How to write a model equipment lease contract

How to write an equipment lease contract? Take a look at the editorial today's share it.

Equipment leasing contract pay attention to the following aspects, the first is the identity of A and B parties, the second is to write the specific content of the contract, the third should be written on both sides of the breach of contract, the fourth to write a specific time.

Practical Equipment Lease Contract 1

Lessor (Party A):

Lessee (Party B):

According to the provisions of the "Chinese People's **** and the State of the Contract Law", the two sides by mutual consensus, on the B side to the Party A to lease the following equipment to reach an agreement:

One, the use of equipment Location and project situation:

II. Overview of leased equipment

Equipment name

Specifications

Quantity (units)

Random personnel (number)

Machinist's aid

Leasing amount

III. Ownership of the equipment:

Ownership of all leased equipment listed in this contract Ownership belongs to the lessor, the lessee of the leased equipment machinery only enjoy the right to use during the lease period, there is no right to sublease the equipment. The lessee shall not mortgage the equipment for any reason, otherwise all the consequences shall be borne by the lessee.

Four, Party A's basic responsibility:

1, to provide good technical type of equipment.

2, the equipment into the construction site of Party B thick, Party A driver to obey the Party B construction management personnel scheduling and command, and to comply with the rules and regulations of Party B construction site.

3. The Party A mechanic should work according to the operation regulations of the equipment.

Fifth, Party B's basic duties:

1. Provide accommodation and food for Party A's mechanics.

2, Party B is responsible for equipment in the construction site care and ensure the safety of equipment and personnel. Party B will be responsible for compensation for any damage or loss of equipment caused by Party B.

3, Party B shall not force Party A to work against the rules or overload.

4, Party B shall check and accept the leased machinery and equipment at the delivery place, and at the same time hand over the signed and stamped machinery leasing receipt to Party A

5, Party B shall carry out safety training for Party A's mechanics entering the construction site.

Sixth, the settlement method and related matters:

1, the lease period: from the month of January to the month of January, the beginning of the calculation of rent. If Party B uses the equipment in advance, the rent will be calculated from the date of use. At the end of the lease period, Party B will hand over the equipment to Party A in good condition, and then go through the exit procedures. If Party B continues to rent need to sign a renewal contract, renewal of less than one month, the rental fee is calculated according to the actual number of days.

2, the settlement method: equipment rental fee calculated on a monthly basis, the first month 38,000 yuan / month, the next month 36,000 yuan / month, the third month 34,000 yuan / month, the fourth month of 30,000 yuan / month, the fifth month of 28,000 yuan / month, the sixth month of 26,000 yuan / month, Party B in the Party to confirm the equipment to the Party to pay the first month of rent 38,000 yuan, and fully pay the deposit of the entry and return freight charges 5,000 yuan for pick-up procedures. The reverse freight deposit will be deducted from the monthly rent at the end of three months of the lease period. Party B shall deliver the next month's rent to Party A five days in advance of each month. If the rent is not paid by the due date, Party A has the right to stop the machine or remove the equipment from the site, and Party B shall bear the loss caused. The equipment is billed on a monthly basis. If the equipment is used for less than one month, it will be settled according to the whole month. More than one month, the exceeding part is calculated by day (yuan/day).

3, the bearing of freight: the equipment's entry costs borne by Party B, the exit costs borne by Party A. The equipment will be returned to Party A if the rental period is less than three months. If the rental period is less than three months, the check-out fee shall be borne by Party B. Party B shall notify Party A within five days before the equipment is checked out.

4. Working hours: the working hours per month shall not exceed 300 hours, and the exceeding part shall be calculated according to 10 hours equivalent to one day for machinery rent and overtime pay of the mechanic.

5, oil supply: Party B is responsible for providing the oil required for the operation of the equipment in the rental period in line with the operating standards, otherwise the downtime caused by the loss of Party B to bear.

