The project construction epidemic prevention work summary

Engineering construction epidemic prevention work summary (Selected 5)

Busy and full of work has come to an end, review the past work, doubly full of harvest, need to seriously write a work summary for this. Then how to write it? The following is my compilation of engineering construction epidemic prevention work summary (selected 5), I hope to be able to help you.

Engineering construction epidemic prevention work summary 1

First, strengthen the construction personnel source control

The project each participating unit should be in accordance with the Municipal Bureau of Housing and Urban Development issued the "new coronavirus infected pneumonia epidemic prevention Ⅰ emergency response period of the city's construction engineering construction personnel management work of the emergency notice" requirements.

Two, strengthen the daily supervision and management

First, the construction site to implement closed management. All construction sites only a dedicated channel, the guards on duty 24 hours a day; strict management of personnel in and out of the establishment of construction workers real-name registration ledger, the project site required distribution of materials, supplies and other foreign vehicles into the field, the car personnel shall not be out of the cab, the goods, materials, arrangements for the reception of the special person and loading and unloading. Secondly, each participating unit of the project should carry out epidemic prevention and control training for construction workers. Through the site hanging publicity pictures, warning slogans, microblogging and other forms, so that each employee understands the prevention and treatment of "new coronavirus infected pneumonia" protective measures to improve the awareness and ability to protect. Thirdly, a system for checking the physical condition of construction workers at project sites has been established. All construction sites must be equipped with professional temperature testing equipment, daily inspection should not be less than 2 times, employees must be qualified by the temperature test and wear the appropriate mask before entering the site, the test results to establish a ledger, registered one by one, retained for inspection. Where found body temperature ≥ 37.3 ℃, coughing and other suspected symptoms or with the infected area, suspected patient contact history, the construction site must immediately stop work, timely report to the project location construction authorities and health epidemic prevention departments, and actively cooperate with health epidemic prevention and other relevant departments to take isolation measures. Fourth, strict epidemic information reporting. In the epidemic Ⅰ response period, the construction units should strictly implement the new coronavirus infection of pneumonia cases "daily report" and "zero report" system, in accordance with the principle of territorial management, every day will be resumed across the year project off the new coronavirus infection of pneumonia precautions The first thing you need to do is to check the situation and report it to the local construction administrative department and its safety supervisory body.

Three, to strengthen the construction site environmental health and disinfection and epidemic prevention work

First, the living area, office, canteen, toilets and bathrooms, and other public **** places often ventilated, disinfection shall not be less than 2 times a day, disinfection records are registered one by one, archived for verification, and do a good job of living garbage disposal work. Second, the site cafeteria should pay attention to the safety of food materials, daily to implement the morning inspection and personal hygiene system, the staff must wear work clothes, wear disposable gloves, wear protective masks. Cafeteria raw materials and supplies to be purchased through legal channels, meat purchasing points should have health certificates issued by the relevant departments, daily records of the procurement channels of food ingredients, to eliminate the supply of raw food and wild varieties of food. During the epidemic Ⅰ response period, we should adopt segmented meals to avoid the gathering of people, disinfect the tables and chairs after use, and sterilize the tableware at high temperature. Third, to improve the living conditions of employees, the dormitory must have ventilation, disinfection and other necessary measures to urge practitioners to diligently sunshine clothes and bedding. Fourth, the project site should be prepared sufficient thermometer, disposable surgical masks or N95 masks, protective clothing, disinfectant alcohol, 84 disinfectant, disinfection equipment, emergency preparedness of drugs and other protective materials; to clearly delineate a special area of the room as a temporary isolation room; to ensure that the personal protection, environmental disinfection and response to emergencies in place in a timely manner. The various materials to establish a ledger, a clear location, strengthen the maintenance, to ensure that at any time in the normal state of availability.

