2021 on the water and power outage emergency plan (selected 5)
In daily life or work and study, sometimes there will be emergencies, in order to avoid causing major losses and hazards, and often have to carry out in advance the preparation of emergency plans. Then how to prepare an emergency plan is appropriate? The following is my collection of 2021 on water and power outages emergency plan (selected 5), I hope to help you.
Emergency plan on water and power outages1
I. Guiding ideology:
The supply of water and electricity is the guarantee that the Department of Accommodation provides normal life and activities for students. In order to prevent sudden water and power outages, to ensure that the Department of Accommodation in the case of water and power outages can take timely and effective emergency measures, to face the water and power outages in the event of a calm, so that the Department of Accommodation normal, orderly work.
Second, the emergency organization:
by the principal, the director of the political education department, the director of the accommodation department, living teacher composition
Third, emergency measures:
(a) predictability of the water power outage
1, daytime power outage, does not affect the student use, after the delivery of electricity, the power supply, the power supply is not affected. The use of students, after the delivery of electricity in a timely manner to check each floor lighting electricity back to normal, found that the problem is timely excluded.
2, evening blackout, the usual ready emergency flashlight full of electricity, organized by the teachers on the evening study students escorted back to the accommodation department in an orderly manner, and then sent to the dormitory by the living teacher, into the dormitory, the students are not allowed to go downstairs after going out.
3, in the power outage before the boiling water, remind the students to their respective water bottles full of boiling water, do a good job in preparation for the water outage with a basin to store water.
4, life teacher will solar water tanks full of water, evening wash water by manual solar system water supply.
5, strengthen the personnel patrol, to eliminate any form of open flame appears.
(B) sudden water and power outages
1, to the competent leadership to understand the situation and then explain the situation to the students, publicize water conservation.
2, the use of solar energy system to provide students with washing water at regular intervals.
3. If the water supply is suspended for more than 24 hours, large bottles of pure water will be purchased and distributed to students for drinking.
4. If the water supply is cut off for more than 36 hours, the fire department will be contacted to ask for assistance, but the students will be provided with daily drinking water supply.
5, the accommodation department of the high ground, the daily water supply must be pressurized pump work to ensure that the normal student water, therefore, when informed of the power outage notice must be ready to stop water.
6, evening self-study before the blackout, students will rest in the accommodation department, increase part of the teacher to strengthen the management, each floor a remote emergency lights.
7, the evening study period blackout, in determining a longer time to stop, under the command of the duty leader, students from the classroom teacher escort, safe and orderly return to the accommodation department, by the life of the teacher to arrange for the students back to the dormitory.
8, students go to bed when the power outage, the building emergency lights automatically start to strengthen the personnel patrol.
Emergency plan on water and power outage 2
In order to effectively protect the safety of teachers and students of the whole school, effective emergency treatment of the whole school may occur sudden power outage phenomenon, to prevent accidents due to water and power outages, according to the spirit of the relevant documents of the competent authorities, the school decided to study the development of water and power outage emergency plan.
Safety Leadership Team
Leader:
Deputy Leader:
Members: class teachers and logistics personnel.
First, the main responsibilities:
timely understanding of the information about the water and power outages, grasp the school to prevent sudden water and power outages of the configuration of the equipment, and according to the school's actual preventive countermeasures and measures to strengthen the school teachers and students safety education, improve the teachers and students protective awareness and ability.
Second, the work measures:
1, strengthen the school safety education and publicity work, make full use of bulletin boards, blackboards, campus broadcasting and other publicity positions, through the theme of the class meeting, the radio station, and other forms of teachers and students of the whole school for the prevention of water and power outages occurred in the form of publicity, education and training of preventive knowledge, once a water and power outages occurred Students do not panic.
2, strengthen the prevention of water and power outages facilities overhaul and installation, the school according to the actual situation to invest in funding, installation of some relevant. Prevention of sudden water and power outages equipment, such as: in the dormitory building, teaching building stairs should have emergency lights, safety exit signs, to ensure that the stairs are smooth and guardrail firm, water and power outages occur when the class teacher, classroom teachers to organize the safe evacuation of students.
