Enterprise Hail and Thunderstorm Emergency Plan
In daily learning, work or life, sometimes there will be some emergencies, in order to control the development of the accident, it is necessary to carry out in advance the meticulous preparation of the emergency plan. How should we prepare an emergency plan? The following is my collection of corporate emergency plans for hail and thunderstorms, I hope to be able to help you.
Enterprise hail and thunderstorm emergency plan 1
A preparation and safety precautions
1, close the high and low-voltage distribution room, transformer room, control room doors and windows in a timely manner.
2, check whether the emergency power supply is normal and sufficient.
3, check whether the lightning arrester is normal operation.
4, check whether the flood control equipment can be used normally, the pump wiring has no broken skin, whether the grounding wire is reliable and other safety hazards, spare flood control equipment can be put into operation in a timely manner.
5, prohibited in the outdoor high-voltage equipment and indoor introduction line maintenance and testing.
6, lightning weather is strictly prohibited reverse operation.
7, such as the occurrence of a serious threat to personal safety, may not wait for instructions to disconnect the power supply, but should be immediately reported to the scheduling and leadership, and make a record.
8, in the event of more than six winds and thunderstorms and other inclement weather, outdoor work should be stopped.
9, the upper and lower lines due to lightning blackout according to the emergency blackout contingency plan.
10, thunder and lightning to minimize the individual inspection of high-voltage and low-voltage electrical equipment, the need to inspect high-voltage equipment, are not allowed to carry out other maintenance work, are not allowed to move away from or over the fence.
11, thunder and lightning, not allowed to take shelter under the steel building, tall trees, not allowed to approach the lightning arrester and lightning rod.
12, thunder and lightning, not allowed in the open outdoor dialing and answering communication devices.
13, high-voltage equipment grounding, indoor personnel should be 4m away from the fault point, outdoor personnel should be 8m away from the fault point. Into the above range of personnel should wear insulated boots, contact with the shell and frame of the equipment, should wear insulated gloves.
14, encountered a thunderstorm, computer users should immediately cut off the computer power supply, and unplug the power plug and access to network equipment network cable plug. And unplug the connection line of the external equipment.
15, pay close attention to the computer and network system operation after the thunderstorm, such as power tripping and other power supply failure, affecting the normal operation of network equipment, information systems, should be contacted as soon as possible to the relevant departments of the power, network equipment to repair, and make every effort to ensure that the network, communication safety and smooth.
Second, the abnormal thunderstorm weather emergency response plan
1, abnormal thunderstorm concept: refers to the local or most of the area suddenly fell fog, heavy rain, a serious crisis of production and safe operation, there is a major personal injury, equipment damage accidents may occur.
2, the plant hazard level analysis: abnormal fog, heavy rain, thunder of the weather, resulting in part of the line tripped, high and low voltage into the water, cooling shed, finished product warehouse into the water combustion and explosion accidents.
2.1 Cooling shed: heavy rain due to sudden increase in water level, poor drainage, water flow people cooling shed caused by fire and explosion.
2.2 Finished goods warehouse: strictly prevent the rainstorm period, the water into the finished goods warehouse, resulting in equipment damage and fire and explosion.
2.3 Cable trench: During heavy rainfall, water may enter, resulting in short-circuiting of cables and tripping of equipment.
2.4 Outdoor terminal box, control box: easy to cause misuse, refusal or short circuit.
2.5 gas cabinet: heavy rain may cause protection error, furnace gas leakage.
2.6 Communication system interruption.
3, the basic principles of emergency response
3.1 In order to timely, effective and rapid treatment of flooding due to heavy rainfall, waterlogging and other accidents, major equipment accidents, reduce the damage caused by major economic losses and impacts, the establishment of the rapid rescue and emergency response mechanism in case of accidents, to protect the lives of employees and property safety, and to maintain the normal order of production and work, the preparation of this plan. Guoqing, Chen Hongqiang, Zhou Jiangming, Li, Chao, Li, Yu, Song Xiuhe, Zhang, Jian, Wang Yanqin, Li Zhongyu, Han Zhongsheng, Wang, Wei, Teng Yongyue, Huang Xiaoyan, Yang Jianping, Chai, Fu, Yang Deyong, Zhang Yaoxin, Li, Lei, Wang, Feng, Huang, Kui, Li, Mang, Zheng Ruilian, Zhu Aihua, Wang Yucheng, Xue Pengtao, Changxinrong, Han Xiangjun, Ren Jinhe, Zhaolong, Wang Jianxin, Ma Wulong, Yin Pengpeng, Jiao, Bin
3.3.2 The main responsibilities of the company's severe weather emergency leading group:
(1) Implement the higher level of emergency rescue and treatment of accidents related to the laws and regulations;
(2) Accept the leadership of the provincial company's emergency leading group, the company's emergency response request for local governments to provide emergency assistance;
(3) Unified leadership of the company's emergencies
(4) study major emergency decision-making and deployment;
(5) announce the company to enter and lift the state of early warning;
(6) announce the company to enter and lift the state of emergency;
(7) decide to implement and terminate the emergency response plan;
(8) release relevant information.