Fourth, a clear division of responsibility

City Public Utilities Service Center is responsible for the city's municipal, landscaping and greening resumption (open) of the project's prevention and control of the new coronavirus pneumonia outbreak, directly responsible for the municipal supervision of the project; the city's quality and safety station is responsible for the city's housing construction resumption (open) of the project's prevention and control of the new coronavirus pneumonia outbreak. epidemic prevention and control work, directly responsible for municipal supervision of the project; Municipal Housing and Urban-Rural Development Bureau of Law Enforcement and Supervision detachment is responsible for the city's gas, heat resumption (start) of the project's prevention and control of the new coronavirus infection pneumonia epidemic, directly responsible for the municipal supervision of the project; Bureau of Quality and Safety Supervision is responsible for the city's construction projects resumption (start) of the new coronavirus infection pneumonia epidemic prevention and control of the work of the scheduling and summary of information, reporting, and so on. Work. All districts and counties and functional areas of the construction of administrative departments responsible for the jurisdiction of the construction project within the scope of supervision of the new coronavirus infection pneumonia epidemic prevention and control work.

V. Strictly control the time of resumption of work

In accordance with the requirements of the "Zibo Municipal Human Resources and Social Security Bureau on the delay of the city's enterprises resumption of work of the Emergency Notice, in addition to those involved in the protection of the operation of public **** business is necessary (water supply, gas supply, power supply, communications and other industries), the epidemic prevention and control of the necessity of the production and sale of medical equipment, pharmaceuticals, protective products (medical equipment, drugs, protective goods). Sales and other industries), the masses need to live (supermarkets, food production and supply and other industries) and other related to the important national life and other related construction projects, the city's all construction projects (housing construction, municipal, landscaping, landscaping, gas, heating) and new expansion projects shall not be resumed as early as 24:00 on February 9, during the period of unauthorized work or resumption of work, the construction administrative departments shall order the stoppage of work! The newest and most important of all, the newest and most important of all, the newest and most important of all, is the newest and most important of all.

Six, strict control procedures for the reasonable implementation of the resumption of work

Continuation of the project resumption or new construction before the start of the project, in addition to reporting the relevant to meet the quality of the construction site, safety, dust prevention and control of information, but also need to be submitted by the construction, supervision, construction units signed by the relevant person in charge of the unit and stamped unit seal of the project site of the epidemic prevention and control work Program, "inter-annual project resumption off new coronavirus infection pneumonia precautionary measures checklist" and "roster of construction project employees", the construction administrative departments and their safety supervision agencies to apply for resumption of project quality, safety, dust, epidemic prevention and control measures to implement the on-site conditions of supervision and inspection, meet the conditions of resumption of work or start-up, without the approval of the consent of the project are not allowed to start or Resumption of work without the approval of the project shall not be started or resumed.

engineering construction epidemic prevention work summary 2

Recently, the central **** issued a "notice on strengthening party leadership, to win the epidemic prevention and control of blocking the war to provide a strong political guarantee", the requirements to do where the task of the heavy where there is a party organization strong and powerful work, where there are party members when the vanguard as an example. In this battlefield without smoke, the majority of party members and cadres in the front, so that the party flag flying, is undoubtedly to the masses to eat the "pill".

The party flag fluttered to stabilize the hearts of the people. In such a special period, to see a cadre "four consciousness" strong, "four confidence" firm, "two maintenance" real, is to see whether the Party Central Committee unswervingly The decision-making and deployment of the Party Central Committee to put into practice, the epidemic prevention and control work of the most important work at present to grasp the real grasp thoroughly. We see, some support Wuhan medical task force, have set up a temporary party branch, party members face the party flag to recite the oath of joining the party, firm confidence in the expedition, to encourage morale. We also see that some medical workers in the old party members take the initiative to the party organization to put forward a solemn application to join the fight against the epidemic, which is the practice of the initial mission. The majority of Party members and cadres, especially the main leading cadres, must strengthen the responsibility to bear, actively as a flag bearer, do the benchmark, can not just marshal without marching, only blowing the horn without charging, where the masses, where the Party flag hangs, adhere to the depth of the grassroots, in-depth masses, in-depth front line, in a timely manner to do a good job in checking and prevention and treatment work. The majority of party members should be at the forefront, in crisis, calmly respond, decisive decision-making, rise to the challenge, become the backbone of the masses to fight the epidemic, caring people.

