5 Simple Machine Rental Contract Templates

The machine should comply with the requirements of labor protection regulations, reduce the noise level when the machine is running, prevent the leakage of toxic and harmful media, and control waste water, waste gas and waste liquid. Below is a simple machine leasing contract template that I bring to you. To browse more machine leasing contracts, click "Machine Leasing" to view.

Simple machine rental contract template 1

Lessee: (hereinafter referred to as Party A)

Lessor: (hereinafter referred to as Party B) )

According to the "Contract Law of the People's Republic of China" and relevant regulations, in order to clarify the rights and obligations of both parties to the equipment lease, Party A leases Party B's construction machinery (attached table) according to the needs of the project. The two parties negotiated amicably and signed the following agreement on leasing machinery and equipment for mutual compliance.

1. Vehicle type: (see attached table)

2. Rental location:

3. Rental period: When Party B receives a phone call from Party A, The rental fee will be calculated from the date when the mechanical equipment arrives at the site designated by Party A, and the lease period will end when Party A formally notifies Party B to withdraw. If Party B fails to withdraw within the time limit specified in the notice for any reason, the rental fee will no longer be calculated.

4. Mechanical equipment leasing form and settlement method:

1. Party B rents the mechanical equipment to Party A on a monthly basis. The monthly rent is RMB: ___________ yuan/month , ________ yuan/hour, if the rental time is less than one month, settlement will be based on the actual number of days of use. Daily rent = monthly rent/31 days;

2. Party B is responsible for the freight incurred by the mechanical equipment during the lease period;

3. Rent settlement method: Party A will pay the rent every day in principle. The rental fee will be settled once to Party B on the 25th of the next month, and the rental fee for the previous month will be paid before the 5th of the next month. If Party A's superiors or owners do not allocate funds in place, Party B fully understands Party A's financial difficulties and agrees to delay payment relatively; if Party A needs to add more mechanical equipment, the additional mechanical equipment will be at the price specified in this contract, and the cost will be included in this contract. Payment is stipulated;

4. Party B must have a qualified driver with a valid local machine operation certificate and be on call 24 hours a day to ensure Party A’s construction needs. Party B is responsible for the driver's accommodation, wages, food expenses, etc.

5. Rights and obligations of Party A and Party B

1. During the lease period of the mechanical equipment, Party B’s machinery driver must obey Party A’s work arrangements, because Party B’s driver does not obey Party A’s arrangements , Party A has the right to request to change the driver and terminate the contract. Drivers are fully responsible for the safety of machinery and equipment and themselves during operations. Strictly operate in accordance with the operating procedures of mechanical equipment, and no violations are allowed. Otherwise, Party B will be responsible for all safety accidents caused by it at its own expense;

2. Party B is responsible for the repair, maintenance, fuel, auxiliary oil, etc. of mechanical equipment. and corresponding expenses, the integrity rate shall not be less than 28 days per month, and one day will be deducted from the monthly rent for every day less than one day to ensure the normal progress of Party A's project construction;

3. Party A provides the project construction site, and Ensure a good construction environment. Party B agrees that the construction site and environment provided by Party A meet the operating conditions of mechanical equipment;

4. The mechanical equipment provided by Party B to Party A must have complete procedures (certificate, technical inspection certificate, etc.). If the mechanical equipment is detained by the local government due to incomplete formalities, Party B shall be responsible for all responsibilities;

5. Party B’s mechanical equipment should ensure a clean appearance, good technical performance, normal operation, and meet the construction needs. When there is a fault and Party B cannot repair it within the specified time, measures should be taken in advance to ensure the normal construction of Party A's project;

6. Party B's mechanical equipment managers and drivers must obey Party A's management. Strictly abide by Party A's various management systems;

7. Party A has no right to sublease, auction, or mortgage Party B's equipment.

6. Liability for breach of contract:

l. Party A and Party B must strictly perform the terms of this contract. Without the consent of the other party, neither party shall change or terminate the contract midway. If one party violates the provisions of this contract, it will be responsible for compensating the other party for all losses caused thereby;

