Equipment Fabrication
Bidding Document
Bidder:**Machinery Company Limited
September 8, 2010
Table of Contents
Chapter I. Preliminary Attachment
Chapter II. Project Overview and Bidding Segment Classification
Chapter III. Bidding Instructions
I. Composition of bidding documents:
II. Qualification Requirements for Bidders
III. Tender return documents
IV. Quotation
V. Description of quality and technical requirements
VI. Tender fee
VII. Submission of tender documents
VIII. Bid Opening and Evaluation
Chapter IV Technical Standards
Chapter V List Price
Chapter VI After-sales Service Commitment
Chapter VII Quality Warranty
Chapter VIII Bidding Documents (Format)
One: Bidding Documents
One: Certificate of Qualification of the Legal Representative
Three: Authorization Letter
4. Planned production date and installation schedule
5. Layout of temporary facilities and temporary land use table
6. Summary of quotations for equipment spare parts
7. Unit price analysis table
8. Company profile
9. Similar projects in the last three years
9. Chapter IX Drawings
Chapter I. p>
1. Equipment Bidding Overview
Project Name: ***** Machinery Co. Ltd **Equipment Fabrication and Installation.
Bidding location: **Company large conference room.
Contracting method: unless otherwise specified package, fixed price.
Required quality standard: excellent.
Required duration: 60 days, the specific date will be notified by the bidding equipment factory.
Payment: Payment for equipment according to **, each application for payment for equipment shall be made by the contractor to the bidding company, equipment user to submit a written application for approval by the equipment user, where no payment for equipment will be made without the approval of the equipment user. Payment for equipment stops at 85% of the total contract price, pending settlement (if any). Equipment all production and installation is completed, acceptance, final settlement is completed, paid to 95% of the final value of the project. Warranty: 5% of the total contract price. Other notes: after the warranty period, no quality problem, pay the whole amount without interest. The tender allows bidders to have other favorable payment terms.
Funding source: self-financing
2. Bidding method: invitational bidding
3. Bid validity period: 30 days
4. Bid issuance time: 8:00~11:00 13:00~16:00 on September 8, 2010
Venue: **** Machinery Company Limited **Project Dept.
Contact person: *** Tel: 13*********
E-mail: ********@126.com
5. Q&A: All bidders should submit their questions to the equipment user by email, and the user will provide uniform answers to the queries raised. Bidders can visit the site for survey, but must make an appointment 1 day in advance for arrangement.
6. Bidding deadline and opening time: 9:00 on October 10, 2011
7. Bidding and opening place: **** Machinery Co., Ltd
Address: **City Century Plaza
8. Bid evaluation method: Comprehensive evaluation and reasonable valuation method
9. Warranty period: two years
10. Tendering Information fee: the bidding information fee of 500 yuan, non-refundable, bidding drawings issued in electronic form;
11. Bid security: before the opening of the bidding need to submit a bid security of 10,000 yuan by check (not to fill in the date).
Chapter II Project Overview and Bid Segmentation
This equipment is **Mechanical Co., Ltd. development of self-use equipment, the overall installation of the tender. Equipment in the form of: fully automatic, **, **, a bidding section.
Change Description: 1) All the inlet to cancel the door cover. 2) Outlet to be considered not to affect the user's other facilities installation.
Chapter III Instructions for Bidding
I. Composition of bidding documents:
Equipment overview Instructions for bidding Description of equipment quotation list and quotation list Bidding document (format) Commitment for quality assurance (format) Commitment for after-sales service (format) Catalog of bidding drawings3.1 Bidders shall carefully check and count whether the electronic version of the bidding documents and drawings received is complete or not. and confirm them by e-mail. If there is any omission or ambiguity, the Bidder must notify the Developer by email (and confirm by phone) within three calendar days after the issuance of the tender to request for an explanation or additional documents, and the Developer will reply;
3.2 Interpretation of the Tender Documents: the documents composing this Tender Document shall be interpreted by each other, and if there is any ambiguity or contradiction, the provisions of the Contract shall prevail, and the Bidder must inform the User of any modification of the Tender Documents if the Bidder makes any changes to the Tender Document. If the Bidder makes any modification to this Bidding Document, it must give a written explanation to the User Merchant; otherwise, the User Merchant will consider that the Bidder has fully accepted all the terms of the Contract Document and will not make any modification. Clarifications, modifications, additions, etc. to the bidding documents shall be based on the contents specified in writing or by e-mail. When the contents of the documents are expressed inconsistently, the last document issued shall prevail.
