1, under the premise of meeting the building function, assembly building design should adopt standardized and serialized design method to meet the requirements of systematic design, give full consideration to the standardization, modularization and diversification of the components, and prepare a complete set of design documents for design, production and construction installation.
2, in the pre-planning and design stage, the various professions should be fully coordinated, combined with the building function and modeling, planning for industrialized and standardized prefabricated concrete fittings used in various parts of the building, and actively adopt new materials, new products and new technologies according to local conditions. In the master plan should be considered in the production and stacking of accessories and lifting and transportation equipment service radius of the space required.
3, assembly of concrete structures in the precast components (columns, beams, walls, slabs) should follow the division of reasonable force, simple connection, easy construction, less specifications, more combinations, and can be assembled into a variety of forms of structural series of principles.
4, the design should comply with the principle of modulus coordination, to achieve modulus coordination between the building and components, as well as modulus coordination between components and components of the integrated and industrialized production, to achieve the integration of civil engineering and decoration under the principle of modulus coordination and to achieve one-time in place for decoration.
Expanded:
Assembled concrete structure design must give full consideration to the reliability of the structure of the nodes, splicing joints and other parts of the connection structure, at the same time, the assembly of concrete structure design requirements for the decorative design and architectural design synchronization completed.
The design of component detailing should express the points of pre-buried parts relative to indoor water and electricity required for the decoration project. Only in this way can be directly utilized in the decorative stage of prefabricated components in the reserved, pre-embedded pipelines. Will not destroy the wall due to later point changes.