In order to implement the "safety first, prevention, comprehensive management" policy, and effectively prevent major and major safety accidents, to avoid and reduce the occurrence of various types of accidents, the implementation of the system of responsibility for production safety, according to national regulations, laws and regulations relating to the management of production safety, the development of the project's production safety objectives.
One, the production safety goals
1, to eliminate serious personal injury, fatal liability accidents, minor injuries and negative injury rate target control at 0.3%;
2, to ensure that Zhengzhou City, safety and civilization standardization site;
3, 100% of the rate of investigation and rectification of hidden security problems;
4, the realization of no major equipment accidents, no major fire accidents, no major traffic accidents, no multiple acute poisoning accidents.
5, create provincial civilized site, provincial quality engineering.
6, conscientiously implement China's construction "production safety management manual" and "construction site safety protection standard atlas", construction site safety protection standardization pass rate of 100%;
7, safety management personnel with a certificate on duty rate of 100%, special operations management personnel with a certificate on duty rate of 100%.
Two, safety production pre-control target measures
1, safety, civilized construction goals
1.1, safety construction goals
Ensure that the construction safety of this project without casualty level accidents; ensure that the project no fire, traffic accidents occurred; ensure that the project construction equipment safety; damage to the ecological environment, and no environmental pollution accidents. Construction site neat and standardized.
1.2, civilized construction goals
Execution of the Henan Provincial Government issued "Interim Provisions on Civilized Construction Management of Construction Projects in Henan Province" and the **** City of civilized construction of construction projects related to the management of the provisions of the construction project off, to achieve the field out of a sample, during construction does not pollute the surrounding environment, does not disturb the people, the right-of-way does not raise dust, the site site standardization.
2, according to the target site to develop the following measures
2.1, safety and civilization education measures
Construction site safety production education and training is the whole production safety education and training, including the project manager department, the team and other aspects of the training, at all levels. Through education to make the whole staff understand the requirements of production safety, to ensure that the safety assurance program can be successfully implemented. The main contents of the training are:
(1), the project manager's safety education content
The project manager's safety education content should include: production safety laws, regulations, systems and safety discipline, explaining the case of safety accidents; the characteristics of the construction tasks undertaken; basic knowledge of construction safety, safety systems and safety regulations for the relevant types of work; the use of machinery, equipment and electrical appliances, and other basic knowledge of safety; fire prevention, prevention and control, and the use of electrical appliances. Basic knowledge of safety; knowledge of fire prevention, poison prevention, explosion prevention, flood prevention, dust prevention, lightning, electric shock prevention, fall prevention, prevention of object strikes, collapse prevention, prevention of mechanical injuries and knowledge of emergency safety rescue; standards for the issuance of safety and protective equipment, and basic knowledge of the use of protective equipment and appliances.
(2) Shift safety education
Shift safety education includes: the characteristics of the work of the team; production safety system and work discipline; safe operating procedures; the correct use of safety devices and personal protective equipment knowledge; the work of the team in the operation of the insecurity and preventive measures, the operating environment and the use of machinery and equipment safety requirements.
2.2, civilized construction management measures
2.2.1, water pollution prevention and control measures
Construction process produces sewage is mainly oil sewage and cleaning sewage, to take effective measures to prevent water pollution. The oily sewage generated in the operation of construction machinery, take measures such as grease trap to deal with it, and it can be discharged to the designated ditch and stream only after it is tested to be in line with the provisions of "Comprehensive Emission Standards for Sewage", and it shall not be discharged in excess of the standard. Sewage generated from the production of the concrete mixing plant shall be filtered and settled before it is discharged into the designated ditches and streams. The mixing plant is constructed with flushable toilets and septic tanks.
2.2.2, Gas Pollution Prevention and Control Measures
(1), develop liquid fuels, actively utilize electricity, solar energy and other clean energy sources, and use electrical equipment for hot water and heating as much as possible. In order to reduce pollution, the project in the production, life, prohibit the use of small boilers, coal furnaces; heating and cooking always use gas and the use of electric energy.
