Installation budget summary of three
Part I: Installation budget summary
I. Calculation of the part (general)
1. In the calculation of the amount of work need to be categorized according to the specialty, and separate calculation of the amount of work of the division,
such as: 1 electrical specialties lighting, power, telephone, television, network, security, alarm, etc., respectively, by division calculation summary; 2 water supply and drainage specialties will be pump room, drainage, water supply, hot water, rainwater, pressure drainage, telephone, TV, network, security, alarm, etc.
1. The items to be listed separately, such as: bracket system security, electrical adjustment test, motor wiring and commissioning: supplement the main material cost of dry powder fire extinguishers, welding machines, etc.
2.
2. Do not need separate items but should be calculated according to the work content of the project such as: casing, disinfection and rinsing, hydraulic test, rust and oil, heat preservation, terminal wiring, wall trenching, punching holes, sporadic earth and stone, pipeline header, etc.,
3. Pay attention to the calculation of repair and decoration works need to be combined with the bathroom hand dryer, toilet paper boxes, mirrors, soap boxes, and other items
4. Quantity calculations need to be filled out by division, sub-division, classification, layering or section labeling, and will be super-high, pipe wells, insulation part of a separate list, in order to facilitate the preparation of lists or sets of quotas;
5. distribution box calculations, the box of terminals and cables written directly below the distribution box, the price of the price grouping to facilitate the calculation of the number of terminals and the additional amount of work, (made into spreadsheets automatically calculate the better)
6. > 6. Bill of quantities set price, pay attention not to omit the main structure adjustment factor. And fire hydrant pipeline commissioning fees, high fees, high-level increase in fees, scaffolding dismantling fees, as well as station type project commissioning fees.
Second, the electrical part:
1. Calculation of piping, pay attention to the height of the floor to facilitate the calculation of the length of the vertical pipeline, wiring pipe and dark wiring pipe according to the specifications of classified calculations, Note: Ming piping along the walls of the quota has been included in the bracket laying, piping bracket within the ceiling need to be calculated separately,
2. Electrical equipment distribution box for the equipment comes with the installation and commissioning costs are only calculated. (such as frequency control debugging), the unit price of the main equipment is included in the corresponding equipment offer, (the need for plumbing, electrical and heating drawings cross-referenced)
3. ground radiant heat of the project calculations piping, pay attention to increase the thickness of the floor accounted for by the ground radiant heat
4. cable in the pipeline wells, pay attention to the well is a vertical channel, if the floor of the electric well set up within the vertical bridge laying cables, the sets of vertical channel Cable laying.
5.10KV overhead lines in the hills, the concept of mountains; hills is 1KM within the topographic relief within 30 ~ 50m of the zone, the general mountainous area is 250m within the topographic relief within 30 ~ 50m of the zone.
6. Bill of quantities set price needs to be supporting the calculation of the amount of work:
Distribution box (box terminal wiring, floor-standing with a foundation channel steel production and installation);
Motor (motor check wiring, debugging) Note that the equipment set configuration of the motor does not do debugging
Lightning protection grounding (high-level aluminum windows and doors grounding, cross-connection, testing, equalizing the pressure ring, isotonic debugging, etc.) bus bridge (bridge) (etc.) bus bridge (bridge accessories, bracket system installation, plug box installation, commissioning) plug bus does not do debugging cable (protection pipe, cable head, multiplication factor, fire prevention measures, excavation, paving sand cover brick)
Wiring (distinguish the type of pipe or bridge laying)
Third, water supply and drainage part:
1. Pipeline list pricing, supporting waterproof casing according to the diameter of the pipe, general steel casing according to the diameter of the pipeline calculation, the pipe diameter is calculated. Calculation, general steel casing according to the body of the pipe two large calculation.
2. In calculating the amount of pump room, some drawings only illustrate the location of pumps, no detailed drawings, you need to refer to the standard drawings to calculate, and consider each pump 4 shock absorbers, two pumps connected to the size of the head, two soft joints, a check valve, two isolation valves, a relief valve, a pressure gauge, and grouting of the pump foundation, etc.; hot water pumps with thermometers, water processors; sewage pumps have level controllers. If the civil engineering map without pump foundation, to calculate the steel support.