II. Qualification Requirements of the Bidder
3.3 Qualification of professional * level and above for equipment fabrication; must have ** product production license and profile product qualification certificate; authorized manufacturer must provide manufacturer's authorization letter; with a safety production license
3.4 Bidder must be legally and financially independent * level legal person enterprise, with the corresponding manufacturing qualification, at the time of bidding. The following information should be submitted:
A copy of the bidder's business license, production license, ** certificate, etc.; The scale of the enterprise, information about the performance of the project in the past two years.3.5 The bidder shall have the experience of undertaking similar project management, and provide the corresponding supporting information.
Three. Bidding documents
3.6 bidders should submit the following documents in the bidding:
bid (the winning unit needs to be submitted after the winning CD-ROM); quotation list summary table and quotation details, unit price analysis table, equipment configuration list; equipment payment; quality management system, data management system and after-sales service organizations and related systems and regulations; quality assurance certificate and after-sales service; quality management system, data management system and after-sales service organizations and related system regulations; quality assurance certificate and after-sales service; quality assurance certificate and after-sales service; quality assurance certificate and after-sales service. p> Quality guarantee and after-sales service commitment; related instructions; equipment production, installation technology and management manual; other relevant documents required by the bidding documents;3.7 Bidder signed the tender, quotation summary and quotation details, authorization and other documents must be signed by the legal representative, stamped with the official seal and date, the return of each bidding documents must be be provided in hard copy (except for photocopy of the original), otherwise they will not be accepted.
3.8 Bidders shall read this tender document carefully, provide bidding documents in accordance with the requirements of the tender document, and ensure the authenticity of the information provided, and its bidding to the tender to make a substantial response, otherwise, the bid will be rejected.
IV. Quotation
3.9 Bidders according to the equipment manufacturing costs, characteristics, manufacturing period, combined with the requirements of this tender document, in accordance with the production of quotations for the list of instructions and the list of requirements for the various specifications of the spare parts offer, the bidder declared the equipment should include a comprehensive unit price to meet the conditions of manufacture, the terms of the contract, the manufacturing specifications, quality acceptance standards, should have been included in the contractors to bear the responsibilities and the contract performance process may occur. Contract performance may occur in the process of risk and related costs, the bidder's offer, the user will be considered the bidder has all clear and understand the intent of this tender and has considered the risks, and according to the contract requirements to complete the scope of the contract content of all the costs, will constitute an integral part of the contract documents, but also as an important basis for the evaluation of bids.
V. Quality, technical requirements description
3.10 This equipment selection of *** material, see the secondary design details and instructions, and make an offer (see the list of offers description and list format).
3.11 steel selection in line with the "**** Application of Technical Regulations" (JG***-20**) requirements, the ** performance is not less than the "**** performance classification and its testing methods" GB** ** level; its ** is not less than the "*** performance classification and its testing methods" GB*** * level. Equipment glass selection ** glass, glass thickness shall be carried out by the bidder in accordance with the design drawings *** calculation design, anti-heat explosion design, structural design.
3.12 Selection of fittings: the equipment steel material selection ** products, selection of ** supporting parts and accessories.
3.13 The secondary design of the equipment by the user to provide detailed drawings, the bidder in the bidding according to the user to provide the equipment table (for reference only), equipment type and separation of the map for quotation. The ** dimensions given in the drawings are for the bidder's reference only and shall prevail in practice. Once the bid is awarded, the user-vendor will not modify the total contract price due to minor dimensional adjustments.
3.14 The quality standards for the production and processing of this equipment, installation and other quality standards shall comply with the current national acceptance standards, specifically by the bidder in accordance with the detailed description of the project, and as the basis for bid evaluation.