2. For all disputes related to this contract, Party A and Party B shall amicably resolve all disputes in accordance with the relevant provisions of the Contract Law and other relevant laws. Resolved through negotiation;

3. This contract is made in triplicate, with Party A holding two copies and Party B holding one copy. It will take effect from the date of signature, and each copy has the same legal effect. The contract will be automatically voided after the mechanical equipment is withdrawn from the site and settled.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day

Simple machine rental contract template 2

Party A (lessee):

Party B (lessor):

Party A rents a set of Zhonglian 280 rotary excavation machinery from Party B. After mutual negotiation between both parties, the following agreement is reached:

1. Lease time: October 7, 20__ - January 7, 20__

2. Construction location: Beijing

3. Equipment list: Zhonglian A 280 rotary excavator has a main engine, a machine locking rod, drill bit guard and other accessories, please see the list for details.

4. Rent settlement method:

(1) Party A must promptly pay the machine manufacturer a loan of 130,000 yuan every month, otherwise Party B will have nothing to do with the manufacturer's shutdown.

(2) Party A pays Party B a leasing deposit of RMB 100,000, and the cash withdrawal machine must be paid in one lump sum a few days ago.

(3) Party A must hand over a profit of 110,000 yuan/month to Party B after the project is settled.

(4) If tools need to be added after the equipment is brought into the site, Party A shall make arrangements by itself.

5. Relevant agreements:

(1) Party A is responsible for providing equipment operators, operating in strict accordance with the equipment operating procedures, and being responsible for the daily maintenance of the equipment.

(3) During the equipment rental period, Party A is responsible for the fuel costs, electricity consumption, and maintenance costs of the equipment.

6. Party A’s responsibilities:

(1) Party A must prepare for the entry of Party B’s equipment and provide necessary entry conditions.

(2) Party A must have a dedicated person responsible for guiding the construction of the equipment, but they cannot give instructions in violation of regulations. If Party A personnel give instructions in violation of regulations, Party A will be responsible for all losses.

(3) Party A shall be responsible for the safety of the equipment. Party A shall be responsible for the loss of equipment and spare parts caused by Party A’s failure to safeguard the equipment.

7. Party B’s responsibilities:

(1) Party B shall ensure that the technical performance of the mechanical equipment entering the construction site is intact.

(3) If Party B’s mechanical equipment breaks down, Party B shall actively cooperate with the organization personnel to carry out emergency repairs. If this affects Party A's construction for more than three days, the shift fee for that day will be waived after both parties sign.

8. Any outstanding matters shall be resolved through negotiation between the two parties. If negotiation fails, legal settlement will be resorted to.

9. This contract will take effect after being signed and sealed by both hands. There are two copies of this contract, with Party A and Party B each holding one copy.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_________year____month____day

Simple machine rental contract template 3

Lessor: ___________(Party A )

Lessee: ___________ (Party A)

Place of signing: ______________

Time of signing: ______________

According to the Contract Law , this contract has been signed through friendly consultations between both parties.

1. Equipment list_______________________________.

2. Rental period

1. Party A arrives on _____month_____day, _____year Provide rental services for the above equipment to Party B on _____month_____day of _____year. The lease period is _____ days, and the rent is _____ yuan/unit/day. Total ______________.(RMB)

2. After Party B decides to rent this equipment, he must pay an equivalent amount of the equipment as a deposit before he can withdraw the equipment. When Party B returns the equipment, the rent will be paid in full to Party A in one lump sum, and Party A will return Party B's deposit at the same time.

3. The time, place, method and acceptance of the delivery of the leased property: the lessor will hand over the leased property to the lessee at the place where the contract is signed, and the lessee will turn on the machine and inspect the physical goods on site. The lessee will sign this contract to express The leased property has been accepted.

3. Notes

1. Party B is not allowed to sublet during the lease period and cannot return the lease midway; Party B cannot dismantle or modify the equipment without authorization, and must use it properly and correctly to ensure that the equipment is in good condition. Otherwise, all losses caused shall be borne by Party B.

