Question 2: How to write acceptance after the installation of equipment? Supervision and inspection of special equipment and periodic inspection procedures and requirements (for trial implementation) a license project name special equipment manufacturing, installation, transformation and maintenance supervision and periodic inspection two, set the basis for "Special Equipment Safety Supervision Regulations," Article 21: "boilers, pressure vessels, pressure piping components, lifting machinery, large amusement rides and boilers, pressure vessels, elevators, passenger ropeways manufacturing process. , lifting machinery, passenger ropeways, large amusement rides installation, transformation, major maintenance process, must be approved by the State Council's special equipment safety supervision and management department of the inspection and testing agencies in accordance with the requirements of the safety specifications for supervision and inspection; without supervision and inspection shall not be factory or delivered for use." Article 28: "Special equipment shall be used in accordance with the safety specifications of the periodic inspection requirements, in accordance with the safety inspection of qualified limited period of one month before the expiration of the special equipment inspection and testing organizations to put forward the requirements of periodic inspection, without periodic inspection or inspection of unqualified special equipment, shall not continue to use." Third, the supervision and inspection procedures and requirements (a) the application conditions apply for special equipment manufacturing, installation, transformation and repair (hereinafter referred to as production) process of supervision and inspection should have the following basic conditions: 1. The manufacturer should obtain a manufacturing, installation, transformation, repair license, and within the period of validity; 2. Installation of transformation and maintenance of the construction has been carried out in accordance with the provisions of the construction of the information; 3. Installation of equipment is to obtain the license to manufacture the Manufacturing unit of the product, and in line with the requirements of safety specifications; 4. The transformation and repair of equipment has been registered for use; 5. Production quality management system is functioning properly; 6. With the scope of the production of safety specifications, standards; specific conditions and requirements see the relevant rules for supervision and inspection, and other safety and technical specifications. (B) the implementing agency AQSIQ approved by the quality and technical supervision departments at all levels of special equipment inspection and testing organizations. Manufacturing supervision and inspection in accordance with the principle of territorial management, by the location of the inspection and testing scope of the provincial and municipal inspection and testing organizations responsible for the implementation of the specific implementation of the provincial Quality and Technical Supervision planning, and publicity to the community, notify the manufacturing unit in writing. Installation, renovation and maintenance supervision and inspection by the local inspection and testing of the scope of the inspection and testing organizations responsible for the specific scope of inspection and testing, by the provincial Quality and Technical Supervision Bureau arrangements, and announced to the community. (C) supervision and inspection procedures for special equipment manufacturing supervision and inspection, including application, acceptance, supervision and inspection, supervision and inspection certificate issued and other procedures: 1. Application Application for manufacturing supervision and inspection of the unit, should be applied to the local Quality and Technical Supervision Bureau, with the following materials 1: (1) manufacturing license (copy or copy); (2) the manufacture of the main products and their production plans. Application for installation, renovation and maintenance supervision and inspection of units in the fulfillment of the informational procedures to the local Quality and Technical Supervision Bureau of special equipment inspection and testing organizations to apply, and attach the following materials 1: (1) construction of the informational book (copy); (2) construction contracts; (3) construction plans. 2. Acceptance of the local Quality and Technical Supervision received an application for supervision and inspection of the manufacture of the application, after reviewing that meet the prescribed requirements To be accepted and notify the affiliated inspection and testing organizations to arrange supervision and inspection work, while notifying the manufacturing unit. Inspection and testing organizations to receive the installation and maintenance of supervision and inspection applications, after review that meet the requirements, should do a good job of supervision and inspection arrangements, and notify the installation and maintenance of the unit, 3. Supervision and Inspection Manufacturing Supervision and Inspection: Manufacturing units should be on-site supervision and inspection of the agency to provide the following materials and conditions: (1) production plans; (2) quality management manuals and related management systems; (3) Quality Management personnel, professional and technical personnel and professional and technical workers list and certified personnel documents; (4) manufacturing equipment design documents, manufacturing process documents; (5) the manufacturing process of various inspection, acceptance data; (6) the establishment of a person to cooperate with the supervision and inspection; (7) the necessary office conditions; inspection and testing agencies should be based on the output of the manufacturing unit, the arrangement of inspectors to meet the specified requirements for supervision and inspection work. Inspection work. Installation and maintenance supervision and inspection: installation and maintenance units should be provided at the scene of the following materials and conditions: (1) construction plans; (2) quality management manuals and related management systems; (3) quality management personnel, professional and technical personnel and professional and technical workers list and certified personnel documents; (4) equipment, factory documents, installation and maintenance of construction technology and the corresponding design documents; (5) construction of various inspection, acceptance information in the construction process. process of various inspection and acceptance information; (6) the establishment of specialized personnel to work with; (7) according to the supervision and inspection, the need to set up a fixed office space on site, to prepare the necessary office conditions. Inspection and testing organizations should be based on the condition of the equipment, an ...... >>
Question 3: how to write the acceptance opinion of the laboratory instrument and equipment acceptance personnel Instrument and equipment management Equipment as an important element of resources should be included in the quality management system, participate in the operation of the system in order to achieve the quality policy and objectives. Therefore, should be established in line with the guidelines for equipment management system, the implementation of comprehensive quality management, so that the instrumentation and equipment to maintain a good working condition, to meet the needs of the testing work. Establishment of equipment quality management system (1) Establishment of equipment management organization Equipment management organization consists of quality management department, technical department and support service department. According to the characteristics, scope and workload of the equipment management work, determine the duties, powers and mutual relations of the management personnel, verifiers, operators and service personnel, so that the management functions are decomposed and implemented to the relevant departments and positions, and try to make the duties clear and the division of labor clear. (2) Develop equipment management procedures Equipment management procedures are the way for testing organizations to implement equipment management. Through the establishment of the corresponding program documents, clear process of equipment management activities, steps, content and all the links, so that all the work can be followed. (3) the preparation of equipment operating instructions equipment operating instructions is to guide the test personnel to operate the equipment specification documents. General equipment can be operated in accordance with the instructions, large, complex instruments or operators of large mobility, unstable performance of the equipment need to prepare operating instructions or operating procedures. Sound equipment quality management system (1) evaluation system Evaluation is a preliminary work to add or dispose of equipment, mainly from the adaptability of the equipment, reliability, economy, safety, maintenance and other aspects of a comprehensive analysis, the purpose is to rationalize the allocation of equipment resources, equipment to play the best benefits. For large, valuable, sophisticated instruments need to be certified for feasibility, to achieve technically advanced, reliable performance, the need for work, economically reasonable; for rental, maintenance, elimination of equipment, as well as small or auxiliary equipment, the necessary review should be carried out. (2) Acceptance system Acceptance is an important means to ensure the normal operation of additional or repaired equipment. The unpacking and unsealing of instruments and equipment should be carried out in the presence of equipment managers, operators, supply staff and other relevant personnel. During the acceptance process, the equipment evaluation requirements, ordering contracts and packing lists should be counted one by one and records should be made. For large-scale, precision instruments and equipment, after installation and commissioning, should also be through a certain period (within the contract period) of trial operation, according to the actual operating results and indicators of the test conclusions, to confirm that there is no quality problems before acceptance. Instruments and equipment can only be accepted for handover procedures, delivery and use. (3) the use of the system in order to extend the service life of the equipment, give full play to its role, we must establish a system for the use of equipment, personnel, working environment, facilities conditions, maintenance, repair and other clear requirements to make provisions. (4) Record system Records is to establish a complete file of equipment to ensure that the normal operation of the equipment sales of a basic job, the implementation of the responsibility for the management of the equipment, the implementation of the system and the operation and improvement of the management program are very important. Each piece of equipment from the plan to purchase to eliminate should maintain a complete record of the content in addition to the general equipment files, should also be the acquisition of equipment, verification, maintenance plans, demonstration or report, commissioning and acceptance report, equipment use and calibration records, instrument failure and maintenance records, operating conditions, performance changes, anomalies and rectification of the situation. (5) Verification system Verification is an important initiative to confirm that the equipment meets the technical specifications and to avoid influencing the test results. Before and after the use of the instrument, the operator should take self-calibration, comparison and other methods to calibrate the main performance parameters in accordance with the technical specifications and instructions to ensure that the accuracy and range of the instrument meet the requirements. The quality management team shall regularly check the use and records of the equipment, etc. Verification procedures shall be formulated for newly purchased or leased equipment, equipment used for on-site testing, and equipment with frequent use or large drift, so as to keep the equipment in good working condition. Calibration and Verification of Instruments and Equipment Calibration (1) Definition of Calibration Calibration is a set of operations performed under specified conditions to determine the relationship between the quantitative values indicated by a measuring device or a measuring system, or the quantitative values represented by a physical gauge or a reference substance, and the corresponding quantitative values reproduced by a standard. The meaning of this definition is: ① To assign a value to the characteristics of a measuring instrument, including a reference material, under specified conditions, using a reference standard, and to determine the error in its indication. ② To trace the quantity value indicated or represented by a measuring instrument, according to the calibration chain, to the quantity value reproduced by the standard (2) Purpose of calibration ① To determine the error in the indication value and to be able to determine whether it is within the expected tolerance; ② To derive a reported value for the deviation from the nominal value, ...... >>
Question 4: How to write the acceptance opinion Consistent with the design and specification requirements agree to the completion and acceptance. Or directly write agree with it, sign the name of the person in charge of each unit, stamped on the official seal on the line.