VI. Bidding costs
3.15 The bidder shall bear all the costs of bid preparation and other costs at the stage of submission, regardless of the outcome of the bid, the user will not be liable for any of the above costs incurred, the bidding documents will not be returned;
3.16 Bidders before the opening of the bidding, the bidder shall pay a bid bond of 10,000 yuan (open-ended cheque), which is returned to the winning unit (not the bidder) as the amount of the deposit in the finalization of the bid within one week. The deposit will be returned to the winning bidder within one week after the finalization of the bid (without interest); the deposit of the winning bidder will not be refunded for the time being, and will be returned without interest after the signing of the contract. If the bidder fails to submit the bidding documents on time or withdraws from the bidding or gives up the qualification of winning the bid after winning the bidding, etc., the developer has the right not to refund the deposit;
3.17 The bidding document information fee is 500 yuan, and electronic version of the drawings will be provided.
VII. Submission of tender documents
3.18 The tender documents and all kinds of correspondence are in Chinese, and the currencies involved in the tender documents are RMB;
3.19 The tender documents shall be submitted in four copies in one form, one original and three copies, and shall be marked with the "original", "copy ", the original and the copies of inconsistencies, the original shall prevail, and provide the corresponding electronic version of a CD-ROM.
3.20 The bidder will return to the bidding should be submitted to all the documents stamped with the official seal of the bidder and the signature of the legal representative in a sealed bag (the original and vice to be bagged separately, and indicate the words) on October 10, 2010, before 9:00, dropped off at the ** City ******, ** Machinery Co., Ltd. **** Project Department of the second floor conference room, the late will not be accepted;
3.21 After the opening of the bid, such as the purchaser found unclear, will be the bidder inquiry, the bidder should be actively responded to, and the use of commercial businessmen to make a written response to the questions raised, but can not change the content of the bid and willing;
3.22 This bidding deadline can not be changed after the bidding documents.
VIII. Opening and Evaluation of Bids
3.23 Opening of Bids:
1) With the presence of the legal representative or authorized representative of the bidder, the User organizes the relevant personnel to hold a bid opening meeting at the time and place specified in the bidding documents, and the representatives of the bidders who take part in the opening of bids shall report by signature to certify that they are present at the opening of bids.
2) bid opening, the bidder to check the sealing of the tender documents to confirm that there is no error after the unsealing of the singing, singing the original "tender" content and record.
3) The bidder's legal representative or authorized representative did not attend the bid opening meeting is deemed to be automatically waived.
3.24 Evaluation of bids: the opening contractor will be based on the characteristics of the bidding project to form a bid evaluation committee, whose members are composed of experts from the relevant parties, users, ** the company's relevant representatives. According to the quotation of each bidding unit, **qualification, **capability, performance and other comprehensive evaluation. If the bid is accepted by the user, the user will notify the bidder in the form of a "notice of award", and the bidder will not be notified; see the appendix for details of the "comprehensive evaluation of the reasonable low bid evaluation method".
3.25 The Tender Evaluation Committee may reject all bids and the User reserves the right to re-tender without any explanation to the unsuccessful bidder. And no obligation to explain the reasons for winning or losing the bid;
3.26 Principle of winning the bid: Substantial response to and compliance with the requirements of the contents of this bid evaluation, with a reasonably low price as the principle of winning the bid; the use of the merchant can not guarantee that the lowest bidder for the winning unit;
3.27 Once the bid has been accepted by the purchaser, the bidder shall be in accordance with the provisions of the notification of the purchaser's award, the two sides to sign a contract (the contract) The cost of filing and witnessing shall be borne by the successful bidder) and start the production within the specified date; if the successful bidder postpones the contract without any reason or unreasonable extension, the user vendor shall have the right to waive the qualification of the successful bidder, and the bidding deposit shall not be refunded;
Chapter IV Technical Standards
I. Steel
1. Steel physical and mechanical properties and dimensional accuracy should be in line with the current national standards GB/T *** "*******", the standard is not lower than ***** products.
2. For equipment steel material visible surface minimum measured wall thickness is not less than **mm; for ** door, its steel material visible surface minimum measured wall thickness should not be less than *mm; ** steel visible surface minimum measured wall thickness should not be less than **mm.
II. Gear
1. Gear selection should be in accordance with the "**** Technical Regulations" (JG***) and "****" Development and Reform Run (**) ** No. and the relevant provisions of the local authorities.
2. 3.,......
Three. Accessories
1. Accessories are selected *** as standard.
......
IV. Sealing materials
1. *** seals are required to use *** seals, and in line with the current national standards "****" (GB/****), "**** material regulations" (GB/***).
......
V. ***
1. *** should be in line with the "****" JG/T **** regulations. The use of not less than GB/T *** provisions of the mechanical properties of Q235 steel strip Q235 steel (* level), hot dip zinc anti-corrosion treatment, corrosion resistance should reach ** h * level.