(2), the control of dust pollution, easy to produce dust sand and gravel materials for covering, vehicle passing lanes appropriate sprinkling; channel construction, the use of advanced technology to reduce dust emissions; the use of sealed mixing equipment, set up dust control equipment; to prevent the leakage of dust produced by the mixing of concrete; construction access, concrete mixing station for frequent sprinkling or hardening treatment; production, living area roads to be hardened. According to the overall planning of the construction site, the production and living areas around the appropriate greening and so on.
(3), control of motor vehicle exhaust pollution, the strict implementation of the vehicle elimination scrapping system, the selection of vehicles in line with national health protection standards, strict control of all kinds of motor vehicle emissions, to ensure that the exhaust of motor vehicles traveling on the road fully meet the standards. Construction process by the most serious air pollution is the construction workers, for construction workers, we take protection and labor protection measures to mitigate the hazards.
2.2.3, noise prevention and control measures
Sound radiation has directionality, in the same distance from the source of the same place, due to the source of sound in different directions, the intensity of the noise received is also different, therefore, to control the direction of the propagation of noise (including changing the direction of the emission of the source of sound) is to reduce the noise, especially high-frequency noise is an effective measure. Establishing sound insulation barriers and using sound insulation materials or structures to block the noise propagation according to the situation of the construction site. For noise generated by vibratory rollers, take vibration isolation measures to attenuate the noise. Handle all kinds of relationships with local government and residents, and do not affect residents' normal work and rest due to construction. Limit the transportation machinery to sound the horn without any reason to reduce the noise pollution.
2.2.4 Solid Waste Prevention and Control Measures
Trash cans are set up in the production and living area to store the domestic garbage, which will be transported by garbage trucks to the designated garbage disposal station for treatment. Classify the garbage, divide it into degradable and non-degradable garbage, and then carry out secondary utilization and treatment respectively. Do a good job of slag disposal during the construction process, recycling and processing the waste, trimmings, bags, etc. generated in a timely manner, and transporting the processed waste centrally to the designated garbage dump and incorporating it into the local sanitation management system. Prevent arbitrary piles of waste to reduce the river's flood capacity and affect the residents of normal production and living water.
2.2.5, protection of ecological environment and soil and water conservation measures
Protect the green vegetation of the construction site, the construction work shall not damage the green facilities, and arrange the greening in the warm season. Try to expand the scope of greening, make full use of the existing space, so that the greening arrangement is generalized and hierarchical. Plant dust-resistant trees in the living area and production area, plant flowers, grass, shrubs and turf in the living area, and carry out spray-anchor support and drainage measures for the excavated slopes in time to prevent soil erosion. After the construction is finished (except for the special regulations of the owner), the ecological environment near the construction site should be restored as far as possible.
2.2.6 Measures for construction site treatment
For the dusty road section, sprinkle water frequently to prevent dust. In the Yongdeng high-speed under the section of the construction process, the use of water sprinkling dust control measures, the excavation of the working surface of water spraying, and the diversion of both sides of the set a certain height of publicity boards, to play a dust anti-glare, to ensure that high-speed vehicles travel smoothly.
2.2.7, road cross-transportation nuisance prevention and control measures
During the construction process, no interruption of local traffic. Along the intersection of vehicles and pedestrians need to maintain access, living vehicles, production vehicles and material supply vehicles traveling on the road and the nearby municipal roads inevitably conflict, in order to alleviate the pressure of crossroads road traffic, to take certain measures to set up a unified safety warning signs at intersections, to maintain the construction of warning signs of the illumination, and if necessary, to send people to maintain traffic. Construction right-of-way can not interrupt the local drainage and irrigation systems, communications, electric power facilities.
2.2.8, occupational health and safety measures
(1), to the workers to buy personal accident insurance, to ensure that the workers personal interests.
(2), the organization of employees often carry out health care knowledge education, regular health checkups.
(3), and *** City People's Hospital, *** City Hospital of Traditional Chinese Medicine, etc. to establish a good relationship, where employees need to be transferred to local hospitals for treatment of injuries and illnesses, as far as possible to get the hospital's best medical services.
(4), set up shower room, to ensure that employees have the conditions to take a bath every day.
(5) In case of infectious diseases, we will comply with the relevant national regulations, isolate the patients for treatment and take precautionary measures for other people.