Precise policy warming. In the fight against the epidemic position, timely, transparent, information loss of guard, those plausible, ambiguous and even ulterior motives of the rumors will go to occupy. To this end, the majority of party members and cadres should be in the recognition of the situation to do the example, to do the example of firm confidence, to publicize the party and the government's decision to do the example of the dissemination of knowledge on the prevention and treatment to do the example. To take the initiative to learn and master all kinds of knowledge to prevent the epidemic, and actively publicize that the epidemic is preventable, treatable and controllable, and drive the masses around us to actively engage in self-protection. We should follow up and forward all kinds of confirmed information in a timely manner, and for rumors and unconfirmed "gossip", we should remind and stop them in time, so as to create a good atmosphere of public opinion. For the grassroots party cadres, in the village, community epidemic prevention work, we must pay attention to ways and means, not simply to close the road to drive away, exposure of privacy and other ways to prevent the epidemic, according to the actual situation to grasp the scale, the people's lives and health in the first place, scientific and rational epidemic prevention and control work, in order to take practical action to warm the hearts of the people.

All the people gathered together. Epidemic prevention and control is a war of all the people without bystanders, everyone is responsible for, need everyone to contribute. Fearless fighting in the front line of prevention and control of medical workers is in the effort to maintain a relaxed mindset living in the general public is also in the effort; stick to their posts, dedication to duty is in the effort to extend the holiday, with the prevention and treatment is also in the effort; dedication to love, generosity is in the effort to help, cleanliness, take care of themselves is also in the effort. This special battle, each of us is a special warrior. Party organizations at all levels and the majority of party members and cadres should play the role of a fighting fortress and vanguard role, widely mobilize the masses, organize the masses, cohesion of the masses, the implementation of the joint prevention and control measures, to eliminate the hidden dangers and risks in advance. We also firmly believe that under the strong leadership of the Party Central Committee, the majority of party organizations and party cadres will be able to lead the masses to converge an impregnable force to win the epidemic prevention and control of the blockade!

Engineering Construction Epidemic Prevention and Control Work Summary 3

This Spring Festival spent in the extraordinary. Epidemic prevention and control, no one is "outsiders", nothing is "outside", the Party Central Committee set up a leading working group to deal with the epidemic, initiated a "first-class response", all levels of financial subsidies issued 11.21 billion yuan (as of 0:00 on January 26), a number of "retrograde" medical teams, the people's sons and daughters of the army rushed to Wuhan, government staff "grid" guarantee, "carpet "Mapping, enterprises work overtime overnight to rush to make medical protection materials, the masses spontaneous donations and donations ...... is not said to have no clothes, with the son of the same robe. This "with the robe" love, contains 1.4 billion Chinese children with the same heart and mission of the same counterparts; this *** with the war "epidemic", practicing the people's heart is the "rigid demand", you and me *** love, "carpet" mapping, the enterprises worked overtime to make medical protection materials. You and I *** love, together, together. Recently, the weather has turned warm, but, every year in March and April, climate change is relatively large, the temperature difference between morning and evening is large, while the spring weather warms up, everything recovers, viruses, bacteria and other pathogenic microorganisms are also active, so the spring is the season in which influenza is prone to occur. The main symptoms of influenza are fever, headache, fatigue, loss of appetite, coughing, nasal congestion, and so on, which can lead to pneumonia and other complications.

In order to effectively prevent and respond to possible influenza epidemics, we must establish the idea of "health and safety first" and improve the awareness of self-protection.

