A project overview
Description of the technical background related to the source of the project, the existing technological basis and the basis of the work, including the results achieved in the previous period or technology (technology), the development of research in related areas *** situation and comparative situation with similar domestic and foreign technology.
Second, the field of application
The overall goal of the project's technology, content and technical indicators (with reference to the contract), the results of the project involves the scientific and technological fields and the scope of popularization and application.
Technical program and principles
The overall program of the project technology, technical routes, project process management methods.
Fourth, the scientific nature of the key technologies, advanced and innovative
The project features and solves the key technologies and content, patents (especially patents of invention and foreign patents) and intellectual property rights analysis, the project involves technological transformation, technology introduction and international cooperation, the project's technical level with the domestic and foreign comparative evaluation.
V. Project Scale, Functions and System Performance
Hardware and network support environment for system operation, application coverage, software subsystems, functional modules, subsystems, performance description.
Six, application and analysis
The results of the current application, transformation (including cooperation with users or enterprises, etc.) and promote the application of the scope, conditions and prospects for analysis.
Question 2: How to write a technical report of the project Source, objectives, technical programs, processing, results.
Question 3: How to write a project summary ah? How to write a project summary 2008-12-30 06:27 I. Project summary should be achieved
1. Confirmation of what works in this project, and what are the reasons for it?
The summary is not to sing the praises of merit, but must write the success of the experience and the use of special methods or tools to facilitate the accumulation of knowledge and experience.
2. Preventing Repeated Mistakes
Many mistakes occur during the course of a project, and preventing them from happening again by summarizing the mistakes that occurred and the improvements that were used as a basis for improving the process and improving the management of the project.
3. Motivate team members
Project team members want to know how well they are doing. At the start of the project LPDT should determine the content of the project to be summarized, including the criteria for project evaluation, the method used, and the participants in the evaluation (such as department managers or project director, etc.). This should include the evaluation of the performance of the project team members, as long as the evaluation is fair, equitable and open, it will motivate the project team members to work harder and more actively.
4. As evidence of project practice
Sometimes, customers (including internal customers) need to refer to your record of successful project practice when choosing a project contractor, and this is when the project summary report will become important evidence.
Second, the project summary should include the content
1. project time
How does the actual project schedule compare to the planned results? What were the changes in between? How much did the actual workload differ from the estimate? The answers to these questions should be reflected in the project summary. The company should establish and improve the historical experience library, the project summary should provide accurate and comprehensive data for this, so that the subsequent projects can get valuable reference information to help them improve the accuracy of the plan, so as to enhance the competitiveness of the company's research and development.
2. Project costs
For organizations that have not established project accounting, labor costs can be expressed as a weighted (person x day) number, and corresponding weights can be assigned to personnel in different roles.
3. Project Quality
It is important to detail how well the final deliverable of the project meets the market demand (that is, the state of fulfillment of the demand). For in-house projects, the customer may be your supervisor or the organization itself.
4. People management and communicationHow well did the project team members perform? Is there sufficient internal and external communication during the development process? What is the impact on the project? The answers to these questions should also be fully reflected in the project summary.
5. the use of new technologies or new methods here mainly refers to new technologies or methods used in project management, such as project planning and project monitoring tools used. Can also be other, such as software development projects in the use of case (CASE) tool. So that the subsequent project team reference to adopt the ability to enhance the efficiency of research and development and project control.
6. Project features to explain the comparison with previous projects, the project what is special? For example, special needs, special environment, different from the regular supply of resources. In short, some challenging events and key solutions and implementation processes. So that the subsequent task force can learn from, used to avoid the project risks that may be encountered. 7. Customer feedback should be customer (including internal customers) feedback and response measures as part of the project summary. Reflect the project development "from the customer to the customer to go" the essence of the characteristics.
Finally, adhere to one principle: the project summary should be not to the person. Do not write a summary of the failed project as a criticism, attack or even personal attacks on the article; do not fail to summarize the project will be opened as a criticism of the meeting.
Issue 4: Project Technical Report The technical report contains the following
1. task source
2. development background, application areas, role significance
3. technical program, technical principles, technical characteristics, overall performance indicators
3.1 technical program
3.2 technical principles
3.3 Technical characteristics
3.4 Overall performance indicators
4. Research and test content (focus on writing)
5. The project's advancement and creativity
6. References
The economic benefit analysis report contains:
1. The production capacity formed by the project
2. Market sales, profits and taxes,
The work report contains:
1, the background of the project
2, the source of the task and the research objectives
3, the research process
4, the work achieved in the success of the plant
5, the size of the contribution of personnel division of labor
6, the use of funds
7, the results of the property
Question five. How to write the technical route in the project application? It refers to the operational steps of the specific procedures for conducting the research, and should be as detailed as possible. The key points of each step should be clearly described and operable. If possible, you can use flow charts or diagrams to illustrate, to achieve the effect of a glance.
