Emergency Exercise Program

In order to ensure that the work or things in an orderly manner, it is essential to develop a program in advance, the program is a written plan with strong operability. Then how to develop a scientific program? The following is I help you to organize the emergency drill program 6 articles, only for reference, we take a look at it.

Emergency Drill Program Part 1

I. Purpose of the activity:

In order to enable students to master the fire, disaster safety knowledge, from childhood to cultivate a sense of safety and self-protection, the whole school teachers, students and staff for the safety of self-protection knowledge education of the study; and held a student fire escape drill activities, aimed at cultivating the students to grasp the correct escape essentials to cope comfortably with the The purpose of the drill is to train students to master the correct key points of escape, so as to cope with fire and other emergencies.

Second, the activity time : March 22, 20xx

Third, the activity requirements:

(1) to participate in the activities of all students in the classroom classroom directly according to the order of the seat side by side two (not the whole team), quickly from the scheduled safety exit (front and back door) to withdraw from the classroom. The first step is to take a look at the classroom, and the second step is to take a look at the door.

(2) the evacuation of students in the basketball court, playground, runway collection, from north to south in order of priority, the command and guidance teacher to the drill command center to report the number of people.

(3) activities to participate in the drill students obey the command, do not jump ahead, do not push, do not crowd, help each other.

Fourth, the escape drill method and personnel arrangements:

1, the students who participated in the drill heard the radio alarm, do not panic, remain calm, in the guidance of the teacher's leadership, in accordance with the proposed route for rapid evacuation to the runway, playground.

(1) the proposed route:

students in the classroom that is out of the front and back doors to escape, in the reading room and laboratory classes teacher first open the back door, so that students from the front and back doors at the same time escape.

(2) The teacher of the classroom is the emergency evacuation teacher; the teacher on duty in the duty room is responsible for cutting off the total power supply of the classroom. The teacher who maintains the order of the last evacuation should inspect the classroom to see if there are still students, and bring them to their corresponding classes.

(3) the guidance teacher must always pay attention to the situation of students, to avoid aisle congestion caused by the danger of the evacuation of students to the class as a unit, organized in the large playground collection. Before the end of the activity, the evacuated students can not enter the classroom again at will.

(4) All outdoor classes on the playground, etc., after hearing the alarm, the teacher is responsible for quickly leading students to the north side of the playground assembly. After that, the teacher of the outdoor class stayed in charge of the management, and the rest as the receiving teacher, arranging the evacuation down the collection of teachers and students.

(5) To simulate the authenticity of the activity, students participating in the exercise in the environment with smoke, try to shut up, reduce talking, as far as possible, use wet towels, masks, etc. to cover their mouths and noses, and cats from the classroom to evacuate.

2, students in order to evacuate the classroom, quickly come to the runway, playground, listen to the command of the receiver.

3, after the evacuation of the concentration of students in each class count, to the drill command center report, to determine no casualties, by the drill command center, the commander-in-chief announced the success of the drill. The end of the exercise in all classes of students in order to return to the classroom for normal teaching activities.

4, teachers concerned about the casualties of teachers and students, once the accident, take first aid measures to minimize the damage.

5, the activities of the leading group (drill command center):

Leader (commander-in-chief): Wang Xunhua

Deputy leader: Xu Dongsheng

Members: all teachers

Alarm: Xu Dongsheng

Evacuation guidance group: Gao Sheng Sheng

Casualty treatment group: Liu Lulu, Bian Yanqin

Fire-fighting Operation Team: Zhu Jianmin

Communication Team: Wu Jihua, Zhou Xiyun

Teachers of Evacuation Guidance for Each Grade:

Grade 1 Class 1: Sun Tianxin

Grade 1 Class 2: Zhao Haibing

Grade 2: Liu Ruili

Grade 3: Xu Dongsheng

Grade 4: Wang Xiaosong

Grade 5: Wu Jihua

Sixth grade: Gao Guanyang

V. Preparation for the event:

1. A meeting was held to tell all teachers and students about the contents and procedures of the drill. Through the campus radio to all teachers and students to introduce the precautions in the process of evacuation and escape.

2. Each class should attach great importance to the careful organization, careful arrangements, the evacuation of the line strictly in accordance with the provisions of the walk, the teacher walks in the back of the students to organize the command.