3.4 Emergency Response Office
3.4.1 The Emergency Response Leadership Group has set up an office attached to the Department of Safety Management, responsible for the daily work.
3.4.2 The main responsibilities of the office:
(1) implementation of the emergency leading group of the Ministry of the tasks;
(2) supervision of the implementation of the emergency leading group of the emergency directives;
(3) organization of the development of emergency plans, and supervise the implementation of the situation;
(4) grasp of the emergency handling situation, and report major problems in the process of emergency response in a timely manner to the leading group. Report major problems in the emergency response process.
3.5 Emergency Response Specialized Working Groups
3.5.1 The Emergency Response Office consists of the Alert Evacuation Guidance Team, Technical Advisory Team, On-site Rescue Team, Logistic Support Team, and Disaster Investigation and Post-Disaster Treatment Team. Responsible for the implementation of the instructions of the emergency leadership group, coordination and command of the professional
3.5.2 under the responsibility of the group:
3.5.2.1 alert evacuation guidance team: responsible for site security, traffic command, set up a cordon to prevent the site of unrelated personnel into the cordon area, guidance for the evacuation of the masses, the protection of materials, and so on.
3.5.2.2 Technical Advisory Group: responsible for research to determine the scene of the rescue, rescue programs, proposed emergency safety and technical measures, to provide technical support for on-site command work.
3.5.2.3 On-site rescue group: responsible for carrying out on-site rescue, rescue work, timely control of the source of danger, and actively take safety measures to prevent the expansion of the accident.
3.5.2.4 Logistical support team: responsible for transportation, to ensure the transportation of rescue personnel, materials and equipment required for the vehicle, to ensure the smooth flow of rescue roads; responsible for the provision of rescue equipment and materials; to provide the relevant emergency protective gear; responsible for life support, to provide a place to rest, food and other necessities of life, etc.
3.5.2.3 Site rescue team: Responsible for the scene rescue, rescue work, timely control of the source of danger, and actively take safety measures to prevent the expansion of the accident.
3.5.2.5 Disaster Investigation and Aftercare Team: Participate in the disaster investigation and aftercare team composed of the unit and its higher authorities and local government departments, and be responsible for providing the relevant raw materials, and do a good job in aftercare related matters.
4, prevention and early warning
4.1 Hazardous source monitoring
4.1.1 Establish and improve the enterprise to prevent abnormal thunderstorms disaster safety management rules and regulations, the development of emergency response plan, improve the system of responsibility for safety at all levels of production, and strengthen the accountability system.
4.1.2 Develop practical safety education and training programs, educate workers to continuously improve safety awareness, carry out safety education and safety production skills training, and effectively improve the ability of workers to self-protection and the ability to avoid accident risks.
4.1.3 Regularly organize annual emergency drills for abnormal thunderstorms and disasters, so that workers are familiar with the emergency work process, master the essentials of emergency work, and through the drills to find out the problems of emergency preparedness, and timely rectification.
4.1.4 Organize and carry out special inspections to prevent abnormal weather disasters, focusing on checking the preparation of each department to prevent abnormal weather disasters, the implementation of the emergency plan and responsibility system to prevent abnormal weather disasters, to prevent abnormal weather disasters and key monitoring parts, to prevent abnormal weather disasters, such as material reserves.
4.1.5 Strengthen the inspection of production site safety facilities, and further improve the site safety facilities and signs. Improve the labor operating environment, so that the production site has a strong ability to resist abnormal weather disasters.
4.1.6 Prepare special operation mode and anti-accident plan for preventing abnormal weather disaster, and organize study and drill.
