The work of the unit to summarize the model 5

Work summary is a time period of the work of a comprehensive and systematic total inspection, total evaluation, total analysis, total research, and analyze the shortcomings of the achievements, so as to draw lessons learned. In order to facilitate your learning, the following I have carefully prepared a unit work summary sample content, welcome to use the study!

Unit work summary sample 1

20__ years, is the Bureau to carry out the creation of "safe unit" work of the third year. In the county party committee, under the leadership of the county government, in the county political and legal committee under the specific guidance of the Bureau from the central work around the service county party committee, the creation of a safe Fengqing the overall situation, conscientiously implement the requirements of the county party committee, the county government, and actively carry out the creation of a "safe unit" work, a better completion of this work task.

First, the main practices and achievements

(a) timely adjustment of the work organization. Due to changes in the leadership of the Bureau, I timely adjusted the creation of "safe unit" work leading group. In order to effectively grasp this work, the leading group has met three times to study, set up the work, to ensure the creation of "safe unit" work.

(b) seriously organize information, good publicity, awareness, unity of thought, concerted efforts to create a "safe unit". As of December 12, 20__. I **** held a special meeting or at the meeting to create a "safe unit" activities 3 times. At the meeting, the organization studied and publicized "on the county to carry out the creation of" peace Fengqing "activities such as the decision" and other documents and related materials **** 7 pieces. Continuous publicity, and constantly improve the creation of "safe Fengqing", "safe unit" awareness of the significance of the county party committee, the county government to unify thoughts and actions, consciously carry out this work.

(C) the necessary education and management of personnel in the area. In addition to the Bureau of personnel and their families to carry out education and management, I also live in the Bureau of the courtyard of the five families to contact and communicate, register and do the necessary management. In their cooperation, to achieve no security cases, no drugs, no cults and other peace creation goals.

Second, there are shortcomings

(a) due to insufficient sources of funding to improve the function of the house burglary is not yet adapted to the reality of the social situation.

(b) The practice of creating "peace" is not standardized enough.

Third, the future intention

The next year, to seek more advice on the practice of the county party committee on political and legal affairs, to receive guidance, and further standardize the practice.

To increase the anti-theft efforts, in order to strengthen the personnel on duty to prevent at the same time, to fight for sufficient funds to further strengthen the house doors and windows.

To establish a good joint defense with neighboring units and communities. Through continuous exploration to improve the creation of "safe unit" level.

unit work summary sample 2

Since my county to carry out the garden county, garden towns, garden units, garden district creation activities, I attach great importance to the Office of the timely arrangements for the deployment, the rapid establishment of municipal garden units to create the work of the leading group, a clear person responsible for the work of the implementation of the work of the initial realization of municipal garden units, the standard requirements for the creation of the standard. Unit creation standard requirements. Now the creation of work is summarized as follows:

First, the basic situation

_ _ organ was built and put into use in 1997, covering an area of square meters, including green space area of square meters, accounting for %. Organs within the courtyard *** 16 units, cadres and workers 265 people. 1999, was named the municipal civilized organs; 20__, was named the provincial civilized machine; 20__, was named the provincial health advanced unit.

Second, the creation of work

In the ___ organs of the office building design and construction stage, on the greening of the yard carried out a full study and planning, to ensure that the latter part of the garden construction of the organs of the compound has laid a solid foundation. After the office building was built and put into use, around the greening and beautification work of the compound, from 1997 to 1999 three years, has invested more than 300,000 yuan, the purchase of camphor, cherry blossom, magnolia, osmanthus, landscape bamboo and other tree species and a large number of potted plants, leveling the green space, planting trees and grasses. From 20__ to 20__, we also made small-scale adjustments to the unreasonable greening, changed the lawn to ground cover of safflower grass and maitake, adjusted the green gracilaria, increased the number of osmanthus trees, and planted creepers along the fence. In recent years, we have also renovated and replanted all the lawns, transplanted some trees, removed the dry toilets in the corners of the compound, and planted orchids and flowers. Nowadays, the courtyard is full of lush trees, green grass, birdsong and flowers, and a pleasant environment. Especially in the season of Dan Gui, full of laurel bloom together, walking in the courtyard, bursts of flowers, refreshing.