3. Students evacuated to pay attention to a hand to cover their mouths and noses, stooping and walking quickly; stairway can only be 2-way column march. All teachers to strengthen the command, we must do fast and not chaotic, to prevent accidents caused by falling.

4. All teachers involved, all classroom teachers to the class to participate in the drill. Classes of special students to have someone in charge.

Emergency Drill Program Part 2

I. Purpose of the drill:

In order to improve the fire prevention awareness of the project staff, popularize the fire common sense, master the knowledge and skills of fire escape and self-rescue, effective prevention of various types of fire accidents, the project department in the spirit of intuitive, standardized observation of the fire drills, so that employees master simple fire prevention and escape Self-help knowledge. In order to strengthen the fire safety four ability (check to eliminate fire hazards ability, the organization of the ability to fight the incipient fire, the organization of the evacuation ability and fire prevention education and training capacity) of the construction.

Second, the risk of analysis

Spring high winds and dry, is a high incidence of fire hazards. Since entering the spring, the site of the increasing use of electricity, there are a variety of possible factors of fire gradually increased.

Three visitors

The project manager, the site full-time safety officer and all employees.

Four, the emergency drill organization system and division of responsibilities

(1) fire drill command center

Chief Commander: Ran Wei

Responsibilities: Responsible for according to the nature of the accident, the extent of the decision on whether to start the emergency rescue procedures and the level of activation. Responsible for the overall organization of work during the emergency drill.

Sub-commander: Zhang Xiu-cheng

Responsibility: with the commander-in-chief is responsible for the overall work during the emergency drill arrangements or entrusted by the commander-in-chief to exercise the duties of the commander-in-chief.

Technical leader: Yu Xiaolong

Responsibility: specifically responsible for the emergency site structure assessment and emergency measures to make technical decisions and to assist in firefighting command.

Information liaison person in charge: Yang Huitao

Responsibility: During the emergency plan to ensure that the project department within and outside the normal communication.

Coordination: Yang Linke

Responsibility: emergency plan during the emergency work required to coordinate personnel, materials.

The person in charge of security: Zhang Xiaoyi

Responsibilities: to analyze and assess the safety of the fire fighting program during the emergency plan exercise. Ensure that all emergency work is safe and orderly.

(2) Professional Emergency Response Team and its responsibilities

a) Volunteer Fire Brigade: Captain: Ran Wei

Set up a volunteer fire department: the main implementation of fire-fighting operations, the organization of the evacuation of people.

b) personnel allocation: Ran Wei . Yang Huitao, Yang Linke, Yu Xiaolong . Zhang Xiuwu Yao Yaqing, Ran Zhijie Gu Xucheng Zhang Xiaoyi

Photo: Yao Yaqing

Five, need to prepare the materials

1, fire extinguishers 6

2, wood 10kg, diesel fuel 4kg

Six, the fire emergency drills

Six, fire emergency drill time

February 28, 20xx 15:30

seven, fire drill location:

2# building next to the wood pile dummy set a fire point

eight, emergency drill implementation steps

1) February 20xx 28, 8:30 ~ 9:30 held a special meeting of the site fire drill, emergency drill instructions and conveyance.

2) February 28, 10:00 a.m. fire supplies preparation team to check the warehouse firefighting equipment and supplies, and reported to the fire drill command center.

3) firefighting knowledge on-site to explain the use of fire extinguishers

Drill steps:

1, 15 o'clock someone found a fire in the construction site, immediately view and report the Department of Quality and Safety, the Department of Quality and Safety immediately reported to the Fire Command Center Chief Commander for instructions, the Chief Commander issued the start of the emergency rescue instructions to the head of the communications team to notify all the participants of the voluntary firefighters in the vicinity of the fire Gather for emergency treatment.

2, after the warning signal issued by members of the leading group, the professional groups, volunteer firefighters rushed to the scene within five minutes to organize rescue work, and report to the commander-in-chief of the personnel in place, by the emergency leadership of the commander-in-chief unified command.

3, the commander-in-chief depending on the scene of the fire situation to determine the level of emergency, when the fire is small, determined to lead the volunteer fire department to extinguish the fire on their own, the organization of personnel to extinguish.