You can go to Baidu library ting find, there are models, there are guidance articles.
Question 6: How to write a project application report 1, the background of the project 2, the development trend of domestic and foreign technology 3, the project technology implementation program 4, the project innovation, advanced 5, the project investment budget estimates 6, the social and economic benefits This is a relatively simple reporting process format. Each project has different requirements for the feasibility study report (project declaration). But roughly generally around the above six points to write.
Question 7: software, research and technical report how to write? Urgent I. Overview
Briefly describe the background of the project, the state of technological development, the existing industrial scale; the main purpose of the project products, performance; the need for investment and the expected economic benefits; the advantages of the enterprise to implement the project.
Second, the technical feasibility analysis
1, the project's technical route, the reasonableness and maturity of the process, the advanced nature of key technologies and the effect of the discussion.
2, the level of technical performance of the product compared with similar products at home and abroad.
3, the advantages of the project undertaking unit in the implementation of this project.
Third, the project maturity
1, the results of the technical appraisal documents or product performance test reports, product identification certificates.
2, the stability of product quality, as well as price, performance and other aspects recognized by users.
3, the core technology of intellectual property rights. The introduction of technology digestion, absorption, innovation and follow-up development capabilities.
Fourth, the market demand and risk analysis
1, the scale of demand in the domestic market and the development prospects of the product, the competitive advantage in the domestic market and market share.
2, the international market conditions and the future growth trend of the product, the ability to compete in the international market, the possibility of product substitution for imports or exports.
3, risk factor analysis and countermeasures.
V. Investment Estimates and Financing
1, project investment estimates
2, financing options
3, investment utilization plan
VI. Economic and Social Benefit Analysis
1, the next five years, production costs, sales revenue estimates.
2, financial analysis: mainly dynamic analysis, to provide financial internal rate of return, loan repayment period, payback period, investment profit margin and tax rate, financial net present value and other indicators.
3, uncertainty analysis: the main break-even analysis and sensitivity analysis, to judge the project's ability to resist risk.
4, the conclusion of the financial analysis
5, social benefit analysis
VII. Comprehensive strength and industrial base
1, the composition of the enterprise staff (including the composition of the division of labor and the composition of the academic qualifications)
2, the educational background of the top management or project managers, scientific and technological awareness, market development capabilities and business management level.
3, the enterprise engaged in research and development of personnel strength, capital investment, as well as the enterprise's internal management system.
4, the enterprise engaged in the production of the product conditions, industrial base (including project implementation of infrastructure and raw materials required for the source, supply channels, etc.).
VIII. Project implementation progress plan
IX. Other
1, environmental protection measures
2, labor protection and safety
3, the necessary supporting materials
(1) special industry licenses (such as food, pesticides, pharmaceuticals, fertilizer product production licenses and approvals); communication products into the network license; public ** ** safety product production license; pressure vessels and fertilizer production licenses and approvals. ** safety product production license; pressure vessel production license, etc..
(2) can provide proof of project establishment, high-tech enterprise certificate, product quality certification, environmental protection certificate; product ordering intentions, contracts and other supplementary materials.
X. Conclusion
Question 8: How to write a project evaluation report Model project evaluation report
I. Overview
(1) Overview
(2) Project overview
II. Evaluation of the need for the project construction
III. Evaluation of construction conditions
IV. > v. Environmental assessment
vi. Risk assessment
vii. Break-even analysis ......... (omitted).
VIII General Assessment
(I) The construction of the project, has an important role to,, and all.
(b) In xxx city *** direct leadership and support from relevant departments, the project construction is progressing relatively smoothly, and the internal and external conditions for construction are in place.
(C) the project uses the process technology has been the domestic industrial production test, the technology is mature and reliable. The production process and equipment configuration provided by ××Pharmaceutical Factory is complete and can meet the needs of production.
(d) The economic benefits are significant.
Question 9: the project declaration of the "main research and development content", "the main technical and economic indicators", "will provide the research and development results and the form of" how to write 20 points "the main research and development content" is the technical content, "the main technical and economic indicators" can be written on the technical parameters, "will provide Dan research and development results and forms" is the conclusion. is the conclusion.