What are the instruments and equipment of Datang Baoding thermal power plant

Datang Baoding Thermal Power Plant instruments and equipment include:

1, boiler: including coal-fired boilers and gas-fired boilers, common equipment including furnace, flue, air preheater, dust collector, desulfurization and dust removal equipment.

2, turbine: mainly including reducer, turbine blades, rotor, generator and so on.

3, water treatment equipment: including water pumps, water treatment tower, polymer concentrator, phosphor cracking equipment, etc..

4, media transfer equipment: including feed pumps, circulating water pumps, blowers, induced draft fan, centrifugal fans, centrifugal pumps, etc..

5, control system: including DCS control system, PLC program controller, PID controller, SCADA system.