Can the Hebi Fish Springs Storage Project succeed?

Can.

A, bidding conditions

South-North Water Diversion Center Line Hebi fish spring storage project survey, design has been with the bidding conditions. Bidding for the Hebi City South-to-North Water Diversion Centerline Storage Project Leading Group Office, the bidding agent for up to the construction management development limited liability company. South-to-North Water Diversion Middle Line Hebi fish spring storage project survey, design of domestic open tender.

Second, the project overview and scope of the tender

2.1 Project Overview: the planned Hebi Fish Spring Storage Project is located in Hebi Qixian Sidhe River upstream of the Fish Spring Village near the distance from the main city of about 17km, the project area because of its unique geographic location and geological conditions suitable for the construction of large-scale storage project. The preliminary planning function of the project is to regulate the water supply of the middle line of the South-to-North Water Diversion, and at the same time take into account pumped storage, wind power generation, photovoltaic power generation and so on.

2.2 Construction location: Hebi Qixian Sidhe River upstream near Yuquan Village;

2.3 Funding source: financial resources;

2.4 Bidding section division: this project **** divided into 2 bidding sections, 1 survey bidding section, 1 design bidding section.

2.5 Bidding Scope:

(1) Survey Bid: South-to-North Water Diversion Central Line Hebi Fish Springs Storage Project feasibility study, preliminary design, bidding design, construction drawings, and other phases of the survey work (including all phases of land requisitioning, relocation and resettlement of immigrants, water protection, environmental protection, etc. survey work); project approval should be provided for the relevant topics (land pre-approval, evaluation of the overlying mineral deposits, geologic hazards) report preparation. risk assessment) report preparation.

(2) design bid: the South-to-North Water Diversion Project feasibility study, preliminary design, bidding design, construction drawings, and other phases of engineering design, water protection design and environmental protection design; South-to-North Water Diversion Project feasibility study, preliminary design, construction drawings, the stages of the resettlement of the Hepi Fish Storage Project planning and design (including the outline of the physical survey, the physical survey report, the resettlement planning outline, the resettlement plan, the resettlement of the migrant Resettlement planning (including physical investigation outline, physical investigation report, resettlement planning report); digital design and information technology integrated management system research and development; project approval must be other relevant topics (storage project intake special design; storage project and intake safety impact assessment; seize the Feng reservoir flood control impact assessment; planning and site selection; water and soil preservation program; energy conservation assessment; social stability risk analysis and assessment) the preparation of the report and the preparation of the relevant technical Service work.

2.6 Service Cycle:

Survey Service Cycle: 60 calendar days (survey results of the feasibility study stage will be completed within 60 calendar days after signing the contract, and other stages of survey and special reports will be carried out according to the progress of the owner and the project approval).

Design service cycle: 150 calendar days (preliminary results of the feasibility study and design will be completed within 90 calendar days after signing the contract, and the feasibility study report will be completed within 150 calendar days, and other phases of the design and thematic reports will be carried out according to the progress of the owner and the project approval.)

2.7 Quality requirements: comply with the current norms, standards, regulations, etc., and pass the review of the relevant departments to assist the bidder to obtain the approval of the higher authorities.

2.8 The tender is subject to post-qualification examination.