4, sudden gusts of wind, the fire became larger, the commander-in-chief immediately arranged for the volunteer fire department to organize the evacuation of personnel to extinguish the fire on their own is more difficult to immediately arrange for the head of the communications team, Liu Fu-liang call 119 (tell the fire department to tell the fire details of the address, the fire situation) and do their best to implement the fire to fight the fire itself.

5, arranged for personnel in the 119 vehicles must wait at the intersection, the fastest speed to guide the 119 fire rescue personnel to reach the exact destination.

6, the commander-in-chief of the exercise to comment, please project office, the director of the Office of the observed leadership speech, and finally by the commander-in-chief announced the end of the exercise.

7, the end of the exercise, finishing the scene, the Department of Safety and Quality according to the exercise to write a summary of the exercise, according to the actual situation of the plan to optimize, supplement and improve.

Emergency drill program Part 3

I. Purpose of the drill

Emergency rescue plan emergency drill is to test, evaluate and maintain the company's environmental protection accident emergency rescue plan emergency response capability and effectiveness.

Second, the 'role' of the drill

1, can be exposed before the accident really happened the defects of the plan and procedures;

2, to find out the inadequacy of emergency response resources (manpower and equipment, etc.);

3, to improve the communication and coordination between the various emergency response departments, agencies, personnel;

4, to enhance the confidence of the staff to deal with the unexpected accident rescue and rescue Awareness;

5, improve the proficiency and technical level of emergency rescue personnel, and further clarify their positions and responsibilities.

Third, the drill time and place

May 20, 20xx at eight o'clock in Terry dyeing and weaving factory.

Fourth, the type of drill

Full-scale drill: for the company's environmental accident emergency rescue plan for part of the emergency response function, test, evaluate the company's emergency organization's emergency response capabilities.

V. Scope of the exercise

1, the emergency response and rescue of the dyeing material leakage.

2, the test of the emergency response capacity of the pipeline in the plant.

3, on the personnel in the emergency state of emergency proficiency test.

Sixth, the emergency leadership group:

Leader: Huang Junmin

Deputy leader: Feng Yanping, Chen Jifang, Ge Keyang

Members: Chen Jian, Ge Wei, Zhang Jianlin, Zhang Jinyan, Gu Xun, Wang Bin

Seventh, the process of the drill

1. Drill content: due to heavy rainfall, an employee found that the leakage of dyeing materials led to the sewage flow into the storm sewer. Rain sewage pipe, after preliminary treatment reported to the company's emergency environmental protection team, by the rescue team, the sewage successfully back to the cesspool, the leakage is under control.

2. Drill materials: anti-chemical gloves, masks, medical kits and first aid medicines. With drill records:

1. Time: 8:00

Item: leakage occurs

Drill content: leakage occurred in the dyeing material warehouse in the factory area

2. Time: 8:03

Item: discovery, initial treatment, reported to the emergency response team

Drill content: the staff found the dyeing material leakage, do the initial treatment and immediately notify the emergency response team. Notify the emergency response team.

3. Time: 8:05

Item: Receive the police, release the alarm

Drill content: the emergency command received the alarm, immediately notify the rescue team by phone.

4. Time: 8:06

Project: on-site accident treatment

Drill content: immediately after the analysis of the team leader to make the instructions to close the emergency valve, the relevant

personnel immediately rushed to the emergency valve to close and check the situation of its backflow.

5. Time: 8:15

Project: site treatment

Drill content: the emergency command directed to carry out on-site cleanup, completely eliminate potential hazards, and pollution-free treatment.

6. Time: 8:30

Item: Alarm lifting

Drill content: emergency response team members reported: the site cleaned up; followed by the emergency response team leader announced the end of the emergency state.

End of the exercise.

Emergency Drill Program Part 4

In order to improve the project's accident emergency rescue capability, effectively dispose of unexpected accidents, establish and improve the scientific, effective and well-functioning emergency rescue system, test the effectiveness of the emergency departments in the field, organize and carry out the project's electrocution accident emergency rescue drills, and specially formulate this program.

