Honorable Chairman Chen, vice-chairmen, members:
Grateful to you for taking precious time out of your busy schedules to care for and inspect the work of environmental protection, the following, I'll make a brief report on the status of environmental protection work in the recent past.
A fundamental situation
(a) the state of environmental quality in our county
At present, there are more than 600 discharging enterprises in the county, of which, 171 industrial enterprises above the scope of the scope of more than 10 aquaculture (while not on the scope of the small and medium-sized enterprises and farmers but a lot of, in particular, the aquaculture industry of nearly 2,000 households). County ambient air quality to reach the second level of norms (good) or more, the air quality index API?100 days up to 100%; centralized drinking water standards for 100%; urban water environment utility area (monitoring section for the Kaijiang Huilong Town Zhongjiawan, classified as Class Ⅲ water quality; place name river, Xiping River outbound section) water quality standards for 100%, but this has been presented 2 times exceeded the standard; regional ambient noise uniform values Reached the "urban regional environmental noise norms"; traffic arterial noise uniform value also did not exceed the standard.
(2) the fundamental situation of the Bureau
At present, the Bureau set up four units (Office, Environmental Impact Assessment Unit, Pollution Prevention and Control Unit, Natural Ecological Maintenance and Environmental Monitoring Unit), jurisdiction of the two institutions (environmental monitoring brigade, environmental monitoring station), environmental maintenance system **** has a preparation of 45, 37 employees. Bureau team guiding the number of 6 people (1 positive 3 deputy 1 discipline inspection team leader 1 chief engineer), the existing director of 1, deputy director of 1, 1 discipline inspection team leader, vacant deputy director of 2, 1 chief engineer.
Second, the recent main work and results
Recently, the county in the face of rapid development of industry and livestock and poultry farming situation, adhere to ? In the development of maintenance, in the maintenance of development? Idea, really put the environmental protection in a more prominent position, tightly coiled around the economic and social development of the overall situation, and comprehensively promote the prevention and control of pollution and total pollutant emissions reduction and ecological environment maintenance project, better completed the work of the task.
(a)? City examination? Work to complete the break
20*, the county in-depth summary of the last degree? City examination? (the provincial government of the counties & lt; city, district & gt; comprehensive quantitative assessment of the urban environment) work on the basis of the loss of experience and actively think of ways to add measures, digging potential, to overcome the difficulties, in the adversity of a strong break. 20* degree? City examination? Results of the comprehensive score of 80.25 points (ranked 58th in the province), the province ranked 27. This May 7, the province in Bazhong to stop the test, (according to the status of the test) our county 20 * degrees? City examination? The results of the composite score and a great improvement in about 40 places.
(2) pollution emissions cut
20*, emission reduction indicators exceeded the target task. Among them, chemical oxygen demand completed 1609 tons, sulfur dioxide completed ** tons (completed? Twelfth Five-Year? Purpose of the task), ammonia nitrogen completed 457 tons; completed the deadline management of two industrial enterprises, the implementation of the deadline management of two range of breeding enterprises.
(C) environmental safety is guaranteed
One is to actively carry out? Rectification of illegal emissions enterprises to ensure public health? Environmental protection special action, heavy metal emissions enterprises, pollution reduction key enterprises, drinking water sources and range of livestock and poultry farms to stop special inspections, serious investigation and handling of environmental violations. The second is to enhance the heavy, hazardous key industries, environmental supervision, urging the sewage unit to improve the operating efficiency of environmental protection equipment, to eliminate the abnormal use of pollution management equipment, pollutant emissions, emissions and leakage and other environmental violations occurred. Third, enhance nuclear and radiation safety monitoring and management. The county's medical institutions Ⅲ medical ray installation and station radiation security installations and electronic companies to stop the radiation quality control installations to check and urge for radiation safety certificate. Fourth, enhance the maintenance of drinking water sources. Included in the national, provincial, municipal and county-level key regulatory objects of the 18 key enterprises, 3 industrial zones, 81 drinking water source maintenance areas, *8 farming enterprises (farms) to carry out inspections as requested, and timely disposal of the problems found. Fifth, to further standardize the sewage fee collection process. The B/S version of the sewage fee collection management system, complete the sewage declaration and sewage fee collection work of the whole process of computer management, standard sewage fee collection behavior. 20*, our bureau on behalf of the government to collect sewage fees and monitoring fees *** more than 2.2 million yuan, a record high.
