Construction safety supervision and inspection agencies at all levels (hereinafter referred to as safety supervision agencies) according to the division of responsibilities, is responsible for the supervision and inspection of civilized construction work at their construction sites. Article IV civilized construction site construction unit responsible for the implementation of construction, construction units to assist in cooperation, safety supervision bodies supervision and management system. Article 5 The construction site shall implement the requirements of civilized construction, the implementation of modern management methods. Before the commencement of the project, civilized construction should be incorporated into the construction design, the development of site environmental health systems and civilized construction measures. Chapter II site appearance Article 6 construction site must be hard materials enclosure construction, fence height of not less than 2 meters. Fence import and export access should be set up gates, gates should be hung prominently signage, marked project name, construction unit, design unit, construction unit, project manager and construction site civilization construction responsible person, start and completion date, construction permit approval number, etc., near the main road, large buildings should also be hung building perspective drawings. Article 7 municipal construction projects can not be carried out when the whole section of the paddock closed, must set up pedestrian access. Pedestrian access must be separated from the work area with fences, and with eye-catching signs, access to pits, wells, ditches, etc., must be built safe and secure bridge, and set up protective railings, the height of not less than 1.2 meters, the night shall be set up red light warning. Article VIII street construction projects must be closed construction, closed the height must exceed the operating level 1.2 meters, in order to prevent objects from falling. Closed material to meet the requirements of the mesh safety net, strictly prohibit the use of bamboo fences and poor quality safety net. Article IX construction unit should be arranged in accordance with the construction plan stacking construction materials, set up construction machinery, etc., so that the material stacked neatly, the road is clear. Article 10 The construction projects in the city must do hard floor construction, and improve the water supply and drainage facilities, and shall not make the sewage cross-flow and overflow. Article 11 The construction site should do a good job of cleaning up the discarded steel, lead wire, water management, electric wires, broken bricks, gray sand, wood materials head. Shelf materials and templates (steel, wood) should be stacked neatly after dismantling. Article XII of the project completion and acceptance, the construction unit must be all the temporary facilities removed, so that the work is completed, the material end, the site clear.
Within 7 days after the acceptance of the project, the surrounding environment should be improved according to relevant regulations. Article XIII in the construction site, site management personnel shall wear a card to prove their identity. Chapter III life and health Article XIV construction site of all kinds of temporary living, office facilities, must be set up in accordance with the design of the construction organization, and the establishment of a sound health management system, with a dedicated (part-time) personnel responsible for management. Article XV office space should be in line with the requirements of the normative brick structure, the environment should be kept clean, no garbage and sewage. Article XVI of the cafeteria should be set up away from toilets, garbage dumps (bins) and other places that produce toxic and harmful substances.
The canteens shall adopt brick and wooden structure, prohibit the use of linoleum for roofing, plaster and brush white walls, harden the floor with cement mortar, and paste glazed tiles on the stove, and set up rodent-proof facilities in accordance with the standards.
Dietary hygiene must meet the relevant national health standards. Article 17 The dormitory should be separated from the construction area as far as possible, and use brick and wood structure, wall plastering and brushing white, ground hardening treatment, to ensure ventilation and lighting, and keep clean and hygienic.
Dormitory shall be set up 2 × 0.8 square meters specifications of single beds or bunk beds, prohibit the establishment of bunks, each dormitory shall not be more than 30 people, per capita living area of not less than 2 square meters. Article XVIII of the construction site should be set up toilets, squatting and the number of people than 1:25 - 30. conditions should be set up flush toilets.
Toilet hygiene is responsible for, regular sweeping, emptying, keep clean and sanitary. High-rise buildings in the work area should be toilet facilities, it is strictly prohibited to urinate and defecate. Article 19 of the construction site drinking water must comply with national health standards, set up a special water supply and special insulated drinking buckets, buckets covered and locked to prevent contamination. Article 20 The construction site should be set up infirmary or traveling medical point, medical personnel for seasonal epidemics, infectious diseases, and timely publicity to the workers with the relevant knowledge. Article 21 of the construction site to promote the establishment of cultural and recreational room and the necessary shower room, changing room. Chapter IV Environmental Protection Article 22 The construction unit must strictly abide by the laws and regulations relating to environmental protection, take effective measures to control the construction site in accordance with national environmental protection technology standards of all kinds of dust, exhaust gas, wastewater, solid waste, and noise, vibration pollution and harm to the environment. Article 23 In addition to having devices in line with environmental protection regulations, shall not melt asphalt or burn linoleum, paint and other substances that produce toxic and harmful fumes and foul-smelling gases at the construction site. It is prohibited to use toxic and harmful waste as earth backfill. Article 24 In the urban construction, the construction machinery that generates noise and vibration shall take effective measures to reduce noise nuisance. Night construction must be in accordance with the "Guiyang City, environmental noise pollution prevention and control regulations".