Conference room water and power outage emergency plan (generic 6)
In daily study, work and life, sometimes some unexpected accidents, in order to avoid things worse, usually need to prepare a good emergency plan in advance. Then should be how to prepare an emergency plan? The following is my collection of conference room water and power outage emergency plan sample (general 6), welcome to share.
Conference room water and power outage emergency plan 1
A sudden water outage emergency treatment
1 on-duty engineering staff received a notice of water outage from the owner or merchant, they must immediately rushed to the scene of the outage, a detailed understanding of the scope of the outage and the related outage situation.
2 on-duty engineering staff immediately went to the main gate of the suspended lot to check the valve, if the valve is closed, timely understanding of the reasons for valve closure, to confirm that can be opened, open the valve to restore water supply.
3 If the total valve of the lot is not closed, timely contact with the water company to understand the specific reasons for the water outage.
4 If the water supply is caused by the domestic pumping equipment, the following treatment:
(1) If the valve is closed to cause water supply, immediately understand the reasons for the valve closure, and take effective measures to restore water supply in a timely manner.
(2) If the water pump shutdown caused by water, immediately find the cause of the shutdown, and take effective measures to repair or replace parts, and timely restoration of water supply.
(3) such as municipal pipe network caused by water outages, immediately check whether the municipal pipeline inlet valve failure or contact the water company to understand the cause of water outages, the resumption of water supply time. The service center should cooperate with the owner to do a good job of explaining the relevant work in a timely manner.
Two, sudden power outage emergency treatment
1, high-voltage ring cabinet sudden power outage
(1) engineering duty personnel should contact the high-voltage lines of the power supply department in a timely manner, in order to ascertain the cause of the failure before any operation is strictly prohibited.
(2) If the point of failure is not in the jurisdiction, it is estimated that the troubleshooting time is long, the high-voltage operators of the power supply department can be transferred to another high-voltage power line (if any), and the prohibited switch hanging "no closing" signage.
(3) After the fault is removed, the power supply department operator to restore the original power supply line.
2, distribution room circuit breaker tripping blackout
(1) engineering duty personnel received a blackout notice, immediately rushed to the blackout site, the circuit breaker will be under the branch load switch disconnect, the circuit breaker tripped hanging "line maintenance, forbidden to close" signage.
(2) With a shaking table to detect the branch line.
3) After the fault line is identified, close the other lines to restore power.
4) Hanging "line maintenance, forbidden to close the gate" signboard on the switch of the problematic branch, further maintenance of the line, troubleshooting, restoration of power supply.
3, the owner of the room tripped
1) duty engineering staff received a blackout notice, immediately rushed to the scene of the blackout, inspection and maintenance, should understand the owner of the meter tripped before the use of other electrical appliances, in order to quickly find the point of failure.
2) If the fault is the household main switch, immediately turn off the main switch and other sub-circuit air switch, and then open the main switch.
3) If the main switch does not jump, and then send the sub-switch, such as a sub-switch can not be sent on, that is, the line for segmentation testing, until the troubleshooting, restore power.
conference room water and power outage emergency plan 2Foreknowledge of power outages:
1. In the event of a power outage notice, the service center should be in advance of the outage line, area, time, elevator use, and safety precautionary requirements, etc., the use of community radio to notify each household and commercial tenants, and in the main entrances and exits to publish a notice of the outage;
Unpredicted power outage:
1. In the absence of any notice, the sudden occurrence of power outages, the Ministry of Engineering should immediately confirm that the internal failure of the power outage or external power outage. If the internal failure of the blackout, should be immediately sent to find the cause to take measures to prevent the expansion of the fault; if the external blackout, on the one hand, to prevent a sudden call to cause accidents, on the one hand, call the power bureau to inquire about the blackout, to understand when to resume power supply, and the understanding of the situation will be notified to the Ministry of Management.
2. The Order Maintenance Department, together with the Engineering Department, immediately sent people to each building to check the operation of the elevator, and found that the elevator was trapped immediately in accordance with the emergency plan for elevator traps.