3. In the calculation of heat exchangers or containers to consider supporting thermometer, pressure gauge, exhaust drain valve, insulation, bracket, disinfection and flushing, pressure test, in which the thermometer should be calculated to support the casing, the pressure gauge should be calculated to take the source of the annex with the installation and pressure gauge bend installation. Container water pressure test, water flushing, insulation and so on.
4. Note that when calculating the amount of piping work, indoor piping has included a stent system security, outdoor piping stents to be calculated separately.
5. Note that the water supply plastic pipe set quota by De outside diameter, drawing design is generally DN (engineering diameter) diameter.
Fourth, the HVAC part:
1. Duct system calculations need to be deducted from the length of the various components (a variety of regulating valves, mufflers, static pressure box, fan)
2. Duct bracket quota has been included, but the bracket of the rust and oil brush to be calculated, if the design of the air ducts, oil brush to be calculated.
3. 1 automatic exhaust valve, 2 control valves, 1 electric two-way valve, 1 filter, a thermostat,
4. 2 automatic exhaust valves, 2 pressure gauges and thermometers, 2 control valves, 1 electric regulator valve, 2 flexible connectors, 1 filter, a thermostat, bracket, air-conditioning unit calculations are taken into account. The system is safe.
5. Cooling tower calculations take into account two supply and return control valves, electric valves, make-up valves, relief valves, float valves.
6. fan or air-conditioning unit installation should pay attention to the fan shock absorber, canvas soft connection, equipment bracket system and rust brush oil.
7. cabinet fan box according to the centrifugal fan set quota.
8. plate smoke vent, positive pressure air supply, the use of electric devices to set the fire damper installation project. If there is no manual to have a control valve installation project. (Note that such air outlets are generally combined)
9. Rectangular duct when the side length is greater than (horizontal side length) "$ 2 must be set up when the guide vane
10. Multi-coupled air conditioner applies to an outdoor unit with multiple indoor air conditioning unit outdoor unit installation, the indoor unit set of fan coils (wall-mounted) installation; the use of non-aqueous refrigerant need to be calculated according to the actual needs of the other.
11. human defense closed casing: Ⅰ type closed casing: for sampling pipe, pressure pipe and compressed air pipe and tin duct directly poured into the concrete wall casing, Ⅱ type closed casing: for tin duct is not directly poured into the concrete wall casing, Ⅲ type closed casing: duct through the casing of the brick wall, the fixed amount does not include plugging the hole cost, the implementation of the civil construction quota.
12. Split air conditioner installation, including the installation of indoor and outdoor units.
V. Municipal Installation:
1. street lamps should be noted when calculating: excavation earth for the foundation of the lamp, lamp base, lamp pole, lamp frame, light source, lead wires, terminal board, terminal board wiring, grounding electrode, grounding across the price and grounding electrode debugging
2. Lamps height greater than 10 meters, the cost of labor * 1.4 coefficients, note that the ground material adjusted to the current market price.
3. Municipal pipelines and petroleum specialty pipeline installation need to be separately calculated to connect the pipe fittings, flanges, bolts and so on. After the completion of the budget self-check procedures
I. Budget
1. Supplementary material quantities. Unit price . Content
2. System commissioning fee for each booklet
3. Price adjustment coefficient for each booklet (see table)
4. High-rise increase fee, super-high fee. Main structure coefficient
5. Labor increase e.g. Shaanxi (232 and 22 documents)
6. Increase in material cost in foreign countries
7. Different tax accrual rates in different places.
2. Measurement fee
1. Scaffolding E&D
2. Environmental protection fee
3. Fee schedule
1. Check that the fees and charges are consistent with the bidding documents (keep it in line with the civil construction)
2. Pay attention to whether the fixed test fee is charged or not, and pay attention to the deduction or not of the pension insurance co-ordination.