Question 5: How to write the acceptance report of machinery and equipment equipment acceptance record
Xxxxxx unit XX year X month
First, the appearance of the inspection
1. equipment and packaging for the photographic record, check the equipment, whether the packaging is intact, there is no breakage, soaking, moisture, deformation and other conditions, the surface of the outer box and the encapsulation of the state to check;
The equipment is not only the equipment, but also the equipment, the equipment and the equipment, and the equipment. Check;
2. Check the surface of the equipment and accessories for damage, corrosion, bruises, etc., focusing on checking the impeller of the rotor for damage, the main components and the main working surface;
3. If you find that there is damage to the packaging, equipment and accessories have damage, corrosion, signs of use, etc., you should make a detailed record and focus on the photographs to retain the evidence in a timely manner to the supplier for the return of the replacement, claim procedures. Procedures.
Second, the number of inspections
1. Quantity inspection should be based on the supply contract and packing list, check the host, accessories and other equipment specifications, models, configurations and quantities, and piece by piece inventory check;
2. Check whether the random information is complete, such as manuals, certificates of conformity of the product inspection, warranty, etc.;
3. Serial number and factory number, if necessary, you can check online;
4. Carefully make a good record of unpacking and counting, write down the location, time, participants, box number, product name, should be to the actual number of real, such as found in shortages, misdirection and other issues, we must promptly make a record and retain the relevant materials.
Third, fill in the acceptance record table
1. Box acceptance is over, found that any one does not meet the requirements of the contract documents, must be recognized by the supplier's representative (signature, seal).
2. Write the equipment opening inspection record sheet, serial number and factory number, field photos as part of the equipment acceptance documents.
Equipment unpacking and acceptance record sheet
No.:
Question 6: How should I write the equipment acceptance report? First of all, the purpose and principles of acceptance, and then the composition of the acceptance team members, and then the acceptance criteria, and finally can be summarized
Question 7: *** Acceptance of procurement project acceptance of the acceptance of the opinion 1, clear procurement acceptance link status. Article 41 of the *** Procurement Law states: "The purchaser or his commissioned procurement agency shall organize the acceptance of the supplier's performance. For large or complex *** procurement projects, state-recognized quality testing organizations shall be invited to participate in the acceptance. The members of the accepting party shall sign the acceptance letter and bear the corresponding legal responsibility." Therefore, the acceptance of *** procurement performance is legally indispensable. *** Procurement management should further clarify the legal status of *** Procurement performance acceptance by increasing the publicity and enforcement of the *** Procurement Law and other laws and regulations, and incorporate it into the required procedures of *** Procurement. Specific regulations should be issued to clarify the responsibilities of personnel involved in acceptance. The centralized purchasing agency to handle procurement personnel and acceptance of personnel to implement a regular rotation system, to maximize the avoidance of backroom operations. The skills training of the purchaser's acceptance should be strengthened, and spot checks should be conducted periodically and irregularly to test the quality of the purchaser's acceptance. Procurers should also establish *** procurement acceptance files to increase the systematic management of acceptance work. Establish and improve the strict supervision and management system of procurement contracts, procurement contracts, procurement, procurement and acceptance of the implementation of the separation of each other, mutual constraints, clear *** Procurement of all aspects of the staff's responsibilities to prevent acceptance, supervision and lack of acceptance, acceptance of standards and methods should be in the bidding beforehand. 2, adhere to the combination of democratic management and public supervision. Acceptance of the unit organization *** procurement project acceptance to have procedural constraints, and the implementation of *** procurement project publicity, mass supervision system, publish acceptance results. Procurers should not only send staff representatives to participate in the organization of acceptance, but also from the project design, information dissemination, bidding procedures and the implementation process, so that all cadres and workers of the unit have the right to participate in supervision and exercise the right to speak. Problems found should be reflected to the procurement management organization in a timely manner, private negotiation with the supplier to change the winning bid, the results of the transaction, resulting in loss of self-responsibility, the financial sector once found will refuse to pay the relevant payment, and supplier performance in the assessment. No valid reason to delay or refuse to receive, acceptance and payment and other violations of contractual agreements, should also be held accountable. 