6. Equipment Maintenance: Party B shall assist Party A in the maintenance of the equipment, and the maintenance cost to be paid shall be based on the signing of Party A's driver, and the maintenance cost of each unit per month shall be borne by Party A for the part of the maintenance cost exceeding RMB, and the part of the maintenance cost below RMB shall be borne by Party B. Party B shall bear the cost of paver blades, filter elements and other low-value consumables.

7, the equipment due to faults caused by the monthly cumulative cloth more than three days (maintenance of a total of 12 hours equivalent to one day), if more than three days, the number of days in excess of the rental fee will not be counted.

8, equipment rental period, Party B, such as the need to transfer the site construction, must obtain written consent of Party A, and to ensure that Party A equipment at the end of the agreement to return.

Seven, the annexes to this contract is an integral part of this contract, and this contract has the same legal effect. The annexes of this contract include: the schedule of the lease contract, the receipt of the leased machinery, and the supplementary provisions made by both parties through consultation.

VIII. Dispute resolution:

All disputes related to this contract, A and B shall be resolved through friendly consultation in accordance with the Contract Law of the People's Republic of China and other relevant laws. If the consultation fails, it shall be submitted to the Arbitration Committee at the place where Party A is located, and the arbitration award shall be made in accordance with the relevant procedures of arbitration. The arbitration fee and the attorney's fee of the winning party shall be borne by the losing party.

Nine, this contract in two copies, by the A, B and each party to sign a copy. A and B signed and sealed (contract seal) date of entry into force.

Ten, such as this contract is not stamped with a contract chapter, is considered invalid contract.

Party A:

Legal representative:

Attorney-in-fact:

Address:

Tel:

Fax

Accounting bank:

Account number:

Party B:

Legal representative:

Attorney-in-fact:

Address:

Telephone:

Fax:

Account Bank:

Account Number:

Utility Equipment Lease Contract 2

Lessee: (hereinafter referred to as Party B) ___________________________________________________

Lessor: (hereinafter referred to as Party A) ___________________________________________________

Based on the The relevant provisions of the Contract Law, in accordance with the principle of equality and mutual benefit, in order to clarify the rights and obligations of Party A and Party B, by mutual consensus, we hereby sign this contract.

Article 1: Name of the leased machinery: _______________________________________________________

Specifications: _____________________

Model: _____________________

Quantity: _____________________

Location of use: ______________________________________________

Article 2: Party A equips the leased machinery with Operators ___________, whose wages ___________ yuan/month each shall be borne by ______ party, and shall be responsible for arranging the food and accommodation of the operators, whose food and accommodation expenses shall also be borne by ___________ party.

Article 3: Term of Lease

From ________ month of ________ to ________ day of ________ month of ________, if there is a need to continue to rent, the contract should be re-signed within five days before the expiration of this contract.

Article 4: Ownership of leased machinery

1. During the lease period, the ownership of the leased machinery listed in the annex of the contract belongs to Party A. Party B has only the right to use the leased machinery. Party B only has the right to use the leased machinery and has no ownership.

2. During the lease period, Party B must obtain Party A's written consent if Party B improves the leased machinery or adds other things.

3, in the lease period, Party B, such as subletting the leased machinery to a third party, must obtain Party A's written consent.

Article 5: Calculation and Payment of Rent

1. From ________ to ________, the lease expires, Party B will hand over the equipment to Party A in good condition for the exit formalities, and if Party B continues to use it, it should be re-signed within five days before the expiration of this contract. Sign a renewal of the lease contract within five days before the expiration of this contract.

2. During the lease period, in principle, the working hours of each _ shall not exceed 8 hours (equivalent to 1 shift), and the total number of hours per month shall not exceed _____ (the shift time corresponding to the days of rent-free days shall not be counted in the total number of hours), and the part of the work exceeding ______ shall be regarded as overtime work, and overtime leasing fee shall be charged in accordance with the exceeding number of hours of work. The equipment rental fee shall be settled on a monthly basis ________ yuan/month, ______ yuan/hour, if the equipment rental period is less than one month, the rental fee shall be settled by multiplying the actual number of days by 8 hours, and the overtime portion of the overtime work exceeding the working hours shall be charged as an additional overtime fee.