......
VI. Fixing nails
1. All fixing nails in *** fixing nails are used ** self-tapping nails, one-time tapping connection. All other nails are stainless steel double wire self-tapping nails.
......
VII. Bearings
1. All bearings shall be selected from **produced** bearings or imported bearings of the same quality standard and in accordance with "******"
......
Chapter V. List Quotation
Quotation List Explanation:
1. This bidding adopts the list of quantity The form of quotation, which is mainly based on the equipment configuration standards, material standards, secondary design drawings, national construction norms, acceptance standards, combined with the actual situation of the equipment to the equipment to the temporary amount to standardize the scope of contracting, so that bidders can make offers on the basis of a unified standard.
2. The offer list is divided into **** offer summary table, unit price analysis table, according to the specified format.
3. The *quantity provided by the user of this tender is for reference only and is to be calculated by the bidders themselves. If the quotation is based on the *quantity provided by the user, the bidder bears the risk of quotation due to miscalculation.
4. The comprehensive unit price quoted in this quotation includes, but is not limited to, all costs incurred for various materials, transportation, production, installation, machinery, and various management fees, profits, taxes, etc., and also includes technical measures, quality assurance measures, manufacturing organization measures, measures for protection of finished products, coordination costs, and requirements in line with construction specifications, etc., that are not stated or labeled in the design drawings. Costs.
5. If in the process of contract fulfillment, the bidding price of materials is significantly higher (more than 10%) than the current market price, the user has the right to replace the low price, and to give the contact form to determine the replacement price as the basis for the final settlement.
6. This comprehensive unit price analysis table of equipment consists of material costs, material losses, production and processing costs, transportation costs, site installation costs, comprehensive rates.
1) material cost: refers to the completion of the equipment used in various materials;
2) material loss rate: refers to the completion of the equipment in the transportation, production and processing of materials in the process of installation loss accounted for the proportion of the material cost;
3) production and processing costs: refers to the completion of the equipment in the processing and production of the cost of all costs incurred, including, but not limited to, the sum of the costs of **** processing assembly, ***** the sum of all costs;
4) transportation costs: refers to the equipment semi-finished products, materials transported to the site and carried to the installation location of the sum of the costs incurred.
5) installation costs: refers to the equipment and semi-finished products and a combination of materials transported to the site according to the design drawings of the part of the installation and in line with the requirements of the corresponding national norms and acceptance standards and through the use of the business, ** unit acceptance to meet the standards of the contract and the cost of each item.
6) Comprehensive rate refers to the rate of each spare part to achieve the contract conditions directly occurring in all materials, production and processing, transportation, installation costs other than the sum of the costs, including but not limited to, * fees and fees payable to the relevant government departments of the various fees, taxes, risks, finished product protection, maintenance and repair and other after-sales service costs, is the nature of the lump-sum. No adjustment will be made after the successful bid is finalized.
7. The bidder according to the bidding documents and other comprehensive consideration of the corresponding price quoted by the equipment, the unit price has been reported to include the completion of the contents of the equipment and to meet the requirements of the contract of all the costs incurred and is the nature of the package, the offer of the high and low will be used as a basis for the winning bid, if accepted by the use of the business will be used as a change in the equipment, the amount of manufacturing increases or decreases in the amount of **** with the basis for the settlement of the calculation and settlement.
Chapter VI after-sales service commitment
To:
According to the use of this equipment function, combined with the quality standard requirements and the provisions of the contract terms, our company in the transfer of equipment during the period and warranty period, to do a good job of all repairs, maintenance work to ensure that the after-sales service of this project to achieve customer satisfaction, the service matters in the future and the responsibility to be assumed, the special commitment is as follows:
1. Maintenance service content:
2. Maintenance response:
3. Maintenance measures:
4. Liability penalties:
If our company fails to implement according to the above commitments, we are willing to assume all the responsibilities arising from this and compensate for the corresponding losses and expenses, and the costs incurred will be deducted from the corresponding amount of our company.
Bidder: (official seal)
Legal representative:
Date:
Chapter VII Equipment Quality Warranty
Party A:
Party B:
In order to ensure that the equipment is used normally within a reasonable period of time, Party A and Party B agree to enter into the Quality Warranty for this project. Party B according to the national "***" and the contract between the two sides agreed to bear the responsibility of equipment quality defects warranty.