3, improve the unsuccessful supplier supervision mechanism. Invite unsuccessful suppliers to participate in the acceptance, on the one hand, can verify the fairness and rigor of *** procurement, on the other hand, is also an effective means of strengthening *** procurement supervision. Because suppliers specifically participated in the project bidding activities, the project bidding process, construction procedures, configuration of the nuances have a more detailed understanding, especially the use of professional knowledge of suppliers, industry know-how is more able to play its effective role in monitoring, which is also a better supervision of the acceptance of the link. If the acceptance of the expected results, can let the supplier of the fairness of the tender heart, at the same time to participate in the future bidding and has a great role in guiding. 4, the establishment of a sound supplier assessment and registration system. For different degrees of dishonest behavior, the development of different penalties, in the acceptance of the link found in the supplier to provide products in violation of the Product Quality Law and other relevant laws and regulations, the transfer of industry and commerce, quality supervision and other administrative organs, in accordance with the law to implement administrative penalties. Establishment of integrity file management system, improve the market credit system of *** procurement. First, the establishment of supplier qualification access system. Purchasers, procurement agencies to meet the reasonable needs of purchasers as a prerequisite for suppliers involved in *** procurement activities for procurement market access qualification review, in particular, the supplier's compliance with the law, business reputation, performance performance, the ability to pay taxes in accordance with the law, and other basic conditions to focus on the review, the purchasing agency will be included in the supplier pool of qualified suppliers. The procurement agency will include qualified suppliers in the supplier pool. Suppliers with bad behavior in the course of performance will be prohibited from participating in *** procurement activities for a certain period of time, to ensure that suppliers who are "credible, promise-keeping, of good quality and excellent service" enter the procurement market under the same conditions, and enjoy non-discriminatory and non-discriminatory treatment to carry out fair competition in the procurement market, to avoid purchasers' irregularities and illegal behavior during procurement, to purify the procurement market, and to prevent purchasers' illegal behavior during procurement. Violations of the law, purify the procurement market, in order to ensure the efficiency and quality of *** procurement, safeguard the interests of the state and the public interest. Second, the establishment of a sound supplier integrity file. *** Procurement agencies should make a detailed registration and filing of the integrity status of all suppliers involved in *** procurement activities, such as compliance with the law, fulfillment of contracts, complaints, etc., so as to facilitate the strengthening of supervision by the *** procurement supervisory authorities. To continuously assess the supplier's integrity level, integrity level, service attitude, quality of supply, completion of the time limit, the level of qualification, enterprise size, financial status, etc., to establish a mechanism for the elimination of the fittest, and constantly absorbing fresh blood, eliminating the unqualified, to maintain the vitality of the supplier group and vitality. Third, the establishment of supplier performance quality guarantee system. The establishment of supplier performance bond system is one of the basic measures to protect the interests of the purchaser, it can use economic means ...... >>
Question 8: How to fill in the conclusion of the acceptance of the equipment The main building materials, building components and equipment of the incoming test report (including supervision and sampling) information Construction Safety Day V. Acceptance of the signature of the personnel: name work unit title position VI. Conclusion of acceptance of the completion of the project: completion and acceptance
Question 9: the certificate of acceptance of the completion of the project Acceptance opinion how to fill in Fill in the project whether it is in line with the design requirements, whether it is in line with the norms, the quality of the project whether it is in line with the acceptance specification, whether it is to meet the requirements of the safety of the use of the project.
Completion acceptance refers to the completion of the construction project development and construction units together with the design, construction, equipment supply units and project quality supervision departments, whether the project is wowed by the planning and design requirements and the quality of construction and equipment installation for a comprehensive inspection, to obtain the completion of the qualified information, data and vouchers. It should be noted that the completion of the acceptance is based on a phased acceptance of the project has been completed in front of the acceptance of the project is generally in the completion of the acceptance of the project will not be re-accepted.