Article VI: Security Deposit

After the negotiation between Party A and Party B, Party A collects Party B's security deposit of ______________ yuan as a guarantee for the fulfillment of this contract. Party B will handle the pick-up procedures after paying the security deposit and the first installment of rent. During the lease period, the security deposit shall not be used to offset the rent. At the end of the lease period, the balance of the deposit shall be returned to Party B after deducting the compensation for defects of the leased machinery payable.

Article 7: Delivery and Acceptance of Leased Machinery

1. The leased machinery shall be delivered to Party B (or its agent) by Party A at the place of delivery. Party A shall not be responsible for any delay in the delivery of leased machinery caused by objective circumstances that cannot be foreseen, avoided or overcome.

2. Party B shall inspect and accept the leased machinery at the delivery place within 24 hours from the time of receipt, and at the same time hand over to Party A the acceptance receipt of the leased machinery after signing and sealing.

3. If Party B fails to handle the acceptance in accordance with the time stipulated in the preceding paragraph, Party A shall consider that the leased machinery has been inspected and accepted by Party B in a complete state, and shall regard Party B as having delivered the acceptance receipt of the leased machinery to Party A.

4. If Party B finds that the model, specification, quantity and technical performance of the leased machinery are inconsistent, defective or flawed during the acceptance which is the responsibility of Party A, Party B shall immediately notify Party A in writing of the above situation on the day of delivery and not later than three days from the date of delivery and Party A shall be responsible for dealing with the situation, or the leased machinery is deemed to be in conformity with the agreed requirements of the Contract and the Annexes.

Article 8: Use, Repair, Maintenance and Expenses of Leased Machinery

1. The leased machinery shall be used by Party B during the lease period. Party B shall be responsible for the daily fuel, repair and maintenance to keep the equipment in good condition, and bear all the costs arising therefrom. Maintenance of a use of accessories __________ yuan below party B is responsible for bearing, in _______ yuan above party A is responsible for bearing.

2, in the process of work, if Party B can not troubleshoot the equipment, should promptly notify Party A for maintenance. Normal maintenance generally does not exceed three days, if more than three days, each day over, Party B should be exempted from the corresponding number of days multiplied by 8 hours rent.

3, leased machinery in the installation, storage, use and other processes, resulting in the third party suffered losses, Party B shall bear full responsibility.

4, leased machinery in the process of installation, storage, use of all the costs incurred in the process, taxes, are borne by Party B.

Article IX: The responsibility of freight of leased machinery

The cost and freight of leased machinery shall be borne by Party A and Party B respectively. The entry fee shall be borne by Party B, and the exit fee shall be borne by Party A.

Article 10: Damage and loss of leased machinery

1. Party B bears the risk of damage (normal wear and tear is excluded) and loss of leased machinery during the lease period.

2. Party B shall immediately notify Party A of the destruction or loss of the leased machinery, and Party A shall have the right to choose one of the following ways, and Party B shall be responsible for handling and bearing all the costs: (1) restoring or repairing the leased machinery to the state of fully functional; (2) replacing parts or accessories with the same type and performance as that of the leased machinery so that it can be used normally; (3) when the leased machinery is destroyed or lost to the extent that it can not be repaired; (4) when the leased machinery is destroyed or lost to the extent that it can not be repaired, Party B shall bear the risks of the destruction or loss of the leased machinery. loss to the extent that it cannot be repaired, Party B shall indemnify Party A.

Article 11: Liability for breach of contract

1. When Party B delays the payment of rent, Party A will stop the machine on the same day, and Party B will be responsible for any loss caused if the machine is continued to be rented after payment.