2. If Party B fails to sign a renewal contract with Party A, the lessee must return the rented machine on the _________ day after the lease period ends. If the lease is to be renewed, both parties need to sign a new lease contract. Party A has the right to take back the equipment and charge necessary overdue fees at any time after the contract expires.

4. Supplementary provisions

1. Compensation for expenses

If the lessee causes damage to the rented machine during use, compensation will be based on the following items:

(1) Shell: Damage does not affect the appearance. Compensation is _________ yuan; Damage affects the appearance. Compensation is ________ yuan;

(2) Lens/display: Scratches do not affect use_ _______ yuan; if the use is affected, compensation will be based on the market price;

(3) Damage to the light bulb/mainboard: ________ yuan (compensation will be based on the actual market price)

(4) Other accessories: such as If it cannot be repaired, compensation will be based on the market price;

2. If this contract does not describe in detail and needs to be supplemented, both parties shall negotiate to make supplementary provisions, which shall have the same legal effect as this contract. If any dispute arises during the performance, it shall be resolved by negotiation between the parties;

3. If there is no provision in this contract, the provisions of the "Contract Law of the People's Republic of China" shall apply.

4. This contract is made in two copies, with each party holding one copy. The contract shall take effect from the date of signature by both parties.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_______year____month____day

Simple machine rental contract template 4

Name of Party A: __________________

p>

Address: _______________________

Telephone: __________________

Name of Party B: __________________

Address: __________________

Telephone: ______________________

After friendly negotiation between Party A and Party B, Party B will lease the mechanical equipment stipulated in this contract to Party A according to Party A's requirements for use in Party A's project construction

In accordance with the "Contract Law of the People's Republic of China", relevant laws and regulations of national and provincial local government departments, and in line with the principle of honesty, trustworthiness, equality and mutual assistance, the two parties have reached the following contract terms.

1. Definition and explanation

1. 1. The project refers to: ____________________

1. 2. The contract represents the contract signed between Party A and Party B. Legal document of relationship.

1. 3 Party A refers to: ____________________

1. 4 Party B is a service unit whose quotation has been accepted by Party A. It is a company or other company that leases machinery and equipment and provides related services. Entity, person.

1. 5 Services refer to the obligations stipulated in the contract that the supplier must bear under the terms of the contract.

1. 6 construction sites refer to: _______________

1. 7 days refer to calendar days.

1. 8 Written refers to any handwritten, typed or printed correspondence, including stationery, documents and faxes.

2. Party A’s work

2.1 Party A shall notify Party B in writing (or verbally) of the detailed entry time, location and location of the machinery within 12 hours before the machinery enters the site. Other specific details.

2. 2 Tool room responsible for providing Party B’s operation and maintenance personnel with necessary accommodation (meals are paid by themselves). 2.3 Responsible for on-site safety management and safety education and task clarification of machinery operators, to prevent illegal command and illegal operations.

3. Party B’s work

3. 1. Complete the entry and maintenance of required machinery as scheduled according to Party A’s requirements.

3.2 Provide enough qualified maintenance and operating personnel according to Party A’s requirements and ensure that they are certified to work. The operators’ salaries and bonuses shall be paid by Party B themselves.

3. 3. Party B’s staff stationed at Party A’s site must abide by all on-site rules and regulations and obey Party A’s instructions and arrangements. For serious dereliction of duty and illegal operations, Party A has the right to notify Party B to replace them. , Party B shall immediately send qualified staff to work on site.

3. 4 Party B’s corporate image promotion at Party A’s site must comply with Party A’s relevant regulations.

3. 5. Ensure the operation of the machinery and ensure Party A’s construction and production.

3. 6 Provide Party A with relevant leasing qualification certificates and operation certificates of special operations operators.

3.7 Party B shall provide property insurance for the machinery.

3. 8 Party B shall take all measures required by Party A in the event of mechanical equipment failure to ensure the smooth progress of construction and production.