This year, the county to start the municipal gardening unit since the creation of activities, we grasp this opportunity, and double the work and consolidation of the provincial health advanced units closely integrated, from the grasp of the system, grasp the norms, grasp the perfect, grasp the taste of the four aspects of the start, to further strengthen the ___ institutional compound environmental construction and management, and constantly improve the level of gardening. First, grasp the system. In the office organ of the original management system, based on a special revision of the "___ organ greening health management system", and formulated the "___ organ greening management standards", according to the standard operation, according to the system of work, so that the organ to create municipal gardening unit work to follow the rules and regulations. Second, grasp the standardization. The office set up to the main leader as the leader, the director of the organ logistics services management as deputy leader, the relevant personnel as members of the creation of municipal landscaping unit working group, clearly defined the duties and tasks of each member of the composition of the staff, so that everyone consciously in accordance with their duties, in accordance with the system, follow the standards, standardize the operation. Third, grasp the perfect. Adhere to the creation of municipal gardening unit work as a guide, and constantly found that the management of the organ of the various problems that exist in the work of the organ, and constantly improve the organ of the environmental health of the work of the deficiencies and weaknesses, so as to further improve the system, improve the management. Four is to grasp the taste. Actively learn from other local authorities to learn from advanced management experience and practices, research and improve the layout of the organ environment greening, science to create a healthy, beautiful and comfortable working environment, and vigorously enhance the organ compound gardening construction grade and grade.

Through the implementation of the above "four grasp" measures, the creation of municipal gardening units of the agency compound work began to step into the standardized track, the creation of work in an orderly and smooth.

Third, the future work intentions

The creation of landscaped units is a long-term work, is a direct service to the vast number of cadres and workers in the health of the organization's work and life of the "people's livelihood projects", must be unremittingly long grasp. To increase publicity, so that all cadres and workers fully understand the necessity and importance of creating gardening units, consciously abide by the environmental health management system, *** with the care, support and participation in the creation of the work, and make concerted efforts to create a good working and living environment of the authorities. Second, to increase investment, and actively seek more support, scientific optimization of the organ compound flowers and trees varieties and layout, increase infrastructure repair and transformation efforts to improve office conditions. Third, to strengthen the inspection, in adherence to the weekly environmental health of a centralized inspection at the same time, in accordance with the organ green health management system to strengthen the usual supervision and inspection, the criticism of the criticism, the notification of the notification, to ensure that the system is in place, and make every effort to promote the creation of municipal landscaping units continue to a higher level of development.

Unit work summary sample 3

In the group company and the development of the company's leadership of the strong leadership and related colleagues under the collaboration and supervision of the Limited Company, Xinguang Construction Engineering Supervision and Consulting Company's **** with the efforts of the residential district project to be carried out smoothly. I work in the real estate development company project engineering department, strictly abide by the laws and regulations, comply with the company's rules and regulations, usually strict requirements for themselves, clean and self-disciplined. Dare to take responsibility for the work, there is a conscientious and responsible spirit, there is a certain degree of organization and coordination skills, can be theoretically linked to practical work, and comrades collaborate with **** things, a heart for the company, better completed the annual annual work objectives. Now the first half of this year, residential project project management work is reported as follows:

First, the completion of the progress of the project:

Building since January this year, since the foundation construction to the end of June has been constructed to the main structure of the 16th floor,*** counted the construction period has been 7 months, accounting for 44.8% of the total construction period (the total construction period of 16 months); 2 # building since January this year, piling started to the end of June has been constructed to the main body of the structure of the 16th floor. Since the end of June has been constructed to the main structure of the 7th floor, *** counted construction period of 6 months, accounting for 30% of the total construction period (total construction period of 20 months, including the overall); according to the construction of the total progress plan, 1 #, 2 # building construction period in the plan, no overruns, out of time.

Second, the project investment situation:

Building according to the construction drawings budget, the project cost budget of 29.37 million yuan, by the end of June this year has been completed steel reinforced concrete piles, enclosure mixing piles, earthworks, basement foundations, basement structure, structure of the first floor to the fourteenth floor, the construction investment review of 13.65 million yuan, accounting for 46.5% of the total cost; 2 # building according to the construction drawings budget. Project cost budget of 34.48 million yuan, by the end of June this year has been completed reinforced concrete piles, enclosure mixing piles, earthworks, basement foundation, basement structure, structure of the first floor to the sixth floor, construction investment review of 10.69 million yuan, accounting for 31% of the total cost.

Third, the project construction process control management

Under the leadership of the company is responsible for the project's cost control, engineering progress, quality management technical support and project management work. Responsible for the implementation of the project's schedule, quality, safety, cost and other plans. Organization, coordination, control and decision-making, the implementation of the whole process of dynamic management of the production and construction elements. Engineering construction process, in strict accordance with the design requirements, acceptance specifications, regulations, supervision and inspection of project quality, cost, progress, safety and other work.