First, the guiding ideology and purpose of the exercise to implement the "safety first, prevention first, comprehensive management" policy, to establish and improve the project emergency management system, the formation of a unified leadership, timely response, scientific decision-making, disposal of organized emergency response system, and comprehensively enhance the project to deal with emergencies and risk capacity. Through the set accident emergency drill, test the feasibility and operability of my project emergency rescue plan, improve the emergency team emergency rescue and disaster relief ability, and constantly improve the overall level of my company's emergency rescue work, and effectively protect the project staff life and property safety.

Second, the drill time, location and participating units

(a) The drill time is proposed on June 29, 20xx.

(b) The drill location Fangjiashan Project Department construction site.

(C) drill participating units and personnel

1, the project department leadership: general manager, quality assurance manager, HSE department manager, the construction team manager

2, safety officers, part of the team, ambulance drivers, nurses.

Third, the accident set the accident set: June 29, 20xx 9:30 am, the employee × × × in the cutting operation, due to the aging of the power line insulation skin breakage caused by the third level of the distribution box charged, when another employee × × × in the opening of the door of the distribution box electrocuted, the employee electrocuted coma, the situation is very critical. The employee who carried out the cutting operation took immediate measures to provide first aid and reported to the HSE department.

Fourth, the drill procedures and task division

(a), personnel arrangements

1, commander-in-chief: the project general manager deputy commander-in-chief: Quality Assurance Manager

2, group members: other leaders of the Department of managers, managers of the various departments, the various professional construction team / plant responsible.

3, the participants: safety officers, shift personnel, ambulance drivers, nurses, ambulance personnel, integrated office personnel.

4, records and photography: HSE management office personnel and integrated office personnel

(2), the exercise project: electric shock rescue

(3), the preliminary preparations:

1, the construction of safe use of electricity knowledge and prevention of electrocution of common sense window publicity; (HSE Department, the integrated office is responsible for)

2, the site of the temporary power facilities to carry out Check; (Ministry of Engineering electrician class is responsible for)

3, site drills site layout. (HSE Department and the construction team is responsible for)

(D), electrocution rescue specific arrangements:

1, the collection of participants in the exercise;

2, clean up the site, prepare the tools;

3, listen to the safety management personnel.

4, start the drill. Employee × × in the cutting operation, due to the aging of the power line insulation skin breakage caused by the tertiary distribution box charged, resulting in another employee × × electrocuted when opening the door of the distribution box. After the accident, each participating drill unit carried out rescue according to the following procedures and assigned tasks.

1) 9:30 minutes, the employee × × electrocution, cutting operations personnel found the accident immediately went to the main gate out to pull down the electric switch, quickly conduct on-site first aid, and telephone report to the Ministry of HSE personnel as well as the higher leadership, the HSE Department received the report immediately after the organization of personnel rescue and report to the higher level;

2) 9:38 minutes, the Ministry of HSE rescue vehicles and ambulance personnel Arrive at the scene for first aid treatment;

3) 9:40 minutes, the general manager of the project or quality assurance manager received the report and quickly rushed to the scene of the accident, and simulated notification of the County Administration of Work Safety and the County Construction Bureau authorities;

4) 9:45 minutes, the electrocution of the person lifted into the ambulance and sent to the hospital for examination and treatment.

5, focus on the content of the exercise:

1) on-site construction team in the report at the same time pulling the electric switch;

2) at the scene of cardiopulmonary resuscitation and other methods of resuscitation;

3) the injured sent to the hospital for examination and treatment;

6, the end of the exercise (announced);

7, clean up the scene.

V. Exercise command and rescue action organization system and responsibilities

According to the "Emergency Preparedness and Response Control Procedures", the major accidents emergency rescue command, rescue action organization system and responsibilities are as follows:

Chief Commander: General Manager of the project, responsible for the overall command.

Deputy commander-in-chief (site command): quality assurance manager, responsible for construction site command.

(a) medical rescue group: responsible for the emergency evacuation of the site personnel safety evacuation work, responsible for the transportation of injured people to the hospital treatment, responsible for the accident area cordon work.

(B) Information Liaison Group: responsible for the accident site communication and external contact.

Emergency Drill Program Part 5

In order to further implement the "prevention-oriented, prevention and control of the combination" policy, to enhance the awareness of the whole school teachers and students of the worry, sense of responsibility and safety, and to improve the emergency response to emergencies and the ability to escape from the self-rescue. The school decided to focus on safety evacuation drills in the near future, now develop the following emergency drill implementation plan:

I. Emergency evacuation drill schedule

Teaching building evacuation drill time: May 20, 20xx 10:00 a.m.