3. The Management Department will immediately understand the power outage situation, telephone notification of the important commercial tenants in the district, such as the use of standby generators, you can use the community radio notification. If the power outage time is longer, you need to publish the power outage notice at the main entrance.
5. If a sudden power outage, when the mall is open at night, the security department should help the mall to maintain order, and guide the merchants to enable emergency lighting, candles and other back-up lighting, evacuate customers, and pay attention to fire prevention to prevent fires, and assist the mall management to do a good job of safety precautions.
6. If necessary, arrange for staff to the main entrances and exits of the district, elevator hall to maintain order, the Department of Order Maintenance should strengthen the security measures, to prevent people from creating chaos, fish in troubled waters, and if necessary, close the door.
7. Assign people to guard the office, duty room, patiently receive residents and merchants inquiries, do a good job of explaining and guiding the work, to prevent conflict with the residents and merchants.
8. The engineering department recorded in detail the beginning and end of the power failure, the cause of the incident, the response and the damage caused.
9. Preventive measures for sudden power outages:
1) The engineering department should always check the emergency lighting and emergency broadcasting system to ensure normal.
2)The management department should remind the office building tenants and commercial tenants to prepare some emergency lighting or candles in case of power failure.
3) Order Maintenance Department, Engineering Department in addition to the configuration of patrol, maintenance of the torch, should also be configured with portable emergency lighting, and when charging maintenance, to keep intact.
10, if the power outage time is too long, when necessary, consult the management of the relevant leadership, whether to open the backup power supply system.
11, in the confirmation of the duration of the power outage, to notify the residents and commercial tenants, pay attention to water storage, to avoid paralysis due to the secondary water supply system can not lead to normal water supply.
12, in the event of abnormal out-of-system power outages, power supply, you need to stop all the elevators in the district in addition to the office building to prevent the elevator shutdown, and arrange for staff to stay in the running elevator until the power supply is normal.
Pre-knowledge of water cuts:
1, the service center in the water supply company received a notice of water cuts, should be immediately before the community radio and in the various buildings on the bulletin boards posted water cuts.
2, the content of the water notice must include: cause the cause of water supply suspension, water supply is expected to stop, water supply time, to remind households, stores to do a good job of water storage, pay attention to close the indoor faucet or valve.
3, such as living in the community cisterns, and the use of the second pressurized system, can be flexible to use timed water supply.
Unpredicted water outage:
After receiving the household consultation call or found that the water outage, immediately arrange for the engineering staff to check the cause, is a failure of the equipment or water intake pipe, such as equipment failure should be immediately identify the cause of the reason for the exclusion of the cause of the immediate treatment, the need for a long time to repair, immediately notify the service center, posting notice, and broadcasting in the neighborhood. For the water supply pipe no water problem, should immediately contact the water supply company, understand the situation, and community broadcasting, such as water outage time is longer, the need to post a notice of water outage.
Conference room water and power outage emergency plan 3
A power outage
(a) Logistics Management Office received the relevant departments of the power outage, water outage notice, to ask the power outage, water outage time;
(b) Logistics Management Office should be timely notification to the cafeteria, the person in charge of the stalls;
(c) Logistics Management Office to the leadership of the timely report.
Second, power generation
Logistics electrician immediately use the generator to generate electricity, to protect the normal use of electricity in the cafeteria.
Third, the posting of warm chime tips, the water and power outages to inform teachers and students, to remind teachers and students to bring good change to eat.
four, cafeteria meal processing.
If there is a planned power and water outage:
(a) Breakfast power and water outage:
(1) the night before using containers to prepare water, make good buns, and then the next morning with a diesel cooker steaming hot;
(2) as far as possible to provide fried noodles, fried rice, boiled noodles, thin rice;
(3) to provide eggs, milk.
(2) Midday and dinner blackout:
(1) rice: cook the rice in advance;
(2) dishes: according to the generator power generation time, arrange for stir-frying; use the coal steam stove or briquette stove to stir-fry dishes.
If there is a sudden blackout:
(1) Breakfast blackout:
(1) Buns by hand, use diesel cooker for steaming;
(2) Provide fried noodle, fried rice, boiled noodle, and diluted rice as far as possible;
(3) Provide eggs and milk.