The most effective and healthy way to combat influenza is to improve your immunity and to combine your daily diet with the right nutrients. The main `measures are the following:

1, develop good hygiene habits, often use soap and water to wash their hands, especially after contact with public **** items to wash their hands before touching their eyes, nose and mouth.

2, pay attention to food hygiene, can not be in the roadside stalls randomly buy food, because the roadside stalls health can not be guaranteed, a variety of dust, flies, unclean food utensils, etc. are hidden a lot of harmful bacteria.

3, balanced diet, do not pick food, eat more fruits, take enough nutrients.

4. Go to places where people gather as little as possible. Avoid contact with people with flu-like symptoms. Your own fever and flu-like symptoms should go to the hospital in a timely manner, and try not to go to public **** places to prevent infecting others.

5, usually pay attention to exercise, regular exercise, and ensure adequate sleep, enhance their ability to resist disease.

6, with the weather gradually become hot, the classroom must maintain ventilation, the human body exhaled carbon dioxide and other gases with the air to the outside, to avoid causing the presence of indoor odor.

Students, health is the most valuable treasure of mankind, we have to cherish. Influenza is not terrible, as long as we do a good job of prevention, we will be able to keep the virus out of the door, healthy and happy every day.

It is now between March and April. This kind of weather brings us the virus. Now, the hottest topic in many places is "influenza" or "flu" for short. Influenza is not a virus that can kill you, nor is it a virus that can kill you. It is just a small virus that spreads by droplets and airborne infections. Then why do they have such a great impact on human beings? It is because three children in Hong Kong have died within a short period of time as a result of "influenza". So we can't ignore it.

Influenza is different from the usual cold viruses, and the symptoms of people infected with this disease are also different. Moreover, it takes only a few efforts to recover from a normal cold. And infected with the flu is not only to take medicine so simple, he is well after the disease may fall into the roots of it! The flu spreads very quickly, especially in crowded public **** places. So, if you are not careful, you can catch the flu at any time.

Influenza has a short incubation period, spreads rapidly, and starts rapidly. The main manifestations are chills and fever, headache, cough, accompanied by sore throat. Serious complications such as pneumonia can be caused. Please do a good job of prevention.

engineering construction epidemic prevention work summary 4

a clear project participating units and personnel duties, strict implementation of epidemic prevention and control responsibilities

(a) construction unit duties. Construction unit responsible for the project epidemic prevention and control work, the implementation of the project full-time (part-time) prevention and control personnel, responsible for the daily epidemic prevention and control work. Responsible for checking and supervising construction companies, supervision units, professional contracting, equipment leasing, testing and monitoring units to implement the epidemic prevention and control responsibilities.

(ii) construction company responsibilities. Construction companies are specifically responsible for the project epidemic prevention and control work, the implementation of the project manager is responsible for the system, set up epidemic prevention and control management post. Responsible for the project before the resumption of work comprehensive investigation, the resumption of work to prepare for the resumption of work and the resumption of work after the daily prevention and control of the epidemic.

(C) supervision unit responsibilities. To assist the construction unit to supervise the construction company to implement the project epidemic prevention and control measures, and is responsible for the project supervision personnel epidemic prevention and control work.

(d) Participating construction unit personnel responsibilities. First, the construction unit project leader is responsible for daily inspection of the project epidemic prevention and control measures to implement. The implementation of prevention and control measures are not in place, take measures to stop work. Secondly, the project manager of the construction enterprise is responsible for the daily epidemic prevention and control work arrangement and inspection, supervise the project management personnel to implement the epidemic prevention and control responsibility, supervise the labor subcontracting, machinery and equipment leasing, testing and other units to implement the epidemic prevention and control responsibility. Third, the supervision unit project director to assist the construction unit to carry out daily inspection and supervision. Fourth, the construction enterprise epidemic prevention and control commissioner is responsible for organizing the new coronavirus infection pneumonia related knowledge publicity and education training; responsible for entering and exiting the site personnel temperature detection and registration; responsible for supervising the site personnel according to the requirements to wear masks, diligent hand-washing; responsible for supervising the work of site canteen food safety; responsible for supervising the site to do a good job of environmental hygiene; responsible for the competent authorities in charge of the industry in the area of the report on the prevention and control of the epidemic situation. The team leader is responsible for the team personnel epidemic prevention and control work.

