Conventional small and medium-sized sewage treatment equipment: the relevant sewage treatment links, sewage treatment unit accessories are basically readily available, as long as the procurement back to the assembly can be, sewage treatment equipment companies as long as the theme of the structural planning and design, as well as the theme of the load-bearing structure of the design of the installation, plus the installation, generally 3 - 7 days! Can complete a sewage treatment equipment, from production to installation are perfect.
Special customized equipment: this equipment may not be large, but contains some special sewage treatment technology, this technology is often in the hands of a few or one or two sewage treatment equipment companies, they generally do not make a good job related to the technology accessories to be used, often according to the customer's order to make, generally including nitrate ion treatment, heavy metal ion treatment and other conventional means of treatment Difficult to deal with the quality of sewage water. The production cycle is relatively long, often need 10 - 20 days of production time.
Large customized sewage treatment equipment: for power plants, oil refineries and other large factories; for urban sewage treatment plants, etc., this equipment is tailored to each treatment unit needs to be tailored to the impossibility of having a ready-made relevant treatment unit, and in some cases, even grids, screens need to be made on site, which increases the production cycle, but because the various aspects can be separate Construction, the work cycle can be compressed in reverse. This depends on the staff of the sewage treatment plant manufacturers, if the staff can be fully equipped in accordance with the needs of the production cycle can be completed in about 1 month.
Different equipment, in the production process varies greatly, and therefore also leads to a very large elasticity of the production cycle of sewage treatment equipment.