Third, the report and response:
1, prior notice of the water, power outages, in contact with the offices of the premise of explaining the situation, notify all teachers and students to do a good job of water, power outages before the preparation.
2, not received prior notice of temporary water and power outages:
(1) administrative staff on duty should immediately report the situation to the water and power outage security leading group, the leading group to arrange the relevant work.
(2) members of the leading group should immediately notify the important functions by phone, such as: notify the cafeteria to arrange for meals and temporary lighting appliances, notify the Education Department to arrange for classroom teachers and teachers in the aisles of each building, stairs to maintain order.
(3) The General Affairs Office is responsible for organizing water and electricity maintenance personnel to identify the causes of water and electricity outages and timely contact and coordination with the local water and electricity departments, as soon as possible to remove the fault.
3, the evening self-study period of water and electricity outages:
(1) the school duty personnel should be on duty in time to notify the duty electrician and maintenance personnel by phone.
(2) After the occurrence of water and power outages, teachers on duty should immediately go to the designated floor to organize students into the classroom to maintain order, organized and planned evacuation.
An emergency plan for water and power outages3 A sudden water outage 1, the duty engineering staff received a notice of water outage by the tenants or merchants, they must immediately rushed to the scene of the outage to understand the scope of the outage in detail and the related outage situation. 2, on-duty engineering staff immediately to the main gate of the suspended lot to check the valve, if the valve is closed, timely understanding of the reasons for valve closure, to confirm that can be opened, open the valve to restore water supply. 3, if the lot of the total valve is not closed, in time to contact the water company to understand the specific reasons for the suspension of water. 4, if the water supply is caused by the water pumping equipment, the following treatment: (1) If the valve is closed to cause water supply, immediately understand the reasons for the valve closure, and take effective measures to restore water supply in a timely manner. (2) If the water pump shutdown caused by water, immediately find the cause of the shutdown, and take effective measures to repair or replace parts, and timely restoration of water supply. (3) such as municipal pipe network caused by water outage, immediately check whether the municipal pipeline inlet valve failure or contact the water company to understand the cause of water outage, the resumption of water supply time. Timely cooperation with the service center to do a good job of explaining the relevant work to the owners. Two, sudden power outage emergency treatment 1, high-voltage ring cabinet sudden power outage (1) engineering duty personnel should contact the high-voltage lines of the power supply department in a timely manner, in order to ascertain the cause of the failure before any operation is strictly prohibited. (2) If the point of failure is not in the jurisdiction, it is estimated that the troubleshooting time is long, the high-voltage operators of the power supply department can be transferred to another high-voltage power supply line (if any), and prohibited to combine the switch hanging "no closing" signage. (3) After the fault is removed, the power supply department operator to restore the original power supply line. 2, distribution room circuit breaker tripping blackout (1) engineering duty personnel received a blackout notice, immediately rushed to the blackout site, the circuit breaker will be under the branch load switch disconnect, the circuit breaker tripped hanging "line maintenance, forbidden to close" signage. (2) With the shaking table to detect the branch line. (3) After the fault line is identified, close the other lines to restore power. (4) the existence of problems in the branch switch hanging "line maintenance, prohibited closing" signboard, the line further maintenance, troubleshooting, restoration of power supply. 3, the owner of the room tripped (1) duty engineering staff received a blackout notice, immediately rushed to the scene of the blackout, inspection and maintenance, should understand the owner of the meter tripped before the use of other electrical appliances, in order to quickly find the point of failure. 2) If the fault is the household main switch, immediately turn off the main switch and other sub-circuit air switch, and then open the main switch. (3) If the main switch does not jump, and then send the sub-switch, such as a sub-switch can not be sent on, that is, the line for segmentation testing, until the troubleshooting and restoration of power supply. Medical safety is the center and focus of the hospital's medical work, water, electricity and other support systems are the key links to ensure medical safety, in order to ensure medical safety, to deal with emergencies, according to the Municipal Bureau of Health, "Year of Safety Production" activities, combined with the actual situation of our hospital, has developed this plan. The program has been designed to meet the requirements of the city's health bureau. 