1, the basic information: packing list, invoice, trade contract, consignee license
2, other information: customs code (confirmation), machinery and equipment front photos of the machine, machinery and equipment nameplate photos, machinery and equipment, a brief description of the Chinese condition of the consignor's business license, proof of payment of foreign exchange, certificate of origin (if necessary), fumigation and disinfection certificate (if wooden box packaging shows IPPC mark). (if necessary), original invoice (if necessary), fumigation and sterilization certificate (if packed in wooden crates, show IPPC mark.).
Specifications:
1. Import agent: issue a full set of import procedures, general trade import customs clearance, simple procedures, fast, the maximum extent of your cost savings.
2, for the import of electromechanical equipment license, for imported Hong Kong inspection, commodity inspection record and other formalities
3, on behalf of the signing of the contract: can be signed on behalf of your foreign foreign import and foreign trade contracts
Operation key:
1, machinery record: truthfully fill in the information on the equipment, to determine the consistency of the goods and documents for the smooth passage of the inspection to be prepared.
2, in the inspection: First, the location of the goods in the inspection, by the foreign inspection company to the location of the goods in the factory inspection, check the nameplate of the equipment, the degree of newness and oldness, the condition of the wires and cables, safety signs and so on. Second, the goods were sent to the Hong Kong inspection, before shipment, do a good job of cleaning and rectification of equipment, aspects of a one-time inspection through.
3, commodity inspection inspection: generally occurs after the inspection, if the port commodity inspection, basically to the state of the equipment after shipment, do not need to open the test, through a high rate; or commodity inspection transfer away from the location of the consignee of the equipment by the Bureau of Commodity Inspection Inspection, the consignee in the installation of the equipment, the Bureau of Commodity Inspection over to check the nameplate, safety signs, etc., may involve dynamic inspection, that is, the opening of the test.
4, customs valuation: customs valuation, as long as the market price of goods based on the time, with reference to the degree of new and old equipment, as well as the purchase contract, INVOICE, etc., our current operating cases, to 7 layers of new declarations, the pass rate of 90%.
About time:
1. Filing equipment: ordinary old mechanical and electrical 5-7 working days, key old mechanical and electrical 15 working days.
2. Automatic import license: 10-15 working days
3. Inspection: 4-7 working days
4. Freight time depends on the voyage.
5. Import customs clearance, 5~7 working days.