Investment in a 100 square meters of cold storage cost about how much money

Procurement and construction of 100 square meters of cold storage including the installation of a complete set of equipment, the overall need for how much money? Snow Arts refrigeration construction of cold storage is generally a complete set of cold storage design and installation, from the initial design of the cold storage to the installation of cold storage after-sales service is a one-piece service, so how much money is needed for such a set of cold storage as a whole?

100 square feet of cold storage in accordance with the temperature, building site, divided into rooms, specifications, configuration of these points to distinguish between the cost;

Purchase of 100 square feet of preservation of cold storage cost about 9-12 million;

Purchase of 100 square feet of air-conditioned cold storage cost about 150,000-200,000;

Purchase of 100 square feet of cold storage cost about 120,000-15 million.

This can be seen that the cost of cold storage is not fixed, then you need to provide the appropriate construction parameters, so that the designer can be based on the user's needs for the initial program offer design, preliminary calculation of the offer needs to be provided by the user to provide the size of the cold storage plant (length, width, height), the construction of the cold storage location, the cold storage of the products used to store, how long you intend to store the temperature of the cold storage has no Special requirements, etc.; this information plays a vital role in the calculation of cold storage quotes, any different needs will lead to changes in the overall program, the designer needs to meet the premise of the cold storage installation process, for the user to reduce the cost of investment, to ensure the smooth operation of the later.

Construction of cold storage customers can choose their own cold storage insulation materials, such as thickened insulation board, stainless steel plate surface, flame retardant grade higher plate, the compressor unit can choose imported equipment and domestic equipment, imported equipment, investment is greater, but the later operation is more stable, and the evaporator can choose the row of tubes and air-cooled, low-temperature storage choose more rows of tubes, but the air-cooled investment is smaller and the degree of smooth operation is also There is no difference.