3.9 If any casualty accident occurs due to reasons not caused by Party A, Party B shall be solely responsible.

4. Name, specifications and quantity of rental machinery

Serial number____________

Equipment name____________

Specifications and models____________

p>

Quantity____________

5. Lease period

5. 1 Lease period____________

Serial number____________

Equipment name____________

Specification and model____________

Lease period____________

Quantity____________

Note: During the lease period, each You must work more than one shift in a month. If it is not reached, the settlement will be as follows: Actual working shift

× 80 days × Daily rental settlement amount

Prescribed working shift

p>

5. 2. If Party A needs to leave the equipment without using it, it should notify Party B 2 days before the planned termination of use. Otherwise, Party B can charge rent according to the rent standard stipulated in the contract.

5. 3. If Party A needs to extend the lease period, Party A shall propose an irregular lease extension to Party B 3 days before the expiration of the contract; if there are no special circumstances, Party B shall agree to Party A’s renewal of the lease, and the equipment rent shall be The price remains unchanged.

6. Maintenance of mechanical equipment

6. 1. Party B shall prepare a maintenance plan for the mechanical equipment during the lease period and perform equipment maintenance according to the plan to ensure Party A's project needs.

6. 2 During the lease period, Party B is responsible for the maintenance of the mechanical equipment and bears the corresponding expenses.

6. 3 Party B should perform maintenance on mechanical equipment in a timely manner. If Party B needs to maintain machinery, it must notify Party A in advance and try to arrange it on rest days or during construction free time.

6. 4 Party A agrees to arrange maintenance time for Party B in accordance with the maintenance procedures of mechanical equipment.

7. Maintenance of mechanical equipment

7. 1. Party B shall ensure that there is sufficient inventory of mechanical equipment parts to repair or replace unqualified parts in a timely manner to ensure the normal operation of the machinery.

7. 2. During the construction process, when a major accident occurs to mechanical equipment, the downtime shall not exceed 12 hours, and shall not exceed once a month. When a general failure occurs, the downtime shall not exceed 2 hours, otherwise the machine will Class fees will be deducted and fined as follows:

Obstacle time____________

Deduction____________

Fine____________

7 3. If a malfunction occurs and the downtime exceeds 2 hours, causing economic losses or project delays to Party A, Party A will file a claim against Party B while taking emergency measures, and may obtain compensation from rental fees or other means.

8. Fee calculation method

Rental unit price____________

Serial number____________

Equipment name____________

Specification and model____________

Rent____________

9. Payment method

Rent payment: Machinery rental fee will be settled based on the actual usage shift, from Party B’s From the date when the machinery is officially put into use until the machinery leaves the site, Party A will pay Party B a rental fee every time Party B's machinery is operated for a sufficient number of shifts, and the workload is calculated according to the machinery usage record sheet.

10. Liability for breach of contract

10. 1. If either Party A violates the provisions of this contract, it shall bear all losses caused by the breach of contract.

10. 2 If either Party A or Party B violates the provisions of this contract, it shall bear its own expenses and take timely measures to remedy the situation until the other party is satisfied.

11. Force Majeure

11. 1. When either party is unable to perform the contract due to the impact of a force majeure accident, the period for performance of the contract shall be extended, and the extension period shall be equivalent to the period affected by the accident. .time. Force majeure refers to an accident that cannot be foreseen by both parties when entering into the contract, and its occurrence and consequences are unavoidable and insurmountable, such as war, serious fire, flood, typhoon and earthquake, etc.

11.2 The affected party shall notify the other party in writing as soon as possible when a force majeure accident occurs, and submit the supporting documents issued by the relevant authorities to the other party for review and confirmation within 7 days after the accident. At the same time, the hindered party should continue to perform its contractual obligations as much as possible and seek reasonable solutions to perform other matters affected by force majeure.

11.3 Once the impact of a force majeure accident lasts for more than 30 days, both parties shall reach an agreement for further performance of the contract within a reasonable time through friendly negotiation.

12. Dispute settlement

12. 1. If a dispute arises between Party A and Party B, it should first be resolved through friendly negotiation. If an agreement cannot be reached within twenty-eight days (28 days) from the start of negotiations, the matter shall be submitted to arbitration.