3. Whether the loan interest is credited or quoted independently
4. Statements
1. Preview of the statement of the main material
2. Preview of the statement of the comprehensive unit price (check the comprehensive unit price one by one)
3. Preview of the table of the main material
4. The last item of the subheadings sorted
Part II: Installation Budgeter 20xx annual work summary
xx Engineering Company Limited Operations Department Installation Cost Clerk: xx
I was recruited in July 20xx through the recruitment, and became the installation cost clerk of the Operations Department of xx Engineering Company Limited. In the blink of an eye, we are going to wave goodbye to the year 20xx and welcome the brand new year 20xx! Years in a hurry, counting the days to this big family has been half a year. In the care of the leadership and colleagues to help support, better complete the work of the task, now in the company's work in this six-month summary is as follows:
First, the work of
(1) late July - early August: xx project construction drawings budget (completed 2 # installation project measurement).
(2) early August: xx project bidding, xx strong electrical system project volume clearing.
(3) late August: xx installation project measurement, mainly responsible for water supply and drainage system, weak power system.
(4) early September: xx installation project pricing (water supply and drainage, weak electricity), xx project bidding.
(5) late September: xx installation project bidding, mainly responsible for the triple play system, monitoring system, visual intercom system.
(6) in early October: xx project electrical engineering new volume calculation.
(7) the second half of October: xx second liquidation of water supply and drainage, fire protection project new volume.
(8) early November: xx site construction bidding. Mainly responsible for water supply and drainage system measurement and pricing.
(9) late November: xx project completion settlement measurement and pricing.
(10) early December: xx audit fire engineering subcontracting unit measurement and pricing differences, summary data discrepancy analysis.
(11) late December: xx project change visa clearance, measurement and pricing. Summarize the visa changes required
volume and price.
Second, the ideological
can comply with the rules and regulations, solidarity with colleagues, pragmatic, optimistic, always maintain a rigorous and serious work attitude and meticulous work style, hard work, hard work. In life, carry forward the good tradition of hard work, hard work, thrift, and willingness to help others, always do honestly, hard work, hard work and simple life, in strict accordance with the company management system of Sichuan Likoda Electrical Engineering Company Limited to restrain themselves.
Third, personal knowledge
Through the above work, appreciate the importance of the work of the Ministry of Operations, while clearing their own work responsibilities, the pre-settlement, bidding work has a more profound understanding of the work: the work of each of the problems found in the work, I will seriously analyze, to come up with a reasonable answer and strive to the shortest possible time, the answer is the most reliable. Work in time to find their own shortcomings, for their own more than two years of experience in auditing and pre-settlement, these are still just beginning, the new construction process and construction standards, there are still a lot of unknowns in the future work I will strive to contact with the actual, contact with the construction site, learn more knowledge of the regulations. For a costumer is not purely drawing work, should be on each construction link, each construction process, as well as a variety of construction organization measures should be very familiar with, should be skilled in the application. Only to see more knowledge, constantly learning new techniques, new materials, learning more construction measures experience, combined with the actual in order to make a more accurate, more competitive offer. Therefore, the comprehensive unit price of the bill of quantities should be combined with the bid evaluation criteria to decide, as far as possible to reduce the bid price. But to do a reasonable not to exceed the price and consider the settlement of its stop price can keep the cost.
For the budget work, to make accurate and rapid quotation. Only familiar with the site, familiar with the construction process, know more construction measures, is not enough to achieve rapid and accurate requirements, but also focus on the accumulation of experience, so I put forward a request for themselves: for each project they do, to "try" to analyze, "try" is to strive to perfect and strive to be detailed, "try" is to strive to perfect and strive to be detailed. "Do your best" is to strive to perfect and strive to be detailed. In the future work, serious calculations, serious thinking, serious summary, seriously organize and analyze the data, I believe that the improvement of their business level will be of great help.
The above is a summary of my work in 20xx, and future work prospects and arrangements. The new year means a new starting point, new opportunities, new . Challenges, we will definitely correct the past deficiencies and shortcomings in the new year, improve their own ideology and knowledge and skills. Of course, in the new year I will also be more attentive to every thing, and strive to develop and progress together with the company!