2, without the written consent of the other party, either party shall not change or terminate this contract in the middle of the day; either party violates the agreement of this contract, shall repay the other party the liquidated damages of ____% of the total rental amount of this contract.

3. If Party B fails to pay the rent on time or violates any of the terms of this contract, Party A has the right to take the following measures:

(1) to require Party B to pay the rent and other expenses in time and to demand that Party B compensates Party A for the losses;

(2) to terminate this contract, to take back or to demand that the leased machinery is returned and to demand that Party B compensates Party A for all the losses.

Article XII: Settlement of Disputes

All disputes arising out of or in connection with the fulfillment of this contract shall be settled by Party A and Party B through amicable negotiation; if the negotiation fails to be resolved, it shall be submitted to ________ Arbitration Commission for arbitration award in accordance with the relevant procedures of arbitration. The cost of arbitration and the attorney's fee of the winning party shall be borne by the losing party.

Article 13: The two parties shall negotiate and settle the outstanding matters separately, and this agreement shall be in four copies, each of which shall be signed and sealed by both parties and shall come into effect after Party A receives Party B's monthly rent or prepayment of deposit.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________Legal representative (signature): _________

_________ year ____ month ____ day _________ year ____ month ____ Day

Utility Equipment Lease Contract 3

Lessor: _______________________

Lessee: _______________________

Date of signing: _______ ____ ____

Signing place: _____________________

Based on the Contract Law and relevant laws and regulations, in order to clarify the rights and obligations of the lessor and the lessee, and following the principles of equality, voluntariness, fairness and good faith, the two parties enter into this contract by consensus on the leasing of the _________ machinery.

I. Name of the project: _____________________________________

II. Place of machinery construction: ____________________________________

III. Model of machinery and technical requirements: ______________________________

Fourth, the use of machinery: _______ months; from ______ _____ _____ from ______ ______ ______ to *** counted _________ days.

Machinery entry time: _________ month _________ day; machinery commissioning time: _________ month _________ day.

V. Rent and Payment

1. Rent and Calculation: Rent _________ yuan/month; actual use of less than a month part of the calculation in accordance with the monthly rental fee ÷ 30 days × the actual number of days of use.

2. Rental payment: The rental fee is calculated monthly. On the 25th of each month, the lessor will issue a statement and invoice for the month's rental fee to the lessee for settlement procedures. The lessee shall pay the lease fee according to the landlord's payment of the project according to _________.

3. Rental concessions: the rental fee shall be calculated on the basis of 10 months when the rental period is 12 months. The rental fee will be calculated at _________ for the expiration of the rental period of _________.

4. Other: __________________________________________.

6. Technical security requirements: _________________________________.

VII. Responsibilities of both parties

(I) Lessee

1. Pay the lessor the rent in time according to the contract.

2. Provide accommodation and food to the lessor's machine operators, the cost of which shall be borne by the lessor.

(2) The lessor

1. will deliver the machinery to the construction site in time according to the lessee's requirements.

2. Responsible for the testing procedures and various management departments of the required documents.

3. Provide machinery-related information.

4. Obeying the command of the lessee and accepting the inspection of the lessee.

5. Be responsible for the repair and maintenance of the machinery and provide 24-hour service to meet the needs of construction.

6. Operators will be on duty with valid certificates.

7. The lessor assumes full responsibility for any mechanical failure caused by the operator of the lessor, and the lessee will be compensated for any loss caused by the lessor.

Eight, other agreed matters

1. The lessor's machinery downtime due to malfunction, should be resumed within four hours of use, if more than four hours but less than one working day, deduction of rent (monthly fee / 30), if a month due to malfunction downtime days add up to more than five working days, deduction of half a month rent, if a month due to malfunction downtime days add up to more than ten working days, deduction of the full month rent. If the cumulative number of days of downtime in a month exceeds five working days, half a month's rent will be deducted.

2. If the lessor fails to enter the construction site on time and fails to provide the machinery according to the quality and quantity, the rent of _________ shall be deducted and penalized.