Second, strict conditions for the resumption of work on the project to ensure that the epidemic prevention and control and production safety measures in place

Resumption of work before the site epidemic prevention and control and production safety measures, the project has reached the following conditions, can be to the local industry authorities to apply for the resumption of work.

(a) the establishment of the project manager is responsible for the epidemic prevention and control institutions, the establishment of special people and posts, docking the local industry authorities, disease control departments, the full implementation of the epidemic prevention and control measures.

(ii) set up a separate isolation observation dormitory, for the need to temporary isolation observation of personnel living alone. Isolation observation measures should be in line with the requirements of the local disease control department.

(c) Ensure that sufficient epidemic prevention materials are in place, the project should prepare enough masks, thermometers, disinfectant and other disease control supplies.

(d) Examine the history of exchanges and contacts between people who started and resumed work within two weeks to eliminate the imported and diffuse spread of the epidemic.

(e) the implementation of real-name management, strict entry and exit of real-name attendance, real collection and entry of all entry personnel name, ID number, type of work, shift, origin, contact information and other real-name information.

(F) site construction sites, living areas, office areas, machinery and equipment have been sterilized.

(VII) safety production conditions and safeguards to meet the requirements for the start and resumption of work.

Third, to strengthen the epidemic prevention and control of knowledge of publicity and training, improve the construction workers awareness of prevention and control and prevention and control ability

Construction sites should be through the adoption of publicity panels, brochures, electronic screens, microblogging group, the site explains a variety of ways to do a good job of the new coronavirus and winter and spring infectious disease prevention and control knowledge, regulations and policies. Publicity and training, so that each site practitioners proficient grasp of prevention and control of common sense and policy requirements, enhance awareness of prevention and control, improve prevention and control capabilities, take the initiative to inform the contact with the Hubei returnees and their own physical condition, consciously do: reduce the number of outings, to avoid crowded places; pay attention to personal hygiene, wear masks, wash your hands regularly, keep indoor cleanliness and air circulation; decentralized meals, do not gather; fever and cold, to health and health departments designated hospitals in a timely manner. The first thing you need to do is to go to the fever clinic of the hospital designated by the health department.

Four, strengthen the construction site personnel management, strengthen the epidemic monitoring and surveillance

Construction companies should enter the site of the personnel and vehicles are checked and registered, from Wuhan, Hubei and other areas of high incidence of the epidemic, and the confirmed, suspected cases of contact with the personnel to do accurate screening.

(a) the strict implementation of the construction workers real name management system, the implementation of site closure management, strict control of personnel in and out of the site, unrelated personnel are not allowed to enter the site. Construction site gates should be set up body temperature detection points, foreign personnel entering the site should be registered and body temperature detection, found that the body temperature of abnormal people should take timely measures.

(2) construction units should organize the project construction units to do a good job of post-holiday resumption of work personnel screening, to prevent the importation of the epidemic spread and diffusion of the spread. First, the construction unit should accurately grasp and register the health status of each employee, travel during the holidays and participate in rallies and gatherings, the epidemic has not been lifted before returning to Hubei or through Hubei has not yet returned to the employees, to mobilize them to stay in the local area, not to return for the time being. With the new coronavirus infection pneumonia case contact has returned employees, should take the initiative to the epidemic prevention and control commissioner report, the epidemic prevention and control commissioner to the jurisdiction of the epidemic prevention and control department report, according to the provisions of the isolation. Secondly, for employees who have been to Hubei (Wuhan) and other areas with heavy epidemics or who have a history of contact with Hubei (Wuhan) personnel, they are required not to return to their posts for the time being and are urged to be isolated at home or in specialized dormitories set up by the project for 14 days from the date of the last contact with the relevant personnel or arrival at the location of the project according to the requirements, and to return to their posts only after their bodies do not have any symptoms of fever and coughing.