3, the project department safety and civilization construction reward and punishment system
3.1, in order to more effectively grasp the project's safety management, to protect the staff in the production and construction process of safety and health, to prevent all kinds of accidents, to protect the project property from loss, to ensure that the construction of the project according to the, stable, long-cycle operation, to improve the economic benefits, to improve the staff in the construction process of the Safety awareness and motivation, to further expand the popularity of China Construction ***, to protect the qualification and image of the enterprise, has formulated this safety management rewards and punishments provisions.
3.2, establish and improve the safety management network. From the project department to the construction subcontracting unit, from the subcontracting unit to the construction team to establish a top-down safety management network, so that the formation of safety management is someone to grasp, safety work is done in a good atmosphere. The project department, subcontracting units, construction team should gradually set up a full-time and part-time safety officer, to grasp the safety of construction work, to form a personal responsibility for the team, the team is responsible for the subcontracting unit, subcontracting unit is responsible for the Ministry of the project, the Ministry of the project is responsible for the ** the company is responsible for the safety management model. Clarify the responsibility of the project manager as the first person in charge of the safety of the project department to ensure that no major equipment accidents, major personal injury or death accidents, major fire and explosion accidents and major quality accidents occur throughout the year, (for the division of accidents into sizes and types, refer to the division criteria of the Ministry of Labor and Social Security of the People's Republic of China). Strive not to occur in general equipment, quality accidents, young injury rate control within 3 ‰.
3.3, the Ministry of the project in the whole year of engineering and construction work, can according to quality, quantity, on schedule, safe completion of the work of the subcontracting unit, the year did not occur any equipment, personal injury and death, fire and explosion and qualification of various types of accidents and according to the subcontracting unit to complete the year's economic benefits and the difficulty of the construction works, based on the contract and the project's safety awards and penalties system, the subcontracting unit to be rewarded. The project manager shall reward those subcontracting units in charge and project management personnel who have made achievements and contributions to the safety work throughout the year according to the safety reward and punishment system of this project.
3.4, for those subcontracting units in charge, parties and work area in charge of general accidents in the year's project construction work, the loss is more than 0.5 million yuan, less than (equal to) 10,000 yuan (the loss includes medical expenses, damages, and lost wages, the same below) will be all deducted from the bonus, and based on the project's safety rewards and punishments system, awards and penalties.
3.5, the subcontracting unit in the construction work in the year above general accidents, losses greater than 10,000 yuan, less than 50,000 yuan, in addition to all the deduction of the bonus, but also the subcontracting unit responsible for the person in charge, the parties involved, the person in charge of the work area according to the size of the responsibility for this accident to give the total loss of accidents ≤ 10% (cumulative) of the economic penalties. If the loss is more than 50,000 yuan (including 50,000 yuan) and less than 100,000 yuan, in addition to all the deductions of the safety bonus of the work area, the person in charge, the person in charge of the work area will also be given a financial penalty of ≤8% of the total accidental loss (cumulative) according to the size of the responsibility borne by the accident; all the fines will be based on the implementation of the project's safety bonus and penalty system.
3.6, the accident occurred in the construction work throughout the year is more significant, the loss is more serious (loss of more than 100,000 yuan or more), causing a certain impact, damage to the reputation of ****, in addition to all the deduction of the subcontracting unit in charge of the person in charge of the party and the person in charge of the work area of the safety bonuses, but also to the subcontracting unit in charge of the person in charge of the person in charge of the work area of the person in charge of the safety and environmental protection department and the production manager. (Safety Director) according to the size of the responsibility borne by the accident to give financial penalties, all fines are based on the project safety reward and punishment system.
3.7, in the construction work, the person in charge of the work area, the person in charge of the subcontracting unit, do not implement safety measures, against the rules of command, illegal operation, resulting in accidents, in addition to the person in charge of the subcontracting unit and the person in charge of the above economic penalties, according to the size of the accident and the loss of the "Chinese People's Republic of China *** and the State Safety Law" to pursue its criminal responsibility.
3.8. For the subcontracting units and management personnel who have discovered and avoided major safety accidents or hidden dangers, put forward rationalization suggestions, and made special contributions to the safety work during the whole year's construction work, the project department will give special rewards according to the safety reward and punishment system.