4.1.7 Before the arrival of abnormal weather disaster season is responsible for the whole plant flood control and drainage equipment, submersible pumps, emergency lighting facilities and other emergency mechanical equipment, electrical equipment for a comprehensive maintenance.
4.1.8 in the lightning catastrophic weather climate must be checked before the occurrence of electrical, control equipment grounding and lightning safety measures.
4.2 Early Warning Actions
4.2.1 The company shall, according to its local stage and seasonal characteristics, combined with the environment, abnormal fog, rain and snow weather disaster forecast information, in accordance with the principle of early anticipation, early notification and early arrangement, carry out the analysis and assessment of the risks associated with abnormal weather disasters. After getting the following extreme weather alerts, start the warning.
4.2.1.1 Orange rainstorm warning signal: 3-hour rainfall will reach more than 50 millimeters, or has reached more than 50 millimeters and rainfall is likely to continue.
4.2.1.2 Fog Orange Warning Signal: Within 6 hours there may be visibility less than, 200 meters, `dense fog, or there has been a visibility of less than, 200 meters, greater than or equal to, 50 meters of dense fog and may continue.
4.2.1.3 Thunderstorm and gale yellow warning signal: within 6 hours may be affected by thunderstorm and gale, the average wind force can reach more than 8, or gusts of more than 9 and accompanied by strong lightning and thunder; or has been affected by thunderstorm and gale, the average wind force of 8-9, or gusts of 9-10 and accompanied by strong lightning and thunder, and may continue.
4.2.2 The warning order is issued by the safety inspection department, through the first person responsible for safety production to the department to which it belongs.
4.2.3 After entering the state of early warning, the relevant units in the warning area should take the following measures:
4.2.3.1 Check and confirm all kinds of protective equipment for emergency response, medical equipment, transportation gear, communication equipment, firefighting equipment, production and lighting of standby power equipment, testing equipment and devices, all kinds of emergency response materials, equipment, and so on, in accordance with the requirements of the respective emergency plan. Must be fully equipped.
4.2.3.2 Check and confirm the alarm method of various communication tools, contact and signaling regulations, and confirm that various rescue teams are familiar with the corresponding methods and steps to be taken after the occurrence of the incident.
4.2.3.3 Check to confirm that the evacuation channel, the gathering place is safe and reliable, transfer, evacuation or evacuation of people who may be affected by the hazardous area, and to be properly placed. Seal, isolate or limit the use of the place, suspend operations or activities that may lead to the expansion of the hazard.
4.2.3.4 Emergency leadership group to work, call the emergency work team, emergency rescue teams to enter the scene.
4.2.3.5 Make contact and coordination with grid dispatch.
5, information reporting procedures
5.1 Immediate report
5.1.1, after the occurrence of abnormal weather disaster events, the emergency response team should immediately report to the main person in charge of the unit. The report includes: the time of the disaster, the type of disaster, a brief history, the number of casualties, equipment and property damage, as well as on-site rescue required professionals and rescue equipment.
5.1.2 Instant telephone reporting procedures are as follows:
(1) The person in charge of the scene to the emergency team leader report.
(2) The company's safety department reports to the group company's safety production department.
5.2 Express report of abnormal thunderstorm weather disaster events
After the occurrence of abnormal weather disaster events, the affected unit should report the written express report of the weather disaster events to the group company in 30 minutes by telephone, micro-letter, etc. After completing the immediate report, the express report should include the following contents:
(1) The time and location of the occurrence of abnormal weather disaster events.
(2) A brief description of the unusual weather event, the number of casualties, the preliminary estimate of direct economic losses; the preliminary statistics of equipment damage; and whether it has an impact on society.
(3) abnormal weather disaster caused by the preliminary judgment of the cause of the accident.
(4) meteorological disaster events after the occurrence of emergency response, measures taken and accident control.
6. Emergency response
6.1 Response grading
According to the level of the accident, the plant's response to accidents due to unusual weather hazards grading is as follows: three-level response: due to unusual weather hazards resulting in general personal accidents, general equipment accidents, for the enterprise level of emergency response, the plant to organize the emergency response to the accident.
6.2 Response Procedures
The Safety Department of the company immediately notifies the relevant departments and emergency response teams to take precautions and issue early warnings upon receipt of abnormal weather disaster forecasts from the meteorological department. After receiving the immediate report of the accident, according to the instructions of the head of the emergency response team, immediately start this plan and notify the relevant personnel to quickly go to the scene to implement rescue.
