Technical bidding is the symmetry of "technical bidding". It means that the bidder agrees to the conditions specified in the bidding documents prepared by the bidder, and provides the bidding technology in advance to participate in the competition, and provides the technology for the buyer's choice.
Technical program for bidding
1. Delivery place, delivery time, delivery mode, transportation conditions and installation time:
2. Delivery location: user-specified location.
3. Delivery time: 15 days before the contract is signed.
4. Delivery method: after the equipment arrives at the designated location, the customer can pass the inspection.
5. Transportation conditions: special car freight, freight is borne by us.
The quality standard and acceptance method of the bidding goods are as follows:
1. After the product arrives at the designated location of the user, the user will organize the acceptance of the equipment.
2. Acceptance standards:
(a) Quality acceptance: product acceptance in accordance with national standards, industry regulations or other relevant standards; product acceptance in accordance with the product specifications of the enterprise.
(2) Quantity acceptance method: according to the contract requirements and packing list, the product configuration list and product components are consistent with the product specifications, product certificates, manuals and other sets of technical information.
Spare parts:
If the original equipment is damaged due to abnormal operation of the instrument, the company will provide appropriate spare parts according to the actual situation, and the company will provide the user with sufficient fragile parts. The user instrument operation provides a strong support.
The duration of the problem during the quality assurance period is:
We promise to give a reply within 2 hours when there is a problem in the use of the product. If technicians are needed to solve the problem on site, we will arrange for technicians to arrive at the site with their own cars within 24 hours.
The bidding technical program:
According to the technical parameters of the products in the bidding documents and the actual situation of the users, our company has chosen the high-quality products above the mid-range, to ensure that the instrument is stable, reliable, inexpensive and good quality. Products.
Other:
The company signed a technical support contract with the manufacturer. The manufacturer assumes all technical support. The technical specifications of the products represented by the company can meet the bidding requirements. In order to ensure that the responsibilities of suppliers, purchasers and manufacturers are in place, the Company intends to use a tripartite technical service agreement in its business operations in order to maximize costs. End-users will always have access to the relevant units and personnel to deal with problems encountered.
ReferencesTechnical program is for the research to solve all kinds of technical problems, targeted, systematic proposed methods, countermeasures and related countermeasures. The content may include scientific research programs, plans, planning programs, construction programs, design programs, construction programs, construction organization design, bidding process of the technical bidding documents, large-scale lifting operations lifting operations program, production programs, management programs, technical measures, technical routes, technical reform programs, and so on.
In patent documents, a technical program is a combination of technical features that clearly and completely describes the invention or utility model to solve its technical problems.
References: