(a) equipment manufacturing technology and product production technology, as well as for the introduction of technology imported for a single piece of equipment;
(b) complete sets of equipment (including production lines) and a single piece of key equipment;
(c) Sino-foreign joint venture, cooperation, or foreign-funded enterprises designed, manufactured or products designed and manufactured by foreign-funded enterprises, except for products returned for sale abroad. Article 3 The introduction of the feasibility study of the project, technical inspection abroad, negotiation and contracting, training abroad, the implementation and acceptance of the introduction of the project shall be carried out standardization work, and absorb the participation of personnel familiar with standardization business. Article 4 The technical supervision departments of the people's governments of the provinces and municipalities unified management of the standardization of the introduction of projects within the administrative region to review the work, is responsible for organizing and supervising the implementation of these measures.
The competent departments of the introduced projects, approval departments and foreign trade, banks and other relevant business undertakings shall, in accordance with their respective responsibilities and powers, do a good job of standardization review of the introduced projects. Chapter II Preliminary Standardization Work Article 5 The sponsoring unit of the introduced project (hereinafter referred to as the introducing unit), when conducting the feasibility study of the introduced project, shall organize technical personnel familiar with the standardization business to carry out the following standardization research work:
(1) Comparative analysis of the standards and other technical data of the countries and enterprises (companies) related to the introduced project;
(2) (ii) studying in detail the differences between the standards of the project to be introduced and those of China and proposing solutions;
(iii) determining the standardization work plan for the negotiation and contracting phases of the project to be introduced. Article 6 After carrying out the standardization research work, the introducing unit shall fill in the Standardized Review Report on the Introduction of Technology and Imported Equipment in Heilongjiang Province, which shall be submitted to the relevant departments for review as an annex to the feasibility study report. Article 7 The personnel who go abroad for technical investigation shall be responsible for collecting, studying and digesting the relevant standardized information. The standardization work shall be included in the study report. Article 8 The introducing unit shall, before negotiating and signing the contract of the introduced project, determine the standardization requirements to be put forward to the supplier according to the standardization work plan, including the standard information required to be provided by the supplier and the standard information to be sought from the supplier, and report them to the approving department of the introduced project and the technical supervision department at the same level for the record. Article 9 The introduction of the unit shall require the supplier to provide its current enterprise (company) standards, as well as in its standards cited in our inability to collect the relevant standard information, of which:
(a) the introduction of equipment manufacturing technology and product production technology, the supplier must provide its technical standards, drawing design and manufacturing process standards, quality control standards, test methods and acceptance standards, receiving and Parts, components, raw materials standards, etc.;
(2) for imported equipment, the supplier must provide its technical standards, the main technical indicators of the products produced by the equipment, installation and commissioning standards, operation and maintenance standards, manufacturing drawings of wearing parts and standards, fire safety standards for flammable and explosive equipment, equipment, test methods and acceptance of standards, as well as labor safety, health, environmental protection standards.
The introduction unit shall also, under the principle of not increasing the project cost as far as possible, strive for the supplying party to provide its technical management standards, as well as the national standards of the supplying party and the standards issued by other organizations of the country which are relevant to the introduction project. Chapter III Standardized Review Article 10 The main principles of the standardized review of the introduced projects:
(1) conforming to the direction of development of China and local product varieties;
(2) conducive to accelerating the adoption of international advanced standards by the province, and improving and perfecting the standard system of China;
(3) conducive to improving the technological equipment capacity and product quality of the province, and conducive to the (c) It is conducive to improving the technical and equipment capacity and product quality level of the province, and to fully utilizing the resources and saving energy in the province. Article 11 The main bases and requirements for standardization review of the introduced projects:
(1) International standards, advanced foreign standards, domestic standards recognized by national laws, as well as China's relevant policies and laws and regulations are the main bases for standardization review;
(2) The units of measurement used in the standards of various types of the introduced projects shall be in accordance with China's legal units of measurement, and the special circumstances shall be reported to the provincial technical supervision department for approval;
(3) It is beneficial to improving the technical equipment capacity and product quality level of the province, and to making full use of the resources and energy conservation in the province. (c) the voltage, current, industrial frequency levels, instruments, meters and computers, such as input and output interfaces, must comply with China's relevant standards and regulations;
(d) all kinds of structural and architectural limits, environmental conditions, and safety, health, environmental protection and other requirements must be in line with China's relevant standards and regulations. Article 12 When the competent department in charge of the introduction project organizes the relevant parties to carry out the feasibility study demonstration of the introduction project, it shall notify the technical supervision department to participate in the examination on the contents listed in Articles 5 and 6.
The department in charge of the introduction project and the technical supervision department shall, within fifteen days after the examination of the feasibility study report, sign the examination and validation opinions on the "Standardized Examination Report on the Introduction of Technology and Imported Equipment in Heilongjiang Province" respectively. Article 13 The introduction of the unit has not been reported by the technical supervision departments to validate the "standardized review report on the introduction of technology and imported equipment in Heilongjiang Province," the approval department shall not approve the feasibility study report.