3. If the lessor's machinery or service fails to meet the lessee's requirements, the lessee has the right to penalize the lessor until the contract is terminated.

4. The two sides have a dispute, can be resolved by negotiation or to the people's court, the two sides agreed that the court of jurisdiction is ________________ court.

5. This contract does not involve the provisions of the two sides can sign a supplementary agreement.

6. This contract shall only come into effect after it is signed by the legal representatives of the enterprises of both the leasing and lesseeing parties and stamped with the special seal of the contract.

7. ____________________________________________.

Lessor (seal): ___________

Legal representative (signature): _______

Lessee (seal): ___________

Legal representative (signature): _______

Utility Equipment Lease Contract 4

Party A:

Party B:

According to the relevant laws and regulations, Party A and Party B have reached the following terms of the lease contract of plant and equipment by friendly consensus for compliance.

Article I of the lease location, area, utility

1.1, party A leased to party B's plant is located in the town lease floor area of square meters, the type of plant for the structure.

1.2, the use of leased property

1, party B leased plant use: production and sales and related production activities.

2. During the lease period, Party B uses the factory building in accordance with the above purposes, and Party A shall not intervene.

Second Lease Term

2.1. The lease term shall be from the day of the month to the day of the month, unless otherwise agreed by both parties, the commencement date of the lease shall be the date of rent.

2.2. If Party B renews the lease at the end of the term, Party B shall apply to Party A within days before the end of the term, and the two parties shall sign a separate lease contract. If Party B does not apply for renewal of the lease before the expiration of the term of the present contract or the two parties fail to reach an agreement on the new lease contract, the present contract will be terminated at the expiration of the term of the present contract.

2.3, the expiration of the lease term of this contract, Party A continues to lease the plant, Party B has the right of priority under the same conditions.

Third Article Plant Lease Plant Machinery and Equipment Costs and Related Matters

3.1, the rental standard is: the cost of production of finished products according to the tonnage/ton.

3.2, the above rental standards, but also includes the rental cost of land use right of the corresponding land occupied by the leased plant. Land use fee, related public **** facilities, machinery and equipment belonging to the ancillary facilities of this contract and fire-fighting equipment, safety facilities.

3.3, the above rent does not include Party B in the leasing of pastoralism during the period of coal, electricity, communication and other kinds of energy communication costs.

3.4. Conditions provided by Party A:

1. Party A provides Party B with one KVA transformer free of charge.

2, the plant belongs to Party A's facilities, equipment, decoration, installations and goods, should be given priority by Party B to select the use of Party B by Party A and Party B **** the same inventory after the issuance of a list, and signed by both parties to confirm, as the validity of this contract, the lease period, the items listed in the annex (hereinafter referred to as ancillary facilities) and the plant is rented out to the use of Party B together.

3, production of sewage and all aspects of environmental protection are Party A is responsible for.

4, in the signing of this contract, party B must be leased plant machinery and equipment for on-site inspection, detailed understanding, both sides confirmed that the leased plant and its equipment for rent subject to the status quo.

5, due to the plant land and other property rights issues arising from the relevant issues, Party A to deal with. If it leads to Party B can not be normal production, Party A should double the return of the month's production tonnage rent.

6, Party A and Party B shall not steal each other's product formula process, and shall not produce the same grade of products with the other party.

Article IV handover of leased property

4.1, the two sides in the handover of leased property and related equipment **** with the inventory inspection and signatures to confirm the delivery of the keys to the plant, the delivery of the standard to the two sides in the contract to determine the status of the leased property shall prevail. The custodial responsibility of the leased property and related facilities and equipment shall be borne by Party B from the date of handover.

4.2 Party A shall clear all Party A's materials in the leased property out of the leased area within days after the signing of the contract.

Article 5 Payment of Expenses

5.1 Payment of Lease Expenses: The rent shall be paid once a month, and the specific payment time shall be the 30th of the end of the month.

