Equipment Repair and Maintenance Contract Model 1
Party A:
Party B:
This agreement is negotiated by Party A and Party B agreed that Party A in order to ensure that the normal use of the weak power intelligent system equipment, entrusted to the party responsible for the maintenance and repair of the existing weak power intelligent system and peripheral equipment, after both parties Friendly consultation is hereby signed the following maintenance contract:
First, the contract period:
The contract period from ____ year ____ month ____ to ____ year ____ month ____ day, after the expiration of the contract period, the two sides can choose to renew the contract or the natural termination of the contract:
Second, the content of the service
Weak-cell system equipment for regular maintenance, troubleshooting, the list of maintenance is attached. Repair and maintenance list is attached;
Third, the service requirements
1, Party B in order to protect the normal operation of Party A's weak power system, Party B will designate technicians for Party A's services.
2, Party B received Party A equipment failure notification within 24 hours (except in special circumstances) rushed to Party A's company as soon as possible to troubleshoot;
3, when Party A's system failures need to be replaced, Party B should be the lowest market price to provide the configuration and is responsible for the installation;
4, Party B in the contract period, on a regular basis (a minimum of two times per month) to the door to carry out maintenance and optimization of maintenance
5, if the contract outside the notice of special operations (such as new points, new wiring) and so on by Party B separate offer.
6, Party B in the maintenance process to replace the equipment required for a single time the total amount of accessories does not exceed $ 100 by Party B is responsible for payment, such as in the maintenance process to replace the equipment accessories for a single time the amount exceeds $ 100 by Party A to pay separately.
Fourth, maintenance costs:
Party A's weak power system needs to maintain the project are: monitoring system, conference system, background music system, parking management system, UPS system, lightning protection system, detailed list in the Annex; comprehensive information, agreed by the A and B negotiation, Party B charged Party A monthly maintenance fee (6500.00) LUXURY $ ____ yuan, the cycle is 12 months, *** counted seventy thousand eight hundred thousand garden integer (78,000. 00 ) yuan.
V. Payment:
Maintenance fee Party B charged in a half-yearly manner: within ten days after the signing of the contract to pay 50% of the total amount of (36,000.00) thirty thousand six hundred and thirty-four dollars within ten days after the expiration of the contract to pay 50% of the total amount of (36,000.00) thirty thousand six hundred and thirty-four dollars.
VI. Responsibilities of both parties
(1) Party A's responsibility
1. When hardware or software failure occurs, Party A should promptly notify the party.
2, Party A shall not be arbitrarily disassembled and change the other connections of the equipment, shall not be a third party to intervene in the services within the contract;
3, Party A shall not require Party B to provide illegal services in the process of service;
4, the maintenance process, Party A has an important data need to be preserved or processed, you should first tell Party B, or Party B due to unawareness of the loss of important data does not bear any responsibility, the Party itself will not be responsible for the loss of important data, and the Party shall be responsible for its own. Party B will not bear any responsibility for the loss of important data due to unawareness, and Party A will bear the responsibility. However, Party B shall endeavor to repair or restore Party A's lost data or equipment; if Party B's equipment or data damage caused by Party B, Party B shall be responsible for repairing or restoring, and Party B shall bear the required costs.
(2) Party B's responsibility
1, Party B in the maintenance process for the Party's commercial data confidentiality, not to disclose the third party to know;
2, Party B in the maintenance process to meet the Party's legitimate requirements, to protect the normal operation of the weak power system and other related equipment.
VII. Other matters
This contract is in duplicate, Party A and Party B each sign a copy, with the same legal effect, since the two sides signed and stamped to take effect. No party shall change or cancel without authorization. Unilateral termination or change of this contract bear all the related responsibilities.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ ____ _________ ____ ____ Day
Equipment Repair and Maintenance Contract Model 2
Party A:
Party B:
Party B is entrusted by the user to undertake Party A's monitoring, elevator call, access control system equipment maintenance and repair to ensure the stable and reliable operation of the entire system. According to the relevant requirements of Party A, according to the relevant national laws and regulations, the specific circumstances of the project, to clarify the rights and obligations of Party A and Party B, by the consensus of Party A and Party B, signed a maintenance service contract as follows:
I. System Overview:
1, the project address:
2, the scope of services: responsible for the system equipment for regular maintenance, maintenance, overhaul and emergency Troubleshooting work to ensure the normal operation of the entire system.