I. Free warranty period:
The warranty period of this project is 2 years. Calculated from the date of commissioning.
Second, the warranty scope:
This supplemental contract agreed that the equipment within the scope of Party B's contract, due to Party B's manufacturing quality defects and defects in the quality of the materials and equipment, are free of charge of Party B's warranty.
The overall quality of equipment and parts, commissioned in line with the contract requirements, such as Party A sampling to the parts of the permissible deviations in the project beyond the scope of the permissible deviations, the basic project does not meet the excellent project or does not meet the requirements of the perception of the perception of the project, is still within the scope of the Party B repair, Party B shall be required by the Party to carry out the return to the repair.
All direct and indirect losses caused by Party B's equipment quality problems shall be borne by Party B unconditionally. If Party A has other claims, the two sides will negotiate and determine the amount of compensation, and the total amount of costs to be borne by Party B will be deducted directly from Party B's warranty, Party B will be unconditionally recognized.
Three, the warranty of time:
1, water leakage and other equipment affecting the normal use of the situation, Party B undertakes to arrive at the scene within 4 hours after Party A's notice and complete the repair within 6 hours.
2, in the event of an emergency repair accident, Party B shall arrive at the scene of the accident immediately after receiving the notice of the accident to repair.
3. In other cases, Party B shall arrive at the scene within 24 hours after Party A's notification, and complete the warranty and maintenance items involved in the notification within two days from the date of arrival at the scene.
4, each maintenance project is completed, after Party A acceptance and signature, Party B for the maintenance of this maintenance is completed. The maintenance project should be guaranteed within six months without similar problems.
5, violation of the above provisions, Party B agreed to be dealt with by Party A, Party A assigned to other parties to deal with the results are no longer confirmed by Party B (Party A will be dealt with to inform Party B), and therefore all the costs incurred by Party B deducted from the warranty payments.
6, Party B undertakes, regardless of the above quality defects are Party B, Party A's responsibility, after receiving the notice, are to comply with the above time requirements unconditional maintenance, and in the maintenance process with Party A and related units *** with the evidence, in order to determine the cause of the responsibility, does not belong to the responsibility of the Party B, the responsibility of the Party B to pay the cost of materials and labor.
Four, the quality of maintenance measures:
1, each maintenance project is completed by Party A acceptance of the signature can be.
2, maintenance work is completed, Party B is responsible for the maintenance site cleaned up, such as maintenance process to Party A caused by other losses, then Party B shall bear the corresponding responsibility.
3, if one of the following situations occurs, Party A has the right to hire a separate construction unit for maintenance, and all the costs and responsibilities arising from this shall be borne by Party B.
(1) refusing to come to the site to deal with the problem after receiving the notice of repair (verbal or written) from Party A;
(2) failing to come to the site more than 4 hours after the specified time of coming to the site;
(3) failing to complete the task of repairing the relevant works more than the specified time and not taking the initiative to report to Party A;
(4) failing to completely solve the problem even after one time of repairing to the same location;
(5) failing to solve the problem after one time of repairing. (5) Strong complaints from customers due to the service behavior of on-site repairers.
4. For quality problems involving safety, it should be reported immediately to the local **** authorities in accordance with the provisions of the **** Management Regulations, and safety precautions should be taken; the warranty program should be put forward by the original design unit or the design unit with the corresponding qualification level, and Party B should implement the warranty.
Fifth, Party B maintenance arrangements:
1, in the maintenance period, Party B must appoint 1-2 plenipotentiary representative in the field office, dedicated to deal with the maintenance of the equipment; such as Party A believes that the representative is not competent to do the work, Party B in the receipt of the notice to be replaced within 2 days.
2, the person in charge of Party B's warranty (the default person in charge):
Correspondence Address:
Telephone/Mobile Phone:
Fax:
3, the above content of the need to change in a timely manner in writing to notify the Party, or can not be contacted, Party B is deemed to have received the information conveyed by the Party.
Sixth, warranty payment:
1, from the Party B equipment settlement money retained 5% as a warranty payment, after Party B has completed all the repair work (to be signed by Party A), the warranty payment in the warranty time of 2 years of settlement, Party A in the settlement of the settlement of the remaining balance of the warranty payment within twenty days after the settlement of the payment of a one-time payment to the Party.
2. If Party A advances the maintenance cost beyond the total amount of warranty, the excess part is still paid by Party B; all the warranty payments in the settlement without interest. Party B is unwilling to pay the excess, Party A has the right to deduct from any other costs payable to Party B, still not enough to recover by legal means.
VIII. Other:
1. Party B agrees to continue to provide appropriate maintenance services after the expiration of the free warranty period to the effective life span of the equipment, and charge the most favorable price.
2. This warranty: as an attachment to the contract, signed by both parties to the contract **** the same, in the effective life of the equipment has been in force.
Party A: Party B:
Legal representative: Legal representative: Legal representative:
Appointed agent: Appointed agent:
Date: Month of year
Chapter VIII Bidding Documents (Format)
One, the tender
Submitted: (referred to as the buyer)
1. Having carefully read and analyzed the After carefully reading and analyzing the bidding documents of " manufacture " and investigating the site, our company decided to participate in this tender;
2. Our company will organize the production and installation of this equipment in accordance with the bidding documents and the reasonable requirements of the purchaser to ensure that the equipment is completed on schedule, and to ensure that the quality meets the requirements of the corresponding national commissioning standards;
3. The company is willing to accept the conditions stipulated in the purchaser's bidding documents, using *** material declared offer:
Total price of RMB 10,000 yuan, the comprehensive unit price of yuan/square meter;
Manufacturing period days;
Specifically, according to the list of quotations.
4. If our company wins the bid, we guarantee to carry out the bid in accordance with the reasonable instructions of the purchaser and comply with the rules and regulations of the purchaser, and fulfill the responsibilities and obligations of our company in strict accordance with the provisions of the contract between the two parties.
5. Once this bid is accepted by the purchaser within the bid validity period and the notice of award is received, this bid will become a valid contract document and will be binding on us;
6. We understand that you have no obligation to give any explanation to those who have not won the bid;
7. The validity period of this bid will be one calendar day after the return of the bid, and during this period, the bid will still be binding on our company and may be submitted at any time. Our company is binding and can be accepted at any time and this bid is valid.
(This page has no text)
Bidder:
Legal representative (or authorized person):
Registered address of the bidder:
Name of the depositary bank:
Bank account number:
Date:
The second, the legal representative of the qualifications of the certificate
Name of the unit:
Address:
Name of the unit:
Address:
Adress:
Address:Name: Gender: Age: Position:
The legal representative of the Department. For the purpose of manufacturing and installing the equipment, signing the tender documents for the said equipment, negotiating the contract, signing the contract and dealing with all things connected therewith.
Hereby certify.
Bidder: (seal)
Date: Year Month
Third, power of attorney
This power of attorney declares: I (name) is the legal representative of the Department, is authorized to entrust the agent of my company to participate in the bidding activities of the (construction unit) in the name of the company, the agent of the opening of bids, bid evaluation, contract negotiation process, signing all things related to I recognize all the documents signed by the agent in the process of bid opening, bid evaluation, contract negotiation and all the affairs related to it.
The agent does not have the right to delegate. I hereby delegate.
Agent: Gender: Age:
Unit:
Department: Position:
Bidder: (seal)
Legal Representative: (Signature, seal)
Date: Month, Year
Date: Month, Year
Date and Manufacturing and Installation Schedule of the Program***
Bidders shall submit a preliminary manufacturing and installation schedule. Installation Schedule, and the successful Bidder shall also submit a detailed Fabrication and Installation Schedule as required by the relevant provisions of the Contract Conditions.
The schedule may be represented by a crosswalk diagram showing the planned start date and the completion date of each phase of each item of work.
Part No. Total price
(million yuan) **unit price **
unit price **unit price **unit price **unit price **unit price Total quantity
(**) Comprehensive unit price
Remarks
V. Summary of quotations for parts
Note: Including *.
VI. Unit Price Analysis Table
№ Price Component Item Remarks
Serial No. Name Material Specification Model No. Unit Illustrated Amount A Wastage Rate B Unit Price C Total D=A*(1+B)*C
A Material Cost
Other Accessories Yuan
Subtotal
B Fabrication and Processing Fee
C Transportation Costs
D Installation fee
Subtotal
E Comprehensive fee A+B+C+D
Total price (A+B+C+D+E)
Each different model should be analyzed separately;
7. General information about the enterprise
1 Name of the enterprise (official seal)
2 Address of the headquarters in Zip code
3 Local Representative Office
Address Zip Code
4 Legal representative Technical person in charge
5 Qualification
Level Qualification Certificate No.