Abnormal weather disaster emergency work in the company's abnormal weather disaster under the leadership of the leading group of emergency response, by the scene commander in chief to fully organize and direct the emergency response to the accident, according to the rescue needs to notify the professional team in a timely manner to rescue.
6.3 Disposal measures
When an abnormal thunderstorm weather disaster, the emergency team leader should immediately start the plan, the organization of the professional team to implement rescue and relief.
6.3.1 Cooling shed, finished product warehouse safety:
(1) before the rain will be finished warehouse in the calcium carbide empty, start raining calcium carbide crushing equipment all shutdown power outage, check the finished product warehouse fourth floor ventilation fan for the normal open state, the finished product warehouse fourth floor window for the tightly closed state.
(2) Before the rain in the cooling shed, the finished product warehouse entrance pile Lei sandbags (height 50cm and above), to prevent the rain does not enter the cooling shed, finished product warehouse.
(3) Before it rains, pull down the rain curtain at the entrance of the crushing line, and pile up sandbags (height 50cm and above) underneath.
(4) When it rains, the cooling shed, the finished product warehouse duty personnel uninterruptedly patrol the scene, in the cooling shed, the finished product warehouse at the entrance of the terrain of the low point must be arranged to guard; leakage points in a timely manner using the barrel to pick up, blocking, covering, etc., and report, make a good record of the; check the drainage facilities, to maintain smooth, abnormal conditions reported in a timely manner.
(5) If there is rainwater into the cooling shed, finished product warehouse, found that the personnel immediately start the "calcium carbide library fire accident special emergency plan. First of all, immediately report to the workshop leadership, cut off the water source material, you can use the nearest dry powder fire extinguishing equipment on the calcium carbide library to fight the initial fire; followed by a large number of dry sand, soil on the fire at the calcium carbide for burial, to control the expansion of the fire; when the source of the acetylene gas generation can not be eliminated, should not be put out the fire, only to control the fire on the surrounding facilities, equipment, and the hazards. The fire needs to be evacuated around the calcium carbide warehouse, especially the evacuation of calcium carbide warehouse downwind operating personnel;
6.3.2 high and low voltage room, UPS cabinet room and other major parts of the safety: during heavy rain, the plant water can not be discharged for a short period of time, the emergency response team immediately on the high and low voltage room, the main plant and the pump room, the air compressor room, etc., around the good rainwater back-up measures (heap Lei sandbags, dredge drainage), electrical facilities roof leaks ), the roof of the electrical facilities leakage, to take the plastic cover, serious situation, need to timely power outages.
When the cable ditch into the water, shall not be arbitrary treatment, prohibit people from entering the cable ditch. Need to be disposed of according to the following requirements:
(1) check the seepage (into the) water points, the use of sandbags or soil to seal, to prevent a large amount of water into the cable trench;
(2) a small amount of seepage of water (water level of 15cm or less), by a professional electrician wearing insulated boots, insulated gloves to check the cover of the cable trench, the measurement of the water level must be used insulated material items, and closely observe the cable trench Water level, a large amount of water (water level of 15cm or more), the timely use of submersible pumps will be discharged from the cable trench, the use of submersible pumps before the drainage, the electrician must check the cable trench is not a leakage of electricity, to confirm that the placement of submersible pumps at the cable line, if you can not meet the conditions, you must be disconnected from the power to use the submersible pump pumps to pump water.
(3) a large amount of water can not be controlled, the first power off in the drainage treatment, power supply must be carefully checked before the power test, in line with the requirements of the power supply before the power supply.
Outdoor equipment (terminal box, control box) into the water, can cause protection, automatic device error, refused to move, etc., can cause serious downtime, tripping. Electrical professionals should strengthen the inspection of outdoor equipment, do a good job to prevent electric shock safety measures, inspection of outdoor terminal box, control box cabinet door, check whether the rain leakage, and do a good job of rain measures. Outdoor terminal box, control box into the water, the post staff found, timely report to the workshop duty leader, contact the electrician to disconnect it, after disconnecting the electrician to check, drying treatment.
Regardless of the time, the plant staff found that the plant cable line has a fire, pull the arc and other anomalies, must be reported to deal with level by level.