(2) middle and dinner blackout:
(1) rice: to be promptly arranged after the generator power steaming;
(2) dishes: to be promptly arranged after the generator power stir-frying or the use of coal steam stove, briquette stove stir-fry dishes.
V. Meal sales. Teachers and students can buy meals in cash.
conference room water and power outage emergency plan 4In order to effectively safeguard the safety of the whole school teachers and students, effective emergency treatment of the whole school may occur sudden power outage phenomenon, to prevent accidents due to water and power outages, according to the spirit of the competent authorities of the higher authorities of the relevant documents, by the school study decided to develop a water and power outage emergency plan.
Safety Leadership Group
Leader:
Deputy Leader:
Members: class teachers and logistics personnel.
First, the main responsibilities:
timely understanding of the information about the water and power outages, grasp the school to prevent sudden water and power outages, equipment configuration, and according to the school's actual preventive countermeasures and measures to strengthen the school teachers and students safety education, improve the teachers and students awareness and ability to protect.
Second, the work measures:
1. Strengthen the school safety education and publicity work, make full use of the bulletin boards, blackboards, campus broadcasting and other publicity positions, through the theme of the classroom meeting, the radio station, and other forms of teachers and students throughout the school to stop the water, power outages occur in the accident of the preventive knowledge publicity and education and training, once the phenomenon of stopping the water, power outage Students do not panic.
2. Strengthen the prevention of water and power outages facilities overhaul and installation, the school according to the actual situation of the investment, the installation of some related to the prevention of sudden water and power outages equipment, such as: in the dormitory building, the teaching building staircase should have an emergency light, the safety exit signs to ensure that the staircase is smooth and guardrail firm, water and power outages occur when the classroom teacher, the teachers of the classroom to organize the safety of the evacuation of the students.
Third, the report and response:
1. Prior notice of the water, power outages, in contact with the offices of the premise of explaining the situation, notify all teachers and students to do a good job of water, power outages before the preparation.
2. Not received prior notice of the temporary water and power outages:
(1) administrative staff on duty should immediately report the situation to the water and power outage security leading group, the leading group divided into arrangements for the work.
(2) members of the leading group should immediately notify the important functions by phone, such as: notify the cafeteria to arrange for meals and temporary lighting appliances, notify the Education Department to arrange for classroom teachers and teachers in the aisles of each building, stairs to maintain order.
(3) The General Affairs Office is responsible for organizing water and electricity maintenance personnel to identify the causes of water and electricity outages and timely contact and coordination with the local water and electricity departments, as soon as possible to remove the fault.
3. Evening self-study during the water, power outages:
(1) The school staff on duty should promptly notify the duty electrician and maintenance personnel by phone.
(2) after the occurrence of water and power outages, teachers on duty should immediately go to the designated floor to organize students into the classroom to maintain order, organized and planned evacuation.
Conference room water and power outage emergency plan 5
Medical safety is the center and focus of the hospital's medical work, water, electricity and other support systems to ensure medical safety is a key link, in order to ensure medical safety, to deal with emergencies, according to the Municipal Bureau of Health, "Year of Safety Production" activities, combined with the actual situation of the hospital, this plan has been formulated. The program has been designed to meet the requirements of the city's health bureau.
1, organizational leadership
(1) in order to strengthen the power outage, water outage emergency emergency response leadership, the establishment of the hospital power outage, water outage and other emergencies, emergency response leadership group, to determine the management of logistics dean for the commander-in-chief, responsible for the power outage, water outage emergency overall command work. The commander-in-chief in the power outage, water outage occurs when not in the hospital, the commander-in-chief by the deputy commander.
(2) the general duty for the power outage, water outage deputy commander, under the leadership of the commander-in-chief is responsible for the scene of the specific rescue work; the departments responsible for the scene command.
(3) the general director, deputy director and site commanders should be in the first time after receiving the power outage, water outage to the scene.
2, power outages, water outages and other emergencies to prevent
(1) equipped with dual-channel power supply: if one of the sudden power outages, immediately activate the other.
(2) Key section equipment equipped with UPS, in case of sudden power failure caused by equipment failure or loss of documents.