12. 2 Disputes submitted for formal arbitration shall be finalized by the local arbitration committee in accordance with the arbitration procedures or rules of the committee.

12.3 The arbitration award shall be final and binding on both parties.

12.4 Unless otherwise awarded, the arbitration fees shall be borne by the losing party.

12. 5 During the arbitration period, except for the ongoing arbitration part, other parts of the contract will continue to be executed.

13. Termination of contract for breach of contract

If either party issues a notice of breach of contract to the breaching party within 2 days, if the breaching party fails to take effective measures to correct its breach of contract, it may terminate the contract in writing by notifying the breaching party. or part of a contract.

14. Termination of contract by bankruptcy

When either party to the contract becomes bankrupt or insolvent, the other party may terminate the contract by notifying the other party in writing at any time. Such termination shall not prejudice or affect the rights of the other party to any action or remedy taken or to be taken.

15. Termination of the contract due to a force majeure event

15. 1. If the impact of the force majeure event lasts for more than 30 days and both parties fail to reach an agreement for further performance of the contract within a reasonable time, both parties will The contract may be terminated by giving written notice to the other party.

15. 2 The supplier shall notify the general contractor in writing of all subcontracts awarded under this contract, but such notification shall not relieve the supplier of any responsibilities or obligations under the contract.

16. Others

16. 1. This contract shall be interpreted in accordance with the laws of the People's Republic of China.

16. 2 Any changes and supplements to the contract shall be in writing and must be approved by the other party to constitute modifications and supplements to the contract.

16. 3 Party B shall cooperate and support the work of Party A or a third party acting in the name of Party A.

16. 4 The communication between Party A and Party B shall be in writing.

16. 5 This contract will come into effect after it is signed and sealed by both parties.

16. 6 This contract is made in four copies, three copies for Party A and one copy for Party B.

Party A: __________________

Party A’s representative: __________________

Party B: __________________

Party B’s representative: __________________

Simple Machine Lease Contract Template 5

Lessor: (hereinafter referred to as Party A)

Lessee: (hereinafter referred to as Party B)_________________________

According to the "Contract Law 》, in accordance with the principle of equality and mutual benefit, and in order to clarify the rights and obligations of Party A and Party B, this contract has been signed by consensus of both parties.

Article 1: Name of leased machine:

Party A will lease the following machines to Party B for use according to the equipment and technical quality standards selected by Party B:

Machine name: Scraper type self-cleaning filter

Specification model: DFA__

Quantity: 1 set

Place of use: ____________

Article 2: Lease term and total rent

From _____7___month____9____, __20_________ to ____9____month____9____, ___20____, the total rent is 10,000. If required To continue renting, a new contract must be signed within fifteen days before the expiration of this contract. If Party B's actual usage period is less than two months, the rent will be calculated as two months.

After the lease expires, both parties do not renew the contract, and Party B does not purchase the machine under this contract and continues to use it

From the date of expiration of the lease, the rent standard The monthly rent shall be paid according to the standard monthly rent for the last month of the lease period stipulated in the contract. If Party B’s actual usage period is less than one month, the rent will be calculated based on the actual number of days of use.

Article 3: Ownership of the leased machine

1. During the lease period, the ownership of the leased machine listed in the attachment to the contract belongs to Party A. Party B only has the right to use the leased machine and has no ownership rights.

2. During the lease period, if Party B sublease the leased machine to a third party, Party B must obtain Party A’s written consent.

3. Party B shall not mortgage or guarantee the machinery and equipment for any reason.

Article 4: Calculation and payment of rent

1. Rent and calculation: Pay rent according to the standards specified in the "Machine Rental Quotation" attached to this contract in detail; if Party B actually uses If the term is less than two months, the rent will be calculated as two months.

2. Rent payment: On the day this contract is signed, Party B shall pay the first installment of rent to Party A so that Party A can prepare for the relevant leasing work. Thereafter, Party B must prepay the rent for the next lease period (or the next month) to Party A before the 10th of each month. If Party B fails to pay the rent on time, Party A will charge a late payment fee of 5% of the total overdue rent per day.