6 Nature of the enterprise Business license registration No.
7 Year of registration Annual output value (million yuan)
8 Total number of employees Number of technical and managerial personnel
9 Contact person Contact phone number
10 Fax number
1 Name of the enterprise (seal) p>
10 Fax E-mail
11 Main business scope 1,
2,
3,
12 Management system certification 1,
2,
3,
4,
13 Credibility rating
Circumstances
14 In the past three years, the enterprise equipment Awards Equipment Name Contract No. Contract Amount Product Quality Awards Acceptance Date
Note: 1, independent bidders are required to fill out this form, award-winning projects can be more schedules;
2, business license, qualification certificates, management system certificates, corporate performance shall provide effective proof of material copies stamped with the seal is attached to this table; the bidder must ensure its authenticity, if any. False, once verified will be dealt with according to the abolition of the bid.
VIII. Similar equipment purchasing units in the past three years Equipment name and
use of the location of the equipment cost
(yuan) Manufacturing date quality to meet the standards
Chapter IX drawings
The tender provides electronic version of the drawings. The purchaser sends the bidder an electronic version of the drawings with consistent content. After receiving the electronic version of the drawings, if there are problems with the drawings, please contact the purchaser in a timely manner.
Part I: ***Design, including: design notes, **design, elevations, and ***statistical tables.
Part 2: **** Design Ltd. design, including: *** diagrams.
Attachment:
Comprehensive Evaluation of Reasonably Low Bid Evaluation Method
1. Preliminary Examination
1.1 Examine the validity of the bidding documents. The bidding party's qualification level does not meet the requirements of the bidding documents, and the bidding documents are invalid if they are not signed.
1.2 Completeness of bidding documents. The bid without submitting the corresponding information specified in the bidding documents is invalid.
1.3 Consistency between the tender documents and the bidding documents. Whether the bidding documents to the bidding documents to make a substantial response, there should be no modification and additional conditions. Bids that are substantially unresponsive to the bidding documents are invalid.
1.4 Correctness of quotation calculation. Whether the quotation calculation is accurate and whether there is any error in the itemized quotation and the total price. Bids that do not provide a detailed explanation of the tender price lower than the total budgeted price are invalid.
1.5 The bid of the unit which has a major bad record in the execution of the contract in the past two years and is being penalized by the competent authority is invalid.
2. Review: For the bidders who enter the review, according to the bidding documents of the offer, arranged from low to high, in order to their technical evaluation and commercial evaluation.
2.1 Technical evaluation
2.1.1 Whether the bidding documents include the technical documents required to be submitted by the bidding documents.
2.1.2 Whether the bidder's manufacturing organization design is scientific, rigorous and practicable.
2.1.3 The qualifications of the bidder are further examined to confirm its technical capability and experience.
2.1.4 The bidder on the equipment in the technical rationalization of any proposal.
2.1.5 Preferential terms given by the bidder to the equipment in this tender.
2.1.6 Technical evaluation stage of the abolition of the conditions:
The bidding scope of serious deviation from the requirements of the bidding documents. The bidder has no similar equipment performance in the past three years; Bidding below cost; The total price quoted is reasonable, but the composition is seriously unreasonable;2.2 Commercial evaluation
2.2.1 Review the correctness of all the quoted data, and evaluate whether the quoted price is reasonable.
2.2.2 Analyzing the reasonableness of the composition of the offer.
2.2.3 Preferential terms given by the bidder for this tender.
2.2.4 To further evaluate the financial strength and credit reliability of the bidder.
2.2.5 Commercial evaluation of the conditions for the abolition of the bid:
below-cost bid; the total price quoted is reasonable, but the composition of the serious unreasonable; the total price quoted is reasonable but serious omission, serious omission refers to the omission of the part of the cost of the total offer of more than 5 percent.3. The bidder's offer, ability, performance, reputation, financial status and other aspects of a comprehensive evaluation, select the reasonably low bidder to win the bid.
4. Confidentiality
All information relating to the examination, clarification, evaluation and comparison of the bidding documents as well as the intention to award the contract shall not be disclosed to any of the bidders or to persons unrelated to the above evaluation.
5. The bidder shall not interfere with the evaluation of bids by the construction unit or its bid will be canceled.
End ####
Above you can add, delete, modify various technical and commercial conditions!