II. Drill content

The teaching building students, teachers and office building teachers, cafeteria and mini-mart practitioners evacuation drill

Third, emergency evacuation drill leadership group

Commander-in-chief: Tang Guosheng

Deputy Commander: Nie Hongxiang, Chen Shixiang

The scene of the overall command: Chen Shixiang

Fourth, the object of participation: the entire school teachers and students and practitioners

V. Emergency evacuation drill working group

1, the drill program implementation team

Responsible for: Luo Tianyou

Members: Liu Xiangjian, Wu Deping, Cheng Bitian

Responsibilities: Responsible for the development of simulated security evacuation drill activities and implementation of the implementation details.

2, drill equipment, medical support group

Responsible for: Qiu Yexin

Members: Liu Jiayuan, Zhang Jingyuan

Responsibilities: Responsible for the simulation of security evacuation drill activities of the equipment and medical security work.

3, drill communication security, publicity and reporting team

Responsible for: Fu Maoquan

Members: Wang Yongguo, Yuan Yong, Li Ya

Responsibilities: Responsible for the simulation of the security evacuation drill communication security work, publicity and reporting work.

Six, the scene layout and exercise

1, safety evacuation drill activities publicity banners, publicity slogans, to create an atmosphere of activity.

2 students in the classroom scene.

3, simulated teachers in their respective workplace scenes.

Seven, the organization and implementation of the preparatory work

1, the drill site preparation includes: whistles, command cuffs sign, the building to run to the sign, the safety position sign, the class collection of signs and so on.

2, the preparation of the student safety evacuation site

3, teachers and students evacuation drill mobilization preparation

4, the evacuation of the site hosted by the commentary

5, the evacuation drill summary speech

eight, the implementation of the procedures for the implementation of student safety evacuation drills in the school building and the content

(1) safety Evacuation drill implementation steps

1, 20xx May 20, 9:10 am, held a school-wide emergency evacuation drill command will be, (Remarks: students in the classroom, staff in the multimedia room on the second floor), specific arrangements for the deployment of the teaching building evacuation drill program implementation work.

2, 9:50, teachers, students and other personnel to enter the post, do a good job before the drill preparations.

3, 10:00 commander-in-chief announced the start of the student teaching building safety evacuation drill.

4, students are in class, assuming that a sudden earthquake or fire and other safety incidents, the teacher on general duty issued an emergency evacuation order (signal: emergency, short whistle), the school alarm sounded, the evacuation drill officially began.

5, students in the classroom teacher's guidance, in accordance with the school emergency evacuation requirements, the fastest speed and orderly evacuation to the designated safe place (school outside the playground).

6, 10:02, each department, each class count the number of evacuation drill ended.

7, 10:10, students gathered in the playground, the school leader summarized speech.

(2) student teaching building evacuation channel arrangements

The first floor of the multimedia room of the personnel directly evacuated to the school playground.

3. 3 classrooms on the second floor; 3. 4 classrooms, 2. 3 classrooms on the third floor; 2. 5 classrooms, 2. 1 classrooms on the fourth floor; and 1. 1 classrooms, 1. 2 classrooms on the fifth floor were evacuated from the left stairway of this floor to the outer playground. (***7 classrooms)

Students in the 3. 5 classrooms on the second floor; 2. 4 and 3. 1 classrooms on the third floor; 2. 2 and 3. 2 classrooms on the fourth floor; and 1. 3 and 1. 4 classrooms on the fifth floor will be evacuated to the outside playground from the right stairway on this floor. (***7 classrooms)

Teachers of all sections, teaching and research groups, and practitioners are evacuated to the playground from the appropriate stairway as appropriate.