December 24, 20xx
Part III: Engineering budget officer personal work summary A, as a budget officer of the Ministry of Engineering, I can according to the company and the Ministry of the project of the various & gt; rules and regulations, on time and quality to complete the project of the Ministry of the various business management. 1, the internal work situation. According to the company's rules and requirements, the end of each month, the statistics of the month's actual construction output value and cost analysis. Timely participation in the cost analysis meeting, the monthly profit and loss of the project department to make an analysis of the report, for the construction stage of the budget to the actual situation of each floor of each sub-item of the project for the preparation and printing of all the material analysis, as a quota of labor and the quota of materials issued to the production manager, in the actual construction process, according to the actual situation of the site, the quota preparation of the material content of the level of the appropriate scientific rationalization of the adjustment, the quota of the material content of the high and low, and the quota of the actual construction process. Scientific rationalization of the adjustment, the quota of human work for the project task list for the control and distribution of the basis of labor, the quota of materials as a warehouse for the basis of the quota of materials. Usually in the work always actively cooperate with the project manager for contract management, participate in some subcontract negotiations, according to the company's regulations and combined with the actual situation of the project department, draft some subcontracts, subcontracts signed, subcontract tracking management, the beginning of each month to complete the project department of the last month's actual construction of the assigned tasks (including subcontractor's coarse distribution), quota material statistics, and submit the relevant reports to the company, the end of each month, the actual construction of the assigned tasks (including subcontractor's coarse distribution), quota material statistics, and submit the relevant reports to the company, the end of each month. At the beginning of each month, the project department completes the actual construction assignment of the previous month (including rough assignment of subcontractors), statistics of fixed-rate materials, and submits relevant reports to the company. At the end of each month, the department submits the main material plan of the next month to the company, anticipates the construction output value of the next month and the cost of each item, and prepares the cost guarantee measures of the next month. In the process of construction, implement the fixed amount of material and cost tracking control, provide some rationalized guarantee measures for the cost control of the project department, provide some business information and data for the project department in time, and do the cost accounting work of the project in time. Participate in the meetings of the project in a timely manner, according to the company's > rules and regulations for duty, etc.. 2, external (to the owner and supervision) of the work situation. At the end of each month to the owner and the supervision of the construction progress report submitted to the basis for payment of progress payments, timely verification of the amount of work with the investment supervisor, the progress of the output value is determined in a timely manner to cooperate with the project manager to urge the owner to pay the last month's progress payments. Timely to the owner of the project visa, do some claims project, especially some of the project materials offer, in advance to the owner and the supervision of the offer, so that the owner review, I construction materials can be purchased in a timely manner, so that the smooth construction of the project. In short, in the business policy to adhere to the highest income, the lowest expenditure. Internal work in a timely, accurate, factual, grasp the quota, control the amount; external work information is complete, with will, deal with the owners, supervisors and builders of the relationship, sometimes encountered some difficulties, timely contact with the leadership to report, in order to find a better solution to the problem, for the company's maximum profit. Second, actively do a good job in the audit of the project. Third, obey the company's leadership of the work arrangements, and actively do a good job outside the project department. I always take the big picture into account in my work. In the work of the company's active participation in the bidding work and other budget work. Regardless of their own project department in the hands of the work of how busy, always obey the company's leadership of the work arrangements, when the project department of the event is more, I always work overtime, reasonable, scientific use of time, not only to complete the project department's share of the event, but also to complete the task of the company's arrangements. Fourth, actively adapt to and comply with the implementation of the company's management system reform, and further strengthen the sense of responsibility. This year, the company's various & gt; rules and regulations have been improved or further improved, I always actively adapt to this situation, to the company's various existing & gt; rules and regulations and the professional ethics of the budget officer as a guideline to strengthen the sense of responsibility for the work, and timely and good job in my work for the enterprise to do the best I can to serve the work. Fifth, the use of rest time after work to enhance learning. Usually pay attention to the collection of Fuzhou City, the current quota information and documents, and strengthen the learning skills of calculating the amount of work and other business knowledge. Efforts to learn computer knowledge, improve their work efficiency. Usually pay attention to the collection of information about the current quota data files and market information materials, and strengthen the learning skills of volume calculation and costing software use and other business knowledge, and constantly improve their efficiency and obligation to work hard. The above is my rough annual personal & gt; work summary, please leadership review, such as work on the less than, please leadership do not begrudge pointing out, so that I can correct in a timely manner so that I can work better.