Radiological diagnosis and treatment license process

Legal analysis: 1, data quasi-stage: the General Affairs Section to provide design drawings, construction programs. The relevant departments to provide the operator list, induction card, radiation personnel work permit. Equipment Section to provide equipment parameters, equipment acquisition demonstration.

2, commissioned by the Occupational Disease Control Institute (or third-party qualified companies) to prepare "radiotherapy construction project occupational hazards of radiation protection pre-assessment report form" (time effect: 25 working days after the information is complete to issue a report)

3, the report form out of the equipment section to prepare information to the Commission on Health and Human Rights to apply for the "construction of occupational hazards of radiological protection assessment of construction projects report form" (time effect) 20 working days) need to cooperate with the General Affairs Section, equipment use section to prepare information.

Legal basis: "Radiotherapy Regulations" Article XVII "Radiotherapy License" and "medical institutions license" at the same time the verification, the application for verification should be submitted to the current cycle of radiotherapy equipment performance and radiation workplace test reports, radiotherapy staff health monitoring information and work carried out in the report.