5.2, during the lease period, Party B shall bear the costs of coal, electricity, telephone, network and other energy and communication costs incurred by the use of plant facilities and equipment.

Article VI Repair and Maintenance of Housing

6.1 During the lease period, Party A shall be responsible for repairing the damages caused by its own reasons or natural factors to ensure Party B's normal production.

6.2, either party defaults, by both parties to remind in a reasonable period of time still failed to perform to meet the contract agreement of the other party has the right to terminate this contract, and the right to require the other party to compensate for the actual losses suffered as a result of the breach of contract.

Article VII Applicable Law

This contract shall be governed by the laws of the People's Republic of China and the State of China, and any disputes arising out of the fulfillment of this contract shall be resolved through consultation between the two parties, or through arbitration if the consultation fails.

Article VIII Other Terms

8.1 During the lease period, if Party A terminates the contract early and breaches the contract, Party B shall be compensated for double the production cost of the year as well as the workers' wages.

8.2, after the signing of the lease contract, such as changes in the name of the enterprise, can be confirmed by the seal and signature of Party A and Party B, the original terms of the lease contract remains unchanged, and continue to be implemented to the expiration of the contract.

This contract is not exhaustive, after the consensus of both parties, may sign a separate supplementary agreement.

Article IX Effect of Contract

This contract is in one copy, three copies for each party, and the contract will come into effect after it is sealed and signed.

Party A (official seal):

Corporate representative (signature):

Party B (official seal):

Corporate representative (signature):

Identity card:

Address:

Tel:

Identity card:

Address:

Tel:

Signing time: year month day

Practical Equipment Lease Contract 5

Lessor: Industrial and Commercial Bank of China (ICBC) __ City Trust Department (referred to as Party A)

Lessee: ____ (referred to as Party B)

Parties A and B, according to the "Industrial and Commercial Bank of China (ICBC) __ City Trust Department of the equipment leasing business trial measures "the provisions of the equipment leasing contract, and agreed on the following terms, *** with compliance with the implementation.

I. Party A purchased the following equipment from ____ to rent to Party B for use according to the project approved by Party B's superior and the equipment and technical quality standards selected by Party B itself.

1.________________________________

2.________________________________

3.________________________________

4.________________________________

2. Party A delivers the equipment in the quarter of ___ according to the provisions of the equipment ordering contract signed with the production plant (merchant). It is shipped to Party B directly by the supplying unit. Party B directly to the supply unit self-pick-up self-transportation. Party B should immediately after receipt of the equipment receipt back to Party A.

Three, equipment acceptance, installation, commissioning, use, maintenance, repair management, etc., are responsible for by Party B itself. The quality of the equipment by the production plant is responsible for, and in the ordering contract to be explained.

Four, the ownership of the equipment in the lease period belongs to Party A. The equipment shall be used for the purpose of the lease. After receiving the goods, Party B shall take out comprehensive insurance in Party A's name to the local insurance company, and Party B shall be responsible for the insurance premium. Party B shall hand over the insurance contract to Party A as an attachment to this contract.

Fifth, during the lease period, Party B enjoys the right to use the equipment, but may not be transferred or mortgaged as property, without Party A's consent, and may not add or remove any parts of the equipment and relocation of the installation site. Party A has the right to check the use and integrity of the equipment, Party B should provide all the convenience.

Sixth, the equipment leasing period for ____ years, the lease period from the supply factory to Party A when the collection of payment, the total rent of ____ yuan (including the handling fee of ____%), the delivery of ____ period, each period of the lease payment of ____ yuan, by Party A at the end of each period by the end of the period of the collection of Party B. If Party B can not make the commitment on time, it will not be able to pay for the equipment, but will not be able to pay for the equipment, so it is not necessary to pay for the equipment on time. If Party B fails to obligate the rent on time, Party A will add a penalty of three ten thousandths of one percent per day of the total amount of overdue rent.