Second, the monthly maintenance service fee:
Amount: RMB (upper case), (lower case) ¥ yuan.
Third, the responsibilities and obligations of Party A and Party B:
1. Party A's responsibilities and obligations:
1.1 Party A found that the system has anomalies appeared, it should be timely notification of Party B and a detailed description of the failure phenomenon, so as to facilitate the preparation of Party B in accordance with the phenomenon of the failure according to the appropriate.
1.2 Party B in the repair and maintenance of the system in the process, Party A for Party B to provide the necessary coordination of help and facilities. After the completion of maintenance, Party A promptly sends people to check and acceptance and sign on the maintenance list to confirm.
1.3 In the process of repair and maintenance, Party A should give Party B the necessary assistance, responsible for coordinating and dealing with other departments and other types of work with matters.
1.4 Party A shall pay Party B the corresponding maintenance fees in time according to the terms of the contract.
2. Party B's responsibilities and obligations
2.1 Provide technical support and guarantee for the normal operation of the system to ensure the normal and stable operation of the system.
2.2 In the normal use of the system equipment, Party B regularly visits Party A to carry out routine maintenance and overhaul of the equipment, once a month.
2.3 Party B shall provide Party A with complete maintenance records and related equipment repair information.
2.4 Party B must comply with Party A's rules and regulations and safety and environmental protection regulations during the maintenance period.
2.5 The system in the ordinary use of the process of failure, Party B should receive Party A formal notice of timely response, the city hours to the scene to deal with, such as equipment damage, can not be repaired at that time, Party B need to provide alternative equipment, and to ensure that the system to return to normal operation within one working day.
2.6 If there is equipment maintenance to replace parts or replacement equipment, the equipment and materials provided by Party B should be accepted by Party A before they can be used for maintenance and overhaul. Replacement of parts and equipment related costs, Party A only need to pay the cost of equipment, the replacement of equipment and parts warranty for one year.
2.7 Party B for Party A during the service period, due to maintenance work occurred in the construction personnel accidents and responsibilities are borne by Party B, Party A is not responsible.
Fourth, the maintenance period:
This contract shall come into effect on March 03, 20--year, and terminate on March 03, 20--year.
V. Maintenance Items:
1. Front-end acquisition and control equipment:
A. Appearance of the shroud clean, check the sealing performance.
B. Front-end professional cleaning.
C. Front-end system testing.
D. Power, electric lock, control, video contacts check to avoid winding and loosening.
2. Total control end system:
A. Quarterly appearance of professional cleaning.
B. For example: monitor: quarterly screen appearance cleaning, using special lens paper and screen cleaning fluid. Check whether there is a magnetic phenomenon, demagnetization processing.
C. Power, control, video contacts check to avoid winding and loose.
D. Check the status of the system software, backup historical data.
VI. Payment:
1. After the signing of this contract, Party A shall pay Party B the monthly maintenance service fee punctually before the monthly number, which is RMB: yuan.
2. Within three days after the expiration of the contract implementation period, such as Party B to complete the maintenance tasks on time, quality and quantity, so that the system is running well, Party A to pay the same amount of money to Party B, counting RMB: ¥ yuan.
VII. Liability for breach of contract:
1. Due to Party B received notice of the failure to make timely treatment of the situation, which caused the system can not be restored to use as soon as possible, Party A will be the amount of the contract / day on the extension of the penalties, deductions in the maintenance costs.
2. Due to special circumstances (not caused by Party B), resulting in maintenance services delayed or can not be carried out normally, Party A shall adjust the time and content of maintenance services according to the actual situation, not counted as a breach of contract.
3. As Party A did not pay the maintenance fees on time, or did not follow the regulations set out in the agreement, resulting in Party B can not carry out normal maintenance work, Party B will be the contract amount of / day on the extension of the penalties, the corresponding responsibility borne by Party A.
VIII.
VIII, the contract dispute:
If there is a dispute in the implementation of this contract, the two sides should be resolved through friendly consultation, such as consultation can not be resolved should be submitted to the arbitration institution in the location of Party A arbitration.
IX. Other:
1. This contract in two copies, A and B each of one, A and B signed the consultation, seal and signature date of entry into force. Attachments and this contract have the same legal effect.
2. In the process of implementation of this contract, all supplemental agreements signed by both parties, stamped and signed by the date of entry into force, is an integral part of this contract, and this contract has the same legal effect.
3. Other outstanding matters, the two sides to resolve.
4. Supplementary provisions:
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ ____ ____
Sample Equipment Repair and Maintenance Contract 3
Commissioned by: (hereinafter referred to as Party A)_________________
Commissioned by: (hereinafter referred to as Party B)_________________ p>
First, the supply and demand sides in the spirit of equality and mutual benefit, the principle of consensus, signed this contract, in order to *** with compliance. p>
Second, the product name: ___________ Model: ___________ Serial number: ___________ Failure causes: ___________ Treatment: ___________ Charge amount: ___________ Travel: ______________________ Door-to-door Service fee: ______________________ Total RMB amount (capitalized): ______________________
Third, the repair method, repair location: _____________________________________________
IV. Mode and place of delivery of repaired equipment: _____________________________________________
V. After the demand side pays according to this contract, the supply side implements the repair, repairs it within _______ days and sends it (delivers it) in the way stipulated in Article IV.
VI. After the equipment is repaired, for the same failure of the equipment, the supplier provides ______ months of warranty.
VII. During the execution of the contract, if for any reason it cannot be performed or needs to be modified, it must be agreed by both parties and a separate contract will be valid.
VIII. Liability for breach of contract: according to the "Chinese People's **** and State Contract Law" and other relevant provisions.
IX, the way to resolve contractual disputes: the implementation of this contract disputes, the parties involved in the settlement of the consultation. Failure of consultation, arbitration by the _________ Arbitration Commission.
X. The above provisions, if any, should be supplemented in writing, _________ as an annex.
XI, this contract is another annex _________ sheet, this contract is a form of _________ copies, both sides of the _________ copies, fax copies are valid.
XII, other agreed matters: _______________________________
Party A: (Signature) _________________ Party B: (Signature) _________________
Contact phone: _________________ Tel: _________________
_________ _____ _____ _____ _____ _____
Sample Equipment Repair and Maintenance Contract 4
p> Party A:
Party B:
By the A and B friendly consultation, in line with the principle of fairness and impartiality, by Party B to undertake Party A Yuping Ziqi Mountain Farmers' Market renovation equipment, the specific matters are as follows:
First, the construction of the contents of the construction: the construction of equipment items designated by the Party.
Second, the amount of construction equipment: farmers market:
1, stainless steel electric rolling door equipment (manual 1, electric 3);
2, glass partition wall equipment (with 12mm toughened glass, woodworking panels, including imitation porcelain, stainless steel compression strips, etc. to make);
3, the canopy, walls, and columns of the imitation porcelain equipment;
4, lamps and lanterns with Energy-saving lamps;
5, stainless steel electric door with a special line (4mm2 Yudie brand steel core);
6, power lines to the ground square (4mm2 white pay sets of lead core wire production);
7, brick masonry glass footing;
8, carpenter's boards package plumbing columns and include imitation ceramic materials;
9, change the damaged downpipe equipment;
10, cleanup, cleaning up the water pipes, and columns of imitation ceramic materials;
10, clean up the water pipes, walls, and columns of imitation ceramic equipment;
11, clean up the water pipes, walls, and columns of imitation ceramic equipment;
12, cleanup of the water pipe;
10, clean up the sewer equipment.