(C) construction units should be co-ordinated to organize the post-holiday resumption of work personnel, the concentration of laborers (non-epidemic areas), it is recommended to arrange for vehicles to pick up the return, and return to the personnel to carry out a rigorous examination and body temperature testing.

(D) the implementation of health monitoring. Project participants should be on-site employees not less than two times a day temperature testing, and make a record, once found fever (body temperature ≥ 37.3 ℃), coughing, shortness of breath and other respiratory tract infection symptoms, should be promptly reported to the local government, epidemic prevention and control departments and the competent departments of housing and construction, and actively take protective measures, sent to the hospital designated by the health and health departments to receive medical treatment.

V. Strengthen the management of the construction site, make every effort to do a good job of daily protection.

(a) Strengthen the site environmental health management. First, the construction unit should strictly implement epidemic prevention and disinfection measures, the site of the office space and staff dormitory, canteen, toilets and other key parts of the increased cleaning and cleaning efforts, often open the windows to ventilate, to maintain indoor air circulation, and disinfection every day. Second, the construction site and living area, office area should be set up to collect containers of waste masks. Do a good job of garbage storage and transportation, sewage treatment. Third, the site bathroom should be equipped with hand sanitizer, hand towels and other hygiene products. Fourth, disinfection should use effective chlorine not less than 500mg / L disinfectant, disinfection 30 minutes, clean water wipe.

(B) to strengthen the site cafeteria safety management. Food procurement, processing and production, food supply and other cafeteria workers should wear disposable hats, masks, gloves. After the use of tableware, etc. should be sterilized at high temperature. After meal operation room should be kept clean and dry, strictly prohibit the mixing of raw food and cooked food supplies, avoid meat raw food. Cafeteria purchasing staff and supply staff should avoid direct hand contact with meat and poultry raw materials, and wash their hands promptly after removing gloves. The dining room is disinfected daily, and tables, chairs and seats should be disinfected after the meal is over.

(C) try to avoid the gathering of people. First, employees commute to work as far as possible not to take public **** transportation, it is recommended to walk, ride or take a private car to and from work. If you need to take public **** transportation, be sure to wear a mask throughout, try to avoid touching the public **** supplies with their hands. Second, the site employees should be used to eat meals, sit down to eat the last moment to take off the mask, to avoid face-to-face dining, to avoid talking at meals, to avoid piling up meals. Wash your hands before and after eating. Third, pre-shift education, technical briefing and other activities should be decentralized. Fourthly, epidemic prevention and safety education should be carried out by means of WeChat and broadcasting. Fifth, reduce the centralized meeting. If you do need to centralize the meeting, you should give priority to open and ventilated places, and the participants should wear masks and wash their hands before and after entering the meeting place.

Six, the establishment of the information reporting system, to ensure that the information flow

(a) site before the resumption of work, the construction unit should be organized to participate in the project to prepare epidemic prevention and control of the work of the plan and the organization to fill out the "Zhoukou City, the construction site personnel (including construction, construction, supervision and other units of personnel) information registry", reported to the local housing construction competent department for the record. After the site opened and resumed work, the personnel, if any changes, should be reported in a timely manner.

(ii) construction companies should establish epidemic prevention and control of the daily reporting system, the project since the date of resumption of work, the implementation of something to report, nothing to report peace "zero report" mechanism, every day before 17:00 pm should be reported to the competent authorities of the local housing construction epidemic prevention and control of the day. Information should be reported using information technology. Once found suspected epidemic symptoms people, construction companies should immediately report.