(3) teaching building evacuation channel conductor arrangements

When the school issued an emergency evacuation drill signal, the teachers on duty to organize the students, according to the predetermined evacuation routes in a rapid and orderly evacuation, the specific arrangements:

1, the first floor of the left and right staircase evacuation conductor: Liu Xiangjian, Cheng Bitian

2, the second floor of the left and right staircase evacuation conductor: Chen Shixiang, Wang Yongguo

3, the third floor left, right staircase evacuation commander: Wu Deping, Qiu Yexin

4, the fourth floor left, right staircase evacuation commander: Li Ya, Fu Maoquan

5, the fifth floor left, right staircase evacuation commander: Yuan Yong, Cheng Biyin

6, the student playground evacuation personnel: Tang Guosheng, Nie Hongxiang, Luo Tianyou

Emergency drills requirements: the first floor of the first floor left, right staircase evacuation commander: Liu Xiangjian, Cheng Bitian strong> Nine, emergency drill requirements

1, attach great importance to strict precautions, carefully organized to ensure that nothing goes wrong.

2, before the drill by the classroom teacher in the students in the publicity, education, do a good job of student organization,

Be sure to do so that every student is clear about the precautions in the evacuation drill.

3, after hearing the emergency evacuation whistle issued by the school, the whole school teachers and students immediately act, fast and orderly evacuation. Attention to safety in the evacuation, not crowded push and pull, do not make a lot of noise to prevent accidents.

4, emergency evacuation should try to lower the center of gravity, evacuation along the walls of the building.

5, all the staff involved in the drill on time, not to leave their posts without authorization.

6, the evacuation of students to do all the actions under the command, according to the designated location assembly.

7, the class evacuated to the designated location, according to the class assembly count, by the class teacher to the drill program implementation team responsible for reporting the evacuation of the class in place and the reasons for the lack of staff.

Emergency Drill Program Part 6

A fire drill purpose:

The organization of this fire emergency drill, one is to enhance the staff's awareness of fire safety, skilled in the use of various types of fire extinguishing equipment, to improve the organization of fire fighting work and the ability to deal with the fire, so that in the event of an emergency, to be able to quickly and effectively, orderly rescue work, the hazards of the accident, and the need to protect the environment and the safety of the staff. In case of emergency, the company will be able to carry out rescue work quickly, effectively and in an orderly manner, and minimize the danger of accidents. Secondly, the organization of joint exercises to strengthen the tacit understanding of the linkage command with the fleet.

Second, the fire accident emergency drill time and place:

Time: proposed in late May 20xx

Location:

Third, the participants:

All the staff of the oil depot, the fleet part of the personnel.

Observers: distribution center related leaders.

Fourth, the site division of labor and responsibilities

(a) commanders and responsibilities

Site commander: East Chuan Chen

Responsibilities: full responsibility, command, scheduling, coordination of the relevant departments to do a good job in preparation for drills and exercises, to achieve substantial results in preventing the occurrence of sudden accidents, reduce the general accident, to eliminate serious and severe accidents. General accidents, to put an end to serious and serious accidents and the implementation of emergency rescue plans to create a new situation.

On-site deputy commander-in-chief: Zheng Zhongyun, Liu Dongwu

Responsibilities: cooperate with and assist the commander-in-chief to do a good job on-site scheduling, coordination and command.

On-site coordination: Zhao Liang

Responsibilities: Responsible for coordinating the relevant departments to do a good job in preparation for the exercise and on-site coordination, scheduling, camera work.

(B) the division of labor responsibilities

rescue group

Zheng Zhongyun: after the accident, as the emergency rescue group leader, responsible for organizing the emergency rescue group members of the fire fighting. (The first batch of 10 people with a fire extinguisher, 1 person each time; the second batch of 10 people with a water belt, 2 people each time.)

Members: Guan Wei, Huang Xianyou, Li Guangxin, Zhang Huanqing, Li Hong, Wang Shaowen, Li Zhanzhu, Yan Shengjun, Yin Jianwen, Zhang Xin, Cang Xuefeng, Ma Xinli, Gong Junlong, Shang Qinglin, Zhang Ensen, Zhou Lianyou, Tian Bing, Dong Jian, Sun Yuguang, Yuan Shibin, Shi Chunle

Li Qiansheng: After the fire shut down the pay oil operations, organizing the closure of valves, and arranging for the site of the parked vehicles quickly. Leave the scene of the accident

Members: Liu Tianyu, Liu Xin, Wang Xiuyun, Zhou Shihong, fleet driver Alert group

Arrange for personnel to guard the isolation, guide the fire vehicles into the warehouse.