Third, the way to undertake: by party B to take the form of package materials, party B in the construction process, such as party A has changed the content, shall be negotiated by the two sides to solve.
Fourth, the cost of equipment: three hundred and ten thousand one hundred and eighty dollars (¥: - yuan) package.
V. Quality Assurance: Party B strictly in accordance with the project agreed to by Party A, quality and quantity.
VI. Start date: 20 - year - month - day, completion date: 20 - year - month - day.
VII. Safety: Safety accidents in the construction process are Party B's own responsibility.
VIII, security deposit: the date of signing the contract, Party B to Party A to play the security deposit of 20,000 yuan, delivered to Party A, equipment start and completion of six months after Party A return the security deposit (20,000 yuan) to the Party.
Nine, the payment method: the progress of the equipment to allocate equipment to party B, every ten days to allocate a payment, the first December 28th allocation of 100,000 yuan, the completion of the equipment party A need to pay party B equipment amounted to three hundred and fifty thousand one hundred and eighty dollars, the rest of the equipment by the acceptance of the party A six months after the quality problems do not occur when a one-time payment to the party.
X. Liability for breach of contract: (duration of 40 days) Party B does not complete on time, overdue one day fine of one thousand yuan, one day in advance of the reward of one thousand yuan, Party A does not pay the equipment on time, resulting in equipment can not be completed on time, Party A is solely responsible for.
XI, the two sides to negotiate separately, the contract in quadruplicate, A, B, the two sides of the two copies, the above content of the two sides to sign the date of entry into force.
Party A:
Signature:
Party B:
Signature:
20--year--month--day
Equipment Maintenance Contract 5
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
First, the content of the equipment, equipment requirements:
1, maintenance during working hours, can not affect the normal order of the school, while the need to do a good job of safety precautions, the construction can not affect the other facilities, such as damage, Party B is responsible for the compensation to repair;
2, the work must be done in accordance with the relevant norms of construction, compliance with the law, abide by Party A's rules and regulations. Obey the law, abide by the relevant rules and regulations of Party A;
3, Party B in the construction process must strictly take the appropriate technical measures;
4, Party B in the construction process must be conscientious and responsible, can not jeopardize the original facilities, if there is damage, all the responsibility is borne by the Party B and is responsible for the repair, Party B retains the right to Party B to further pursue legal responsibility;
5, Party B in the work at height, should independently do a good job of safety precautions, do a good job of their own personal safety, all the safety responsibilities borne by Party B, Party A is not responsible.
Second, the cost of equipment: according to the actual settlement of the cost of (lowercase: yuan) (see acceptance list for specific costs).
Third, the payment method: in the equipment acceptance within one month after payment.
Fourth, the warranty period: one year from the date of completion and acceptance. (This maintenance equipment in 20 - year - month - has been fully completed and accepted.)
Fifth, Party B shall be in accordance with national and local norms and regulations to do a good job on-site construction safety precautions, strict compliance with safety regulations, construction of all types of accidents occurring during the Party B is responsible for the Party A does not bear any responsibility. All construction tools by Party B self-care.
Six, this contract in duplicate, each side of a copy, since the two sides signed and sealed to take effect.
Party A:
Party B:
20--Year--Month--Day
Equipment Repair and Maintenance Contract 5 Related Articles :
★ Facilities and Equipment Repair and Maintenance Contract 5
★ Equipment Maintenance Service Contract 5
★ Repair and maintenance contract general model 5
★ equipment maintenance contract simple version of the model 7
★ equipment maintenance contract model 5
★ equipment mechanical maintenance contract model 5
★ equipment maintenance contract model 10
★ common facilities and equipment repair and maintenance contract model 4
★ equipment repair formal Contract Forms 5
★ Factory Equipment Maintenance Contract Sample 5 2022