Article 5: Security Deposit

After negotiation between Party A and Party B, Party A collects a security deposit of _____30,000_________ yuan from Party B as a guarantee for the performance of this contract. Party B will go through the delivery procedures after paying the deposit and the first installment of rent. The security deposit cannot be used as rent during the lease period. At the end of the lease period, after deducting the damage compensation payable to the leased machine, the balance of the security deposit shall be returned to Party B.

Article 6: Delivery and acceptance of leased machines

1. The delivery location of the leased machines is Party A’s factory, and Party A will deliver the goods to Party B. Party A will not be held responsible if the delivery of the rental machine is delayed due to unforeseen, unavoidable and insurmountable objective circumstances.

2. Party B shall inspect and accept the rental machine at the delivery location within 24 hours from the time of receipt, and at the same time hand over the signed and stamped acceptance receipt of the rental machine to Party A.

Article 7: Use, repair, maintenance and expenses of leased machines

1. The leased machines will be used by Party B during the lease period. Party B shall be responsible for daily fuel, repair and maintenance, keeping the equipment in good condition, and bear all costs incurred therefrom. Party A is responsible for the maintenance and costs of machinery and equipment, but Party B will bear the maintenance costs caused by improper operation by Party B.

2. Party B shall bear all costs and taxes incurred during the installation, storage, and use of the rental machine.

Article 9: Damage and loss of the leased machine

1. Party B bears the risk of damage (normal wear and tear is not limited to this) and loss of the leased machine that occurs during the lease period.

2. When the rental machine is damaged or lost, Party B shall immediately notify Party A. Party A has the right to choose one of the following methods, and Party B will be responsible for handling it and bear all costs: (1) Transfer the leased machine to Restore or repair the machine to a fully functional state; (2) Replace the parts or accessories with the same model and performance as the rental machine so that it can be used normally; (3) When the rental machine is damaged or lost to the extent that it cannot be repaired, Party B shall Party A shall be compensated according to the selling price listed in the "Machine Rental Quotation".

Article 8: Liability for breach of contract

1. Without the written consent of the other party, neither party shall change or terminate this contract midway; any party that violates this contract shall pay the other party The total rental amount of this contract is RMB 20 as liquidated damages (i.e. RMB: _______ ________ yuan).

2. If Party B fails to pay the rent on time or violates any terms of this contract, Party A, in addition to holding Party B liable for breach of contract in accordance with the first paragraph of this article, also has the right to take the following measures:

(1) Confiscate Party B's security deposit and require Party B to pay all rent and other expenses in a timely manner;

(2) Terminate this contract, take back or require the return of the leased machine, and require Party B to compensate Party A for everything Losses, including but not limited to all expected rental profits upon completion of the contract.

Article 9: Dispute Resolution

All disputes arising from the performance of this contract or related to this contract shall be resolved by Party A and Party B through friendly negotiation; if negotiation cannot To resolve the dispute, it should be submitted to Shanghai Arbitration Commission Pudong New District Branch for arbitration or directly sued to the Pudong New District People's Court. The arbitration or litigation costs and the winning party's attorney fees should be borne by the losing party.

Article 10: Others

This agreement is made in duplicate. Party A and Party B each hold one copy. Both parties shall sign and seal the agreement and the agreement shall be signed and sealed by Party A after Party A receives the first installment of monthly rent and payment from Party B. Effective after deposit.

Lessee (Party B): Lessor (Party A): Legal representative: Legal representative:

Authorized agent: Authorized agent: Date: Date:

5 simple machine rental contract templates related articles:

★ 5 unit machinery rental contract templates

★ 5 latest machine shift rental contract templates

★ 3 simplified versions of personal machinery rental contract templates

★ 5 simplified excavator rental contract templates

★ 5 personal machinery rental contract templates

★ 3 simple templates of machinery and equipment rental contract

★ 3 simple templates of machinery and equipment rental contract

★ 5 templates of personal excavator rental contract

★ 3 simple templates of machinery rental contract

★ 3 simple templates of construction machinery rental contract