization, as well as entrusted to other units of environmentally sound treatment and disposal, where entrusted to other units of treatment and disposal of all should be provided with the commissioning contract, such as hazardous waste, acceptance of the Hazardous waste units must have the Shanghai Municipal Environmental Protection Bureau issued a business license, if the acceptance of hazardous waste is not the city's enterprises, but also must provide the enterprise where the provincial environmental protection department's certificate. Environmental protection management and monitoring organizations, including personnel preparation, training, testing instruments, monitoring equipment, preparation, implementation; environmental protection facilities management and maintenance system, environmental protection facilities post operating system, emergency response system and other environmental protection management system development. Problems and corrective measures. Against the project environmental impact assessment, "three simultaneous" approval requirements, to identify existing problems (including engineering and management problems) and gaps in order to make the environmental protection facilities and the theme of the project and put into use at the same time to put forward corrective measures. Rectification measures should include specific rectification content, implementation of the responsible person, time schedule.