Seven, strengthen supervision and inspection, and severely investigate and deal with violations

The competent departments of housing and construction at all levels should strengthen the supervision and inspection of the post-holiday projects, supervise and guide the construction sites to strictly implement the epidemic prevention and control measures, and the projects do not meet the conditions of the unauthorized opening and resumption of construction, or the participating units do not conscientiously implement the responsibility of epidemic prevention and control The, in accordance with the rules of law on the responsible units and responsible persons for serious treatment; to participate in the construction of units due to the epidemic prevention and control work is ineffective, resulting in the spread of the epidemic in the site, the transfer of the relevant departments to pursue the legal responsibility of the responsible units and responsible persons.

Engineering construction epidemic prevention work summary 5

First, the strict implementation of the construction site epidemic prevention and control responsibility. Construction units bear the main responsibility for the prevention and control of construction site epidemics, the construction unit is the main person in charge of construction site epidemic prevention and control of the first responsible person, responsible for the prevention and control of construction site epidemics, set up a special post for the management of epidemic prevention and control, the implementation of day-to-day preventive and control measures as well as the project resumption of the comprehensive investigation before the start of the resumption of work to prepare for the resumption of work and other work. Supervision, professional subcontracting and other units to assist in the implementation of the project epidemic prevention and control measures, and is responsible for the epidemic prevention and control of the unit personnel. The construction unit to coordinate the organization of all parties involved in the construction of the implementation of their respective responsibilities, inspection and supervision of construction, supervision and other relevant units to implement the epidemic prevention and control responsibilities.

Second, strictly obey the local party committee, the government's unified deployment and the relevant departments of the prevention and control requirements. Construction sites should be signed with the local people's government resumption of work epidemic prevention and control responsibility, in strict accordance with the local party committee, the government's unified deployment of the local epidemic prevention and control headquarters under the guidance of the epidemic prevention and control of construction sites to carry out prevention and control work, the establishment of a joint prevention and control mechanism, to ensure that the epidemic is preventable and controllable. Housing and urban-rural construction departments at all levels should work together with health and health departments to strengthen the supervision and inspection of local construction site epidemic prevention and control work, and strictly supervise all parties involved in the construction of the full implementation of epidemic prevention and control responsibilities to ensure that the implementation of the various preventive and control measures, down to the smallest detail. Construction sites that do not meet the epidemic prevention and control requirements should be ordered to immediately rectify the situation, and are not allowed to resume work without rectification in place. Unauthorized resumption of work, the epidemic prevention and control of ineffective, non-reporting, slow reporting, omission and concealment of the epidemic situation, as well as human causes leading to the spread of the epidemic of the relevant units and personnel, according to the law and regulations to be seriously held accountable.

Third, the strict implementation of closed construction site management. Effectively strengthen the construction site order maintenance, so that the operating area, living area and the outside world enclosure closed. Strictly implement the real-name management system, the establishment of real-name labor accounts. As far as possible, only one entrance/exit is opened at the construction site, and body temperature testing points are set up for incoming and outgoing personnel. Register all personnel and vehicles entering and leaving the site, and strictly control the entry of unrelated personnel. Configuration of the temperature detector, to enter the site of the personnel temperature measurement, such as fever, cough and other suspected symptoms are not allowed to enter the site.

Fourth, strictly strengthen the knowledge of prevention and control education. The related epidemic prevention and control knowledge education into the field and daily pre-job education, in the site of the prominent location of the epidemic prevention and control of publicity posters, or through WeChat, radio and other ways to publicize, enhance the construction workers self-prevention and control awareness and personal protection ability.

Fifth, the strict implementation of protection and security materials. The site should be based on the scale of the project and the actual situation of the number of workers after the start of the number of workers back to work, equipped with the appropriate number of temperature detection instruments, disinfection supplies, disposable medical masks and other protective supplies, equipment, and the establishment of anti-epidemic materials reserve use of the account, to ensure that the anti-epidemic materials are sufficient to be in place.