6.3.3 Calcium carbide furnace purification system, furnace gas conveying system safety: thunderstorms caused by the calcium carbide furnace purification system and furnace gas conveying system emergency braking, interlocking failure, must be an emergency stop to deal with; resulting in CO leakage, immediately start the "CO Leakage Emergency Response Plan".
6.3.4 Thunderstorms cause water and power outages in the plant, you need to immediately start the "emergency plan for water and power outages in the plant".
6.3.5 Raw material workshop carbon materials, lime site related personnel to ensure that the drainage facilities are intact, to prevent the open carbon materials by the rain, so that the loss of coke or a large area of collapse; and beware of has been soaked in water lime burns.
6.3.6 During the rainstorm, each workshop and department should immediately draw out personnel to enter the production site, organize emergency rescue, to ensure normal operation, outdoor should be prohibited all except for critical treatment of all work, timely inspection of outdoor equipment, checking the status of water seepage in the building facilities, and timely arrangements for processing.
6.3.7 Electrical professionals should inspect all electrical equipment and high and low voltage room, transformer room equipment operation after heavy rain.
6.3.8 During thunderstorms, it is forbidden to wear wet clothes, wet shoes, and wet gloves for electrical work, and the personnel at the exit position must ensure that the long leather gloves and labor insurance shoes are dry when they shabu-shabu, so as to prevent the occurrence of electrocution accidents.
6.3.9 Interruption of communication system: When employees find that the communication system (telephone and network) is interrupted in the factory, they should use cell phones and walkie-talkies to report the abnormal situation step by step and contact the upper and lower posts to prevent accidents from occurring due to the interruption of communication and untimely communication.
The occurrence of monitoring video interruption, the central control room personnel immediately report, and contact the team leader to the scene to check the situation, the workshop to contact the Ministry of Intelligence to deal with, and arrange for a person to increase the number of post inspection.
7. Emergency supplies and equipment to protect: the reserve of emergency resources each workshop, departmental preparation composition. Reserve the following materials: woven bags, submersible pumps, water pipes, cables, rain shoes, raincoats, plastic sheeting, shovels, medicines, medical equipment, etc. and prepare emergency vehicles and emergency communications equipment.
Enterprise Hail and Thunderstorm Emergency Response Plan 2The arrival of summer, thunderstorms and gusty weather is more frequent, for gas stations this major hazardous operations, thunderstorms and gusty winds may cause fatal accidents, the consequences are very serious. Thunderstorm season gas station safety work to do:
First, strengthen the leadership, the implementation of responsibility
Strengthen the organization and leadership, the implementation of the responsibility at all levels. The station manager should stick to his post, seriously responsible for ensuring the safety of the gas station, at the same time to ensure that the organization in place, personnel in place, measures in place. Do come when called, come to be able to fight and win the battle.
Second, to carry out hidden danger investigation, make a good plan
Timely safety inspection, the problems that arise, take practical measures to quickly remove hidden dangers, and at the same time to strengthen the organization of flood control, lightning, anti-static, anti-wind plan drill, to do in the face of danger, to be able to remain calm, do not panic.
Three, strengthen the safety education, strict operating procedures
Strengthen the safety education, so that all employees fully realize the importance of work safety during the thunderstorm season. Do a good job of on-site safety management, to enter the station refueling vehicles should be strictly managed, refueling operations must be turned off refueling, as far as possible to do the car passengers get out of the car waiting outside the station, motorcycles, tractors must be launched out of the station to start.
Fourth, the operation of the guardianship in place, the effective monitoring of the surrounding environment
The gas station unloading operation to do unloading, the driver and other relevant personnel of the whole site monitoring. In case of strong thunderstorms and windy weather or dangerous operations nearby, the operation should be suspended. Inside the gas station, the use of non-explosion-proof communication equipment (such as cell phones) is prohibited, and vehicles and pedestrians unrelated to station business are prohibited from crossing the gas station. The company's goal is to provide the best possible service to its customers, and to provide them with the best possible service to their customers.
V. Do a good job of duty arrangements, timely communication of information
In order to ensure that the flood control, lightning, anti-static, wind information timely transmission, the implementation of 24-hour duty system, each round of duty are on duty management personnel on duty, requiring the duty personnel to adhere to their positions, do not leave the post without authorization. Do closely monitor the water, rain, disaster and weather conditions, once the disaster occurred, the first time to report.
;