3) Ward floors are equipped with emergency lights in case of power outage to ensure the safety of the pedestrian channel after a sudden power failure.
(4) Self-provided generator sets, operating rooms, MICU, NICU, emergency room and other key departments dedicated line delivery to ensure power supply.
3, power outages, water outages, gas outages and other emergencies in the reporting process
(1) the occurrence of power outages, water outages, the relevant personnel immediately report to the plumber on duty. The electrician and plumber on duty should immediately rush to the scene to deal with the situation after receiving the report. In the event of a power or water outage that may last more than five minutes or more, the person on duty should immediately report to the deputy commander.
(2) Upon receipt of the report, the deputy commanding officer shall immediately rush to the relevant location to assist in the process. For power and water outages that are likely to last more than 15 minutes, report to the commander-in-chief.
(3) In the event of power and water outages in key departments such as the emergency department, ward, operating room, laboratory, radiology, functional department, computer center, etc., the officer on duty shall immediately report to the department director. The chief of the department should immediately rush to the department after receiving the report to prevent accidents of critically ill patients. In case of critical patients are being rescued, they should immediately report to the medical department or deputy commanders, the medical department, after receiving the report, should immediately rushed to the scene, organize the whole hospital forces to rescue, and at the same time to the commander-in-chief report.
(4) deputy commanders, after receiving the report, should be timely understanding of the situation, to study the treatment of the malignant power and water outages to the commander-in-chief.
4, power outage, water outage, gas outage treatment
(1) basic management
1 the main section should be assembled with emergency lights, the key section should be assembled with water storage.
2 The person in charge of each section should regularly check the electric circuit and water circuit, and investigate potential safety hazards. Found problems, timely report to the deputy commander, timely repair. To regularly check each section rescue equipment, such as cardiac monitors, electrocardiographs, defibrillators and other equipment in the already charged state.
3 Infrastructure Office should regularly organize electricians and plumbers to overhaul and maintain the circuits, waterways and airways of the whole hospital.
4 In the event of power outages, water outages and other emergencies, the departments should report in a timely manner in accordance with the procedures and actively deal with.
(2) Implementation of responsibilities
1 medical staff
After the occurrence of power outages, water outages and other emergencies. Should immediately report to the duty electrician, plumber, if there are critical patients in the ward should also immediately report to the department director and the general duty. Do a good job of explaining the patients and their families to eliminate the panic of the patients.
2 clinical departments
Clinical department heads should immediately rush to the department upon receipt of the report to strengthen the monitoring of critically ill patients. If you encounter a critical patient resuscitation, you should immediately report to the medical department.
Sudden power failure during surgery, medical staff should immediately report to the head of the department, the head of the department should immediately rushed to the scene to organize the processing, and report to the Medical Section. The use of emergency lighting, proper disposal, waiting for an incoming call, emergency surgery, if necessary, ask the deputy director of the transfer of hospital treatment.
3 medical and technical departments
In the event of a power outage, emergency biochemical, routine testing projects by the Laboratory Department to send a special person will be sent to other hospitals to check the specimens. Emergency radiology, ultrasound and other imaging tests by the department of patients will be transferred to other hospitals for examination. The medical technology departments in the premise of ensuring medical safety, should protect the safety of equipment, according to operating procedures in a timely manner to do a good job of protecting the equipment.
4 Infrastructure Office
A, regular organization of electricians, plumbers, business training to improve emergency response capabilities.
B, in the hospital's various wards of the rescue room, medical area of the stairs, channel assembly emergency lights and fire hydrants.
C. Regularly organize safety inspections of electricity and waterways, investigate potential safety hazards, and find timely maintenance.
D, in the event of a power outage, water outage report, to organize personnel to the scene, and immediately carry out maintenance and processing. For the possibility of power outage, water outage more than 15 minutes or more, to report to the deputy commander. When the water stops, you should immediately turn off the faucet of the non-focused parts, notify the key sections to strictly control the use of water, and according to the situation, actively organize manpower and material resources to nearby water sources that meet the edible standard to get water.