Sixth, the strict implementation of the start, resumption of work audit system. Do need to start or resume the project must comply with the autonomous region of housing and urban-rural construction department conditions, the local command and housing and urban-rural construction departments agreed to start, resume work. Do not have the corresponding conditions of the project, shall not be approved to start or resume work. Without the consent of the start or resumption of work, did not establish the epidemic prevention and control system, did not implement the personnel epidemic prevention and control management, all from the strict and serious treatment.

Seven, strictly strengthen the management of construction site personnel. Construction sites do not engage in the start of the year meal, do not hold large meetings. Before the resumption of work, to return to work one by one personnel for temperature testing, and timely reporting of relevant information, from or have been to the key areas of the epidemic and its close contacts, in accordance with the provisions of the strict implementation of medical observation, isolation and other measures to ensure full coverage, no omissions. For workers who have not yet returned to the heavier areas of the epidemic, they should be persuaded to stay in the local area and not to return to work until the epidemic is lifted. To urge construction sites in foreign provinces and districts to take the initiative to report to the community and the unit, and urge the requirements since the arrival of the project site, home quarantine or in the project site set up in the isolation area to observe 14 days, the body does not appear fever and other abnormal conditions before returning to work.

Eight, strictly good management of the construction site work area. The establishment of a full-time hygienist, the establishment of personnel daily health monitoring accounts, construction work areas to set up temperature detection points, timely grasp of the health of personnel, found that there are suspected symptoms should be immediately isolated and promptly reported to the local epidemic prevention and control departments. All personnel should take personal protection measures, wear masks, helmets, safety belts and other safety protection products and construction tools, as far as possible to achieve the exclusive use of personnel. According to the situation to take shifts, groups, zoning construction and other ways to reduce the cross between shifts, the operating personnel should wear masks according to the regulations, to maintain the epidemic prevention and safety distance of more than 1.5 meters, and try to avoid large-scale group work. Environmental cleanup and remediation of the construction site should be carried out on a regular basis. When external vehicles distributing materials and supplies enter the construction site, the personnel on board shall not leave the cab without authorization, and the goods and supplies shall be received and loaded and unloaded by the project department by arranging the personnel within the construction site. To use the existing facilities to set up a separate isolation observation area for temporary isolation observation of personnel living accommodation.

IX. Strictly strengthen the management of the living area of the construction site. Strengthen the site environment disinfection and epidemic prevention, every day on the construction site offices, dormitories, canteens, bathrooms, toilets and other personnel gathering areas or public **** area to do a good job of cleaning, ventilation and disinfection disinfection work. Living sewage septic tank to do a good job of disinfection and epidemic prevention, do not have the conditions, to set up a special sewage collection device, and do a good job of transfer, discharge management and disinfection and epidemic prevention. It is strictly prohibited to steal and dump garbage indiscriminately, and special waste masks and other special harmful garbage fixed collection barrels should be set up. Workers' dormitory settings should be in line with the epidemic prevention and control requirements, and lodgers should try to avoid excessive gathering of people. Strictly implement the requirements of hygienic standards for food procurement, processing and storage, do not consume wild animals, and do not privately slaughter or dispose of poultry at the construction site during the period of epidemic prevention and control, so as to effectively safeguard food safety. Site cafeteria should take measures to share meals to reduce the spread of the epidemic caused by the gathering of people hidden.

X. Strict implementation of the epidemic information reporting and duty system. The establishment of epidemic prevention and control of the daily reporting system, the project from the date of resumption of work, the implementation of the "zero report" mechanism, every day to the local construction authorities to report on the day of the epidemic prevention and control of the situation, and as far as possible to use information technology means of reporting. Strengthen the site duty duty, strict implementation of the 24-hour duty system, timely understanding of the site of the situation, the emergence of the epidemic according to the requirements of timely processing and reporting.

;