1, organizational leadership (1) in order to strengthen the power outage, water outage emergency emergency response leadership, the establishment of the hospital power outage, water outage and other emergencies, emergency response leadership group, to determine the management of logistics dean for the commander-in-chief, responsible for the power outage, water outage emergency overall command work. The commander-in-chief in the power outage, water outage occurs when not in the hospital, the commander-in-chief by the deputy commander. (2) the general duty for the power outage, water outage deputy commander, under the leadership of the commander-in-chief is responsible for the scene of the specific rescue work; the departments responsible for the scene command. (3) the general director, deputy director and site commanders should be in the first time after receiving the power outage, water outage to the scene. 2, power outages, water outages and other emergencies to prevent (1) equipped with dual-channel power supply: if one of the sudden power outages, immediately activate the other. (2) Key section equipment equipped with UPS, in case of sudden power failure caused by equipment failure or loss of documents. (3) The ward is equipped with emergency lights on all floors to ensure the safety of the pedestrian channel after a sudden power failure. (4) Self-provided generator sets, operating rooms, MICU, NICU, emergency room and other key departments dedicated line delivery to ensure power supply. 3, power outages, water outages, gas outages and other emergencies in the reporting process (1) the occurrence of power outages, water outages, the relevant personnel immediately to the duty of the plumber to report. The electrician and plumber on duty should immediately rush to the scene after receiving the report to deal with it. In the event of a power outage or water outage that may last more than five minutes or more, the person on duty should immediately report to the deputy commander. (2) Upon receipt of the report, the deputy commanding officer shall immediately rush to the relevant location to assist in processing. For power and water outages that are likely to last more than 15 minutes, report to the commander-in-chief. (3) emergency, ward, operating room, laboratory, radiology, functional department, computer center and other key departments without power, water, the duty officer should immediately report to the section chief. The chief of the department shall immediately rush to the department after receiving the report to prevent accidents of critically ill patients. If a critical patient is being rescued, it should be immediately reported to the medical department or deputy commanders, the medical department, upon receipt of the report, should immediately rushed to the scene, organize the whole hospital forces to rescue, and at the same time to the commander-in-chief report. (4) deputy commanders, after receiving the report, should be timely understanding of the situation, to study the treatment of malignant power and water outages to the commander-in-chief. 4, power outages, water outages, gas outages treatment (1) basic management 1, the main section should be assembled with emergency lights, the key section should be assembled with water storage. 2, the person in charge of each section should regularly check the electric circuit, water circuit, and investigate potential safety hazards. Problems found, timely report to the deputy commander, timely maintenance. To regularly check each section of the rescue equipment, such as cardiac monitors, electrocardiographs, defibrillators and other equipment in has been charged state. 3, the infrastructure office should regularly organize electricians and plumbers to overhaul and maintain the circuits, waterways and airways of the hospital. 4, in the event of power outages, water outages and other emergencies, the departments should be reported in a timely manner in accordance with the procedures and actively dealt with. (2) implementation of the responsibility 1, medical staff After the occurrence of power outages, water outages and other emergencies. Should immediately report to the duty electrician, plumber, if the ward has a critical patient should also immediately report to the department head and general duty. Do a good job of explaining the patients and their families to eliminate the panic of the patients. 2, clinical departments Clinical departments in charge of the report, should immediately rushed to the department to strengthen the monitoring of critically ill patients. If you encounter a critical patient resuscitation, you should immediately report to the medical department. Sudden power outage during surgery, medical staff should immediately report to the head of the department, the head of the department should immediately rushed to the scene to organize the treatment and report to the Medical Section. The use of emergency lighting, proper disposal, waiting for an incoming call, emergency surgery, if necessary, ask the deputy director to transfer to the hospital for treatment. 3, medical and technical departments In the event of a power outage, emergency biochemical, routine testing projects by the Laboratory Department to send specimens to other hospitals for examination. Emergency radiology, ultrasound and other imaging examinations by the department of patients will be transferred to other hospitals for examination. The medical department in the premise of ensuring medical safety, should protect the safety of equipment, according to operating procedures in a timely manner to do a good job of protecting the equipment. 