(4) EIA system has been implemented
To establish the project approval for the control of new sources of pollution breakthrough, strict implementation of the ? Environmental impact assessment system? and? Three simultaneous? system, to avoid the source of The two high and one capital? Enterprises. In the site selection process, the project does not meet the environmental requirements to stop the veto, in the approval process, resolutely rejected the project does not meet the environmental protection planning, heavy pollution, backward technology, and so on, effectively eradicating the generation of new sources of pollution. 20 *, *** approval of the new, expansion, technological transformation projects 248, of which: "Environmental Impact Report Form" project 23; "Environmental Impact Cancellation Form" project 225. Do not meet the environmental protection requirements of the seven projects to stop the veto, in the approval process resolutely rejected does not meet the environmental protection planning, heavy pollution, backward technology and other projects 1, effectively eradicating the generation of new sources of pollution.
(E) illegal sewage enterprises were punished
20*, **** investigated and dealt with 2 illegal sewage enterprises. Ltd. of Sichuan Fengchun due to the private hidden pipe illegal sewage behavior, a fine of 30,000 yuan; * County Yida Renewable Resources Processing Plant waste oil drums are not stacked according to the request, resulting in the leakage of waste oil pollution of the environment, a fine of 20,000 yuan. Is the heaviest penalty ever, the most fines one.
(F) ecological founding work smoothly
20*, the completion of the national ecological village 1, provincial ecological village 5 (target task 4), municipal eco-village 95 (target task 20), the provincial eco-home 10 (target task 8), the municipal eco-home 20, green school, green community each 1.
(VII) environmental monitoring work has been enhanced
20*, completed various types of routine monitoring * 4 times, completed 25 sewage enterprises pollution source surveillance monitoring 50 (times), completed the pollution entanglement monitoring 37 (times), completed the monitoring of drinking water 32, completed the establishment of the project? EIA? Environmental status monitoring 62 (times), the establishment of the project environmental protection equipment completion acceptance monitoring 5 (times), deadline management project sewage disposal equipment completion acceptance monitoring 3 (times). All **** out monitoring data more than 3,000, the completion of service monitoring charges more than 400,000 yuan.
(viii) further progress in the establishment of environmental capabilities
20*, environmental monitoring brigade up to the national level two norms, the second air automatic monitoring station was completed and put into operation in 20**. Environmental monitoring station staffing, equipment and equipment configuration at all to reach the national norms of the three stations, pollution monitoring, monitoring system to further improve, and strive for today's monitoring station to reach the national norms of the three stations.
Third, there are major problems
(a) pollution reduction is a daunting task
One is to reduce emissions without project support. Pollution reduction is a rigid indicator of the assessment of various places, the implementation of? A veto. According to the source of pollution census data, the total amount of pollution in our county is high, and mainly from agricultural sources of pollution and living sources of pollution. Agricultural pollution sources are mainly farming pollution, chemical oxygen demand (COD), ammonia nitrogen (NH3-N) and other local emission reduction without project support.
The second is the slow establishment of urban sewage disposal plant. Urban sewage disposal plant designed to dispose of 15,000 tons / day, the disposal rate of 20%; township sewage disposal plant (station) has just begun to establish, and slow to stop. Thus, the pressure to reduce emissions is still very large, it is difficult to reach the provincial ecological county establishment request.
Three is the structure of emission reduction. Elimination of process backward industrial enterprises is not enough, brick factory desulfurization, coal to gas project is slow to stop.
(2) surface pollution management difficulties
One is the town did not support the sewage collection network and sewage disposal equipment, in addition to the local towns on the request of the establishment of septic tanks for new houses, most of the towns of the new houses are still not equipped with the establishment of biogas septic tanks, domestic wastewater did not stop harmless disposal, the fundamental direct discharge into the river.
The second is the serious pollution of livestock and poultry farming. Livestock and poultry farming pollution has been particularly prominent recently, at present, livestock and poultry farming company + farmers form and farmers to raise their own, the county more than 10 above the scope of small and medium-sized range of several hundred, most of the small and medium-sized range of farmers did not build the disposal equipment, the scope of the breeding of the disposal equipment is also basically a setup. Complaints from the people by increasing, livestock and poultry pollution has become a big problem of rural surface pollution.
Third, farmland runoff pollution. Fertilizers, pesticides, agricultural films and other agricultural materials unscientific use and disposal, surface water, open water, agricultural products have a greater impact.
Four is aquaculture pollution. Net box fish farming repeatedly prohibited, Puxing, Jiguang Reservoir and other still have net box fish farming.
(C) industrial enterprises are more difficult to regulate
We have developed a strong industrial county to carry out the strategy, a large number of introduction of projects, environmental protection approval and supervision to bring some difficulty. Series Qing - Xinglong, Cangshan Industrial Park has not yet stopped the planning of environmental assessment, but also put forward a higher request for supervision. Especially for the townships of some small businesses, more points, environmental protection law enforcement officers less, supervision has some difficulty.
(4) lack of environmental investment