E, power outages, water outages and other emergencies leading group, organization and leadership of the hospital power outages, water outages and other emergencies, coordination with sister hospitals, power supply, water supply and other departments of the relationship, to determine the occurrence of power outages, water outages and other emergencies of the principles of treatment and procedures, if necessary, to the higher authorities and the government to request a report.
5, the occurrence of power outages, water outages, gas outages and other emergencies 'accountability and reward.
(1) the hospital emergency response leading group of the hospital occurred serious power outages, water outages and other emergencies to investigate the occurrence of power outages, water outages and other emergencies in the occurrence of ineffective handling of the responsible person, based on the degree of responsibility in accordance with the relevant provisions of the relevant provisions of the higher level and the "hospital assessment rules" and other relevant provisions of the corresponding penalties.
(2) on the timely detection and take positive measures to avoid or mitigate the consequences of damage due to power outages, water outages and other emergencies to reward the personnel.
Conference room water and power outage emergency plan6
First, the deputy commander-in-chief emergency rescue composition and responsibilities
〈A〉Leadership organization
Commander-in-chief: day shift; night shift: duty cadres
Deputy commander-in-chief:
Members:
1, Chief Commander: responsible for organizing and commanding the emergency rescue of the whole plant;
2. Deputy Chief Commander: responsible for assisting the Chief Commander to do a good job in the specific command of the emergency rescue;
3. Group members: work under the unified command of the Command Department, the section chiefs of the duties in the emergency rescue of the accident are:
1. Steelmaking foreman: responsible for the steelmaking section on-site command work;
3. Continuous casting foreman: responsible for continuous casting section on-site command work;
4. Mechanical repair foreman: to assist the commander-in-chief is responsible for the rescue and repair work on-site command;
5. Electrical repair foreman: to assist the commander-in-chief is responsible for the rescue and repair work on-site command;
6 peripheral foreman: to assist the commander-in-chief is responsible for the rescue and repair work on-site command;
7. Engineer Engineer: responsible for rescue and repair site technical guidance;
Second, emergency communications:
In dealing with the accident, all involved in the rescue and repair personnel need to keep communications open, if found that the signal is unstable or in the middle of the break, you should immediately use the plant fixed telephone or cell phone in a timely manner with the commander in chief to get in touch with the location of the clear description.
Third, the accident handling plan:
1, when a power failure occurs, the pump room controller should not panic, to calm down, the South Safety Tower can provide about 15 minutes of water, during this period of time, the controller can be completely power supply to restart the pumps;
2, the North District, under normal circumstances, the diesel engine can automatically start after the power failure. Under normal circumstances, the diesel engine can start automatically after a power failure, the pump room master control worker just go to the control box operating panel to press the button combined with the clutch, and then press and hold the speed button until the speed displayed on the speed meter can not rise again;
3, if the diesel engine does not start automatically, you can first press the reset button. If not, the transfer switch to play in the manual position, then as long as the finger press the start button, the diesel engine can start
4, when the success of the diesel pump start, the pump room controller should immediately report the situation to the shift scheduler, and notify the converter control room and continuous casting main control room.
5, converter main control room received the alarm call from the pump room, should immediately lift the gun to stop smelting, and immediately notify the situation to the shift scheduling, by the shift scheduler to the higher level to report.
6, continuous casting main control room received the pump room alarm call, should pay close attention to the second cold water, in the case of conditions allow as much as possible in the pouring ladle steel pull finish.
7, the pump room master control worker in the diesel engine startup is completed, can be appropriate to adjust the entrance to the manual valve to increase or decrease the water pressure, in order to achieve the safety of the equipment required to use water.
Fourth, preventive measures and assessment
1, the pump room controller in the usual work to closely monitor the height of the water level of the safety water tower, if there is an abnormal situation to immediately report to the head of the shift scheduler, to facilitate the timely processing in order to eliminate the potential for trouble;
2, the safety of water towers, the manual valve of the water outlet pipe at any time to observe, in order to prevent Someone mistakenly move;
3, each shift personnel to inspect the diesel engine operating box panel of the various switches, indicators of the situation. Such as: selector switch to play in the automatic position; power supply key switch to open; float charging indicator light is bright, whether the alarm light is bright, such as bright should be reset in time.
;