Members: Deng Hongwei, Tian Dandan, Meng Lili, Guan Bailing, Li Fengjun, Du Xiangzhi, Guan Weirong, Xiao Yan, Yu Dongmei

Supply group

Liu Zhi: after the accident, as the head of the emergency supplies security group, responsible for organizing

Emergency supplies security group to prepare emergency supplies including spare firefighting equipment, fire hoses, emergency protective equipment.

Members: Wang Xiaoman, Chai Radium, Long Navy, Lei Linlin, Tang Kaiyu, Sun Yan, Liu Dejun, Li Siyu, Wang Deyun

Information Group

Wen Yan, Jia Yuqin: Responsible for the occurrence of accidents, alarms to the police to the 119, and contact with the relevant departments to communicate.

Zhao Liang: responsible for the emergency drill process process of photography

Ambulance group

Liu Wen: responsible for casualties, simple rescue. And assist the hospital ambulance personnel to rescue the injured.

Members: Zheng Yi, Zheng Yongfeng Dong Guobin, Wang Weigang

V. Emergency drill projects

1, fire accident accident report and emergency treatment

2, fire accident occurred when the emergency evacuation of the operating personnel

3, fire accident occurred in the oil depot organization personnel Emergency rescue fire fighting

4, fire equipment fire extinguishing drill

Six, the background of the emergency drill:

The fire accident drill background is as follows:

Oil payment site to pay for the oil operation,

seven, the fire drill program:

Some of the fire drill procedures:

Some of the fire drill procedures:

1, emergency evacuation of personnel

2, fire accidents

3, fire accidents reported to the next level

4, emergency material security

5, emergency rescue fire fighting

6, fire equipment fire extinguishing exercises

7, the drill site summarization

This is the first time that we have seen a fire drill. strong> Eight, the drill detailed steps:

Fire accident report and emergency response:

1) East Transamerica in the receipt of the scene personnel Li Siyu accident report, the first time will be the start of the fire accident emergency response plan, and reported to the Distribution Center Emergency Response Leadership Office.

2) Dong Chuan Chen contacted Zheng Yongfeng to activate the alarm button at the first time. All the staff of the oil depot immediately to the assembly point to gather.

3) The collection of personnel is complete, and each team leader counts the number of people and reports to the commander-in-chief.

4) Dong Chuan Chen asked Zheng Zhongyun as the emergency rescue team leader, leading the team members to the fire scene with fire-fighting equipment to fight the fire. Requirements Liu Zhi for the material protection team leader, leading the team to prepare dry powder fire extinguishers, fire hoses, water guns and other emergency supplies rushed to the scene to do a good job of material protection. Li Qiansheng immediately enter the cut off power, close the valve. Requirement of Liu Dongwu for the vigilance group leader to lead the personnel of the accident area for vigilance, and organizing personnel to divert vehicles.

Emergency evacuation in case of fire:

After receiving the emergency command order, the alert team leader convoy other personnel in accordance with the oil depot emergency escape map and evacuation instruction signs for emergency escape to a safe place.

Fire emergency rescue fire fighting:

After receiving the emergency command order, the emergency rescue team leader Zheng Zhongyun immediately led the team members rushed to the fire scene with fire equipment to fight the fire.

Fire emergency material security:

After receiving the emergency command order, material security team leader Liu Zhi immediately organized the team members to carry dry powder fire extinguishers, fire hoses, water guns and other emergency supplies to the scene to support the emergency rescue work, Li Qiansheng the first time to cut off the power supply, shut down the operating valves, guiding the scene as soon as possible to leave the vehicle, and timely report to the emergency rescue team leader.

Zhao Liang: prepare the camera in advance in the appropriate location for the entire process of filming. Fire accident scene protection and inspection:

After the fire is extinguished, the emergency rescue team leader organizes the protection of the scene, the use of isolation tape to isolate the scene, and filming processing, while inspecting the scene to eliminate fire hazards.

Fire emergency drill site summary:

1, the end of the drill all gathered.

2, East Chuan Chen on the drill site summary.

3, the company's leadership on the drill on-site summary.

Fire extinguishing drill:

1, on-site safety supervision of the fire extinguishing drill to do a good job of safety requirements.

2, personnel fire extinguishing drill.

Eight, fire emergency drill equipment:

Several fire extinguishing equipment, fire hose rolls, water guns, board handles,