1. General provisions 1.1 The project manager shall seriously improve the construction site management, civilized construction, safe and orderly, clean and hygienic, not disturbing the people, not to the detriment of the public interest.1.2 The site shall be set up in the head of the door of the contractor's logo. The Project Manager Department of the Contractor shall be responsible for the overall planning and deployment of the civilized image management of the construction site; each subcontractor shall, under the guidance and coordination of the Project Manager Department of the Contractor and in accordance with the principle of subdividing into zones and blocks, improve the planning of civilized image management of the subcontractor's construction site in the city and strictly implement it, and incorporate it into the Contractor's on-site management scope to accept the supervision, management and coordination.1.3 The Project Manager Department shall announce the following signs in a conspicuous position at the entrance of the site 1.3 The project manager department shall display the following contents in the conspicuous position at the entrance of the site: 1) project profile board, including: project scale, nature, use, name of contractor, designer, contractor and supervisory unit, construction start and end year and month, etc. 2) safety discipline board. 3) fire prevention notice board. 4) safety without major accidents timing board. 5) safety production, civilized construction board. 6) construction general layout plan. 7) organizational structure of the project manager department and the list of main management personnel diagram. 1.4 project manager should be listed in the construction site management of the regular inspection and inspection of the content, and with the daily management of the organic combination, listen carefully to the neighboring units, the public's views and reflections, and timely rectification. 2 standardize the site 2.1 construction site site standardization should be built on the basis of scientific rationalization of the design of the construction floor plan and standardization of the management of the material and apparatus positioning. The contractor should establish and improve the construction plan management and on-site material and apparatus management standard according to the management level of the enterprise, and provide the project manager with the basis of site management planning.2.2 The project manager must combine the construction conditions, according to the requirements of the construction program and the construction progress plan, and carefully carry out the planning, design, layout, use and management of the construction plan.1) The construction plan should be according to the specified construction The scope of the site and the content of the layout are arranged and managed separately. 2) The construction plan of the unit project is suitable to be designed as a stage construction plan according to the needs of different construction phases and be implemented after confirming through the construction coordination meeting before the implementation of the stage progress target begins. 2.3 The project management department shall strictly follow the position delineated in the approved construction general plan or the relevant construction plan of the unit project to 2.3 The project manager shall, in strict accordance with the approved construction general plan or the relevant unit project construction plan, set up the main mechanical equipment of the construction project, scaffolding, sealed safety nets and barriers, molds, construction temporary roads, water supply, electricity supply, gas supply pipelines or lines, construction material product yards and warehouses, earth and construction waste, power substation and distribution rooms, fire hydrants, guard rooms, on-site office, production and living temporary facilities, etc. 2.4 In addition to the designated location of construction materials and equipment according to the construction plan, the construction materials and equipment shall be set up in place. According to the different characteristics and nature, the arrangement should be standardized and requirements, and the implementation of the yard neatly, limit width and height, shelves into the box, specifications, classification, hanging signs and other management standards. 2.5 In the construction site should be set up around the perimeter of the temporary enclosure facilities. There should be obvious signs and fencing facilities near the dangerous goods warehouse. 2.6 A smooth drainage ditch system should be set up at the construction site, and the site should not be waterlogged or mudlogged, and the roads should be kept dry and solid. The ground of the site shall be hardened.3 Environmental Protection3.1 The Project Manager Department shall establish the project environmental monitoring system according to the "Environmental Management Series Standard" (GB/T24000 a ISO14000), continuously feedback monitoring information and take corrective measures.3.2 The mud and sewage of the construction site shall not be directly discharged into the urban drainage facilities and rivers, lakes and ponds without treatment.3.3 Except for the devices in compliance with the regulations, it is not allowed to melt asphalt and burn linoleum and paint at the construction site, nor burn other wastes that can produce toxic and harmful smoke and foul odor, and it is prohibited to use toxic and harmful wastes as earth backfill.3.4 Construction garbage and sludge shall be piled up at designated places and cleaned up daily. The garbage and waste of overhead construction shall be cleaned and carried by closed stringers or other measures. Vehicles loaded with construction materials, garbage or slag, should take effective measures to prevent dust, spillage or overflow. The construction site shall set up motor vehicle washing facilities as needed, and the washing sewage shall be treated.3.5 Before carrying out blasting, piling and other construction operations in the densely populated areas of the residents and units, the Project Management Department shall apply for approval according to the regulations, and shall also notify and explain to the residents and units in the affected areas of the operation plan, scope of influence, extent and relevant measures to obtain collaboration and cooperation; for the construction machinery noise and 3.6 Underground pipelines passing through the construction site shall be notified to the contractor by the contractor before the construction, and the location shall be marked and protected. When cultural relics, monuments, explosives, cables, etc. are found during the construction, the construction shall be stopped, the site shall be protected, the site shall be reported to the relevant departments in a timely manner, and the construction shall not be continued until it is dealt with in accordance with the relevant regulations. 3.7 When water, electricity and road closure is required during the construction and affects the environment, it shall be approved by the relevant departments and notice shall be given in advance. Construction in the place where pedestrians and vehicles pass should set up ditch, well, can, hole cover and sign.3.8 It is desirable to arrange greening for the construction site in the warm season.4 Fire prevention and security 4.1 The site should set up the gatekeeper, and set up the guards according to the need to be in charge of the defense work of the construction site, and take the necessary anti-theft measures. The main management personnel of the construction site should wear the card proving their identity at the construction site, and other on-site construction personnel should be labeled. Magnetic card management can be used for the personnel entering and leaving the site when there are conditions.4.2 The Contractor must establish and implement the fire prevention management system in strict accordance with the provisions of the Fire Protection Law of the People's Republic of China*** and the State of China. The site must have roads that meet the requirements for fire trucks to exit and travel, and set up fire alarm systems and fixed fire extinguishing systems that meet the requirements, and the fire fighting facilities should be kept in perfect standby condition. When constructing or storing or using flammable or explosive equipment in fire-prone areas, . Contractor shall take special fire safety measures. Smoking is strictly prohibited on site, and a smoking room can be set up if necessary.4.3 The passageways, fire exit points, and emergency evacuation hallways of the construction site shall be clearly marked or signposted. 4.4 If blasting operation is required in construction, it must be examined and approved by the competent government department, and provide the name, quantity, use, blasting location, distance between the four neighbors of the blasting equipment and safety operation regulations, apply for "blasting articles use license" to the Public Security Bureau of the county and city (district) where it is located, and then the professional team with the qualification of blasting will carry out the construction in accordance with the relevant regulations. 5 health and epidemic prevention and other matters 5.1 construction site should not be set up staff dormitory, must be set up as far as possible and the construction site should be separated. In the office in a prominent position should be posted in the emergency vehicle and the hospital telephone number. According to the need to take measures to prevent heat stroke and disinfection, anti-virus. The construction operation area and office area shall be divided into clear zones.5.2 The contractor shall specify the insured person and insurance scope of construction insurance and third party liability insurance.5.3 The project manager department shall carry out appraisal of site management, and the appraisal method shall be formulated by the enterprise in accordance with the relevant regulations.5.4 The project manager department shall carry out on-site energy-saving management. Conditional site should be issued energy use targets.5.5 The canteen and toilet on site should meet the hygiene requirements, and drinking water facilities should be set up on site.
For more information about engineering/service/procurement bid writing and production, to improve the winning rate, you can click on the bottom of the official website customer service free consultation:/#/?source=bdzd