4, infrastructure office A, regular organization of electricians, plumbers, business training to improve emergency response capabilities. B, in the hospital's various wards of the rescue room, medical area of the stairs, channel assembly emergency lights and fire hydrants. C. Regularly organize safety inspections of electricity and waterways, investigate potential safety hazards, and find timely maintenance. D, in the event of a power outage, water outage report, to organize personnel to the scene, and immediately carry out maintenance and processing. For the possibility of power outage, water outage more than 15 minutes or more, to report to the deputy commander. When the water stops, you should immediately turn off the faucet of the non-focused parts, notify the key sections to strictly control the use of water, and according to the situation, actively organize manpower and material resources to nearby water sources that meet the edible standard to get water. E, power outages, water outages and other emergencies leading group, organizing and leading the hospital power outages, water outages and other emergencies, coordinating with sister hospitals, power supply, water supply and other departments to determine the occurrence of power outages, water outages and other emergencies in the handling of the principles and procedures, when necessary, to the higher authorities and the government to request instructions and reports. 5, the occurrence of power outages, water outages, gas outages and other emergencies accountability and reward. (1) the hospital emergency response leading group of the hospital serious power outages, water outages and other emergencies to investigate the occurrence of power outages, water outages and other emergencies in the occurrence of ineffective handling of the responsible person, based on the degree of responsibility in accordance with the relevant provisions of the relevant provisions of the higher level and the "hospital assessment rules," and other relevant provisions of the corresponding penalties. (2) on the timely detection and take positive measures to avoid or mitigate the consequences of damage due to power outages, water outages and other emergencies to reward the personnel. Contingency plan on water and power outages5 I. Purpose: In order to better cope with the sudden entry of the water and power failure, to avoid unnecessary losses and the development of the program. Scope of application: All staff of the Department of Radiology. Third, the standard: (a) blackout failure 1, the occurrence of a variety of accidental power outages, immediately inform the current is receiving the examination of the patient, the use of flashlights, emergency lights, and other emergency facilities, to ensure that the current is the examination of the patient's safety and the evacuation of the patient to do a good job to pacify the patient, The work of the explanation. 2, immediately shut down all types of electrical equipment power, and at the same time, telephone to inform the duty personnel of the water and electricity group on duty, to understand the reasons for the power outage and the duration of the power outage. 3, according to the possible duration of the power outage, properly do a good job of waiting for the examination of the patient's placement. 4, timely report to the head of the department, and do a good job related to shift work. 5, to confirm that the power supply is back to normal, after the voltage is stabilized, according to the operating procedures to restore the power supply of all normal operation equipment. 6, found due to sudden power outages caused by equipment failure, timely notification of the Equipment Division and the Medical Engineering Department, and report to the section head. (2) temporary power outage emergency procedures (1) there is a temporary power outage, you should immediately ask the water and electricity group by phone, ask the reason for the power outage and the duration of the outage. (2) Notify the head of the emergency team or the general duty to explain the situation. (3) If the power outage is short (within 5 minutes), the patient should be informed to wait patiently for the electricity to come before turning on the equipment. (4) If the power outage time is longer (more than 5 minutes), after the start of the backup generator, to ensure that the hospital's power supply; all large equipment in the department need to wait for the normal power supply before the normal operation of the boot. (5) Do a good job of backup second power, self-power generation of operating records. (6) hospital internal reasons for power outages, to identify the cause of the power outage, high-voltage circuits or low-voltage circuits. If the high-voltage circuit failure, should be timely with the power supply department repair class contact, as soon as possible to restore, to ensure that electricity; if the hospital low voltage circuit failure, should quickly identify the cause, in accordance with the operating regulations to restore the circuit. (C) water failure 1, the occurrence of a water shortage, the emergency work in a timely manner, timely closure of all the water boilers in the department of power, to avoid the water boiler due to a water shortage caused by the burned out. 2, immediately inform the duty of the water and electricity group on duty by phone, to understand the reason for the water outage. 3, store a good amount of water for hand washing. 4, when the return to normal water, you need to check the faucet in the section to prevent water overflow and waste caused by the empty open during the water outage.