VII. This contract cannot be canceled once it is signed. If Party B pays the rent in advance and ends the contract, Party A will give back part of the interest concessions.

VIII. At the expiration of this contract, Party A agrees to transfer the ownership of the equipment to Party B at the preferential price of RMB ____.

IX. Party B's superior unit ____ agrees to act as Party B's economic guarantor, responsible for Party B's effective fulfillment of the provisions of the terms and conditions of this contract, such as Party B's inability to bear the economic responsibilities stipulated in the contract within the period of the contract, the guarantor shall pay to Party A the remaining periods of rent and other losses.

X. This contract shall come into effect after being sealed by both parties and Party B's guarantor. The original of this contract shall be two copies, one for Party A and one for Party B. The copy ____ shall be one for Party B's guarantor and one for Party B's account bank.

Party A: Industrial and Commercial Bank of China __ City Trust Department (official seal)

Person in charge: ______ (signature)

Accounting bank and account number: ______

Year and month

Party B: (full name)

------ (official seal)

Person in charge: ______ (signature)

Accounting bank and account number: ______

Year and month

Economic guarantee unit: (full name)

------(official seal)

Person in charge: ______(official seal)

Year and month

Utility equipment leasing contract 6

Lessor: __________________ (hereinafter referred to as Party A)

Lessee: __________________ (hereinafter referred to as Party B)

Based on the relevant provisions of the Contract Law of the People's Republic of China*** and the State of China, Party A and Party B, after full consultation, have reached the following agreement on the matter of leasing Party A's computers by Party B.

I. Party B leases Party A's computer, the computer configuration is detailed in the annex (computer equipment value contract), hereinafter referred to as the leased computer.

Two, the starting time of the lease: ______ year _____ month _____ day, the time to surrender the lease: ______ year _____ month _____ day. On the date of signing the contract, Party B has to pay Party A the computer deposit (capitalized) _________ (¥ ________) and rent (capitalized) _________ (¥ ________). If the lease is renewed, please notify Party A 3 days in advance and re-apply for the lease procedures.

Three, Party A's obligations

1. Party A should be the system debugging computer delivered to the use of Party B, within ten kilometers free of charge to pick up, send the equipment to the door. Journey beyond ten kilometers part of the commitment by Party B at _________ / per kilometer (including pick-up, delivery), accrued in the first month's rent to pay;

2. Lease period, the computer appeared to be a non-human hardware failure, Party A to provide _________ within 24 hours (_________ outside of 48 hours) within the free door-to-door replacement or maintenance services;

3.9:00-18:00, Party A provides free hardware and software technical telephone consulting services;

4. Provide Party B with a free trial of the computer for 1 day. If you are not satisfied, in addition to the transportation costs borne by Party B, the deposit, the rent is returned in full (except Party B damaged hardware).

Four, Party B's rights

1. During the lease period, the computer has a non-human physical failure, Party B has the right to request Party A to repair the computer free of charge within 24 hours after receiving the repair call at ______ (48 hours outside of ______);

2. Party B, during the lease period, you can enjoy the services provided by the Party's preferential terms (eg, discounts, gifts, etc., please pay attention to the company's website _________).

V. Party B's obligations

1. Party B's leased computer and accessories should be properly stored and kept clean. If the accessories are incomplete or damaged (CD-ROM drive can read the test disk can be), the damage to the accessories according to the guaranteed price compensation (guaranteed price see the "Computer Equipment Guarantee Contract")

2. Prohibit Party B will be overclocked computer use. Due to viruses or overclocking and other reasons lead to hardware destruction, damage costs should be compensated by Party B at the guaranteed price;

3. After the expiration of the lease period, Party B should return the computer to Party A in a timely manner. If the computer is not returned, the rent will be calculated as twice of the monthly rent. If the lease is renewed, it is necessary to renew the lease procedures;

4. Party B has not been unauthorized to open the computer accessories seal, or according to the guaranteed value of the computer compensation.

Sixth, breach of contract

.