(a), the project organization and management:

According to the characteristics of the project, the preparation of the project project management planning: first of all, to clarify the project organization and management system, the main duties of the project engineering department, to determine the purpose of the project management tasks, the development of the project's four major overall objectives (quality, progress, investment, site) construction process control focus; the development of the project management work procedures. In the group company and the development of the company under the strong leadership of the leadership and the collaboration of relevant colleagues, so that the project can be carried out smoothly, through the weekly regular meetings of the group company to report on the progress of construction and the need for the company to coordinate the matter, listen to the company's next step in the work plan, the implementation of the spirit of the company's meetings, the timely implementation of the company's relevant decisions; through the weekly project engineering meetings to coordinate the various tasks, solve the conflicts in the daily construction, and strengthen mutual understanding of the project management work. Daily construction conflicts, strengthen communication between each other, timely and effective control of the project quality, progress, cost, safety and civilization.

(2), project quality control:

Quality management, the project focuses on three links: to establish quality objectives, determine the quality of pre-control program; product formation process control; acceptance control.

1, determine the quality of pre-control program. The company puts forward "build high-quality projects, tree boat base brand" quality objectives, the project department around this goal to do the target responsibility breakdown. Such as: the project leader, according to professional decomposition of quality responsibility objectives: civil engineers responsible for structural engineering; water and electricity equipment engineers responsible for pipeline. According to the stage of the project to break down the stage objectives, such as: the sub-project good rate of not less than 85%, the main body of the good rate of 100%, the monomer good rate of 85%, and according to this quality objective to develop the relevant acceptance methods and acceptance objectives, before the start of the project, to the supervisory and single subcontracting units to clarify the objectives, acceptance criteria, and so on. We also finalized the supervision outline and the construction organization design of the main subcontracting unit. Put forward improvement requirements for the weak points of the supervision and construction units in energy saving, intelligence, quality disease prevention and control, and assist them in perfecting the construction techniques and measures. Organize manufacturers of new materials and new technologies to teach the Party A, supervisors and construction units the characteristics of materials, construction technology requirements, quality inspection methods, etc. on site. Organize experts, quality supervision station, manufacturers, supervisors, construction seminars on material performance, construction technology, quality assessment and acceptance methods, to determine the final pre-control program.

2, the process of product formation control. At present, construction products are still mainly completed by hand, so product quality will inevitably appear larger deviations. The process control of product formation is the implementation of all the pre-control program, will directly affect the quality objectives can be achieved, affecting the project brand and corporate brand.

In the process control, we mainly through the following management to achieve: First, play the role of supervision in quality management functions, the supervision of full authorization, effective supervision. Strictly in accordance with the powers and obligations specified in the supervision contract, supervise the grass-roots supervisors whether to carry out quality management in accordance with the supervision outline and Party A's corporate standards.

Secondly, strictly control the quality of raw materials. The company first of all on some of the main material suppliers to give choice, directly ordered from the manufacturer, to reduce the intermediate links, to prevent the circulation process may appear counterfeit and shoddy products. The project department accepts the quality, quantity and specification of the incoming materials and supervises the on-site sampling and delivery to check whether the incoming materials meet the contract requirements. For the self-purchased materials of the general subcontracting unit, the main thing is to strengthen the inspection of the materials on site. First, through the supervision of the daily witness sampling of material quality inspection supervision; Second, the project department of the site material inspection, on the suspicious material, the first deactivation of sealing, and then sampling and inspection, to rule out the doubt before use; Third, the project team of civil, water and electricity engineers to do professional inspections, on the suspicious material, on-site sealing, to expand the number of samples, outside of the specification, to do an independent test; Fourth, the determination of unqualified materials, to take sealing

Furthermore, the project department in accordance with the contract and the relevant state laws and regulations, the general subcontracting unit to strengthen quality management. General subcontracting unit is the producer of the product, their work directly determines the quality of the product, in fact, the workers of the construction unit is basically closer to the operating skills, and the difference in the quality of the product is mainly the difference in the level of management. So in the management of the total subcontracting unit, mainly to grasp its quality assurance system construction, play the role of quality assurance system in quality management, as well as to strengthen the total subcontracting unit with the first person in charge of the field project manager and communication and organization of the field standard area for horizontal visits, complement each other's strengths and weaknesses, and to strengthen the sense of competition in the market, the awareness of the team and the awareness of the brand, and to pay attention to the quality of management from the ideological point of view. And then the project team in the daily management focus on quality inspection, quality tracking, and combined with the stage of construction, the organization of a number of targeted quality management activities, the effective use of regular engineering meeting system, speak of the problem, mention the problem, solve the problem. On-site management, we also emphasize the sense of service, to create conditions for the production of quality products for the B side, to provide technical support, management support.

3, product acceptance control, we always bear in mind Chairman Huang: "project quality is the life of the enterprise" this instruction, focusing on two levels of acceptance:

The first level is the total subcontracting unit quality assurance system of self-checking, self-inspection, self-checking the three-level acceptance system. At this level, mainly rely on the management of the general subcontracting unit to realize, strengthen the process inspection system and hand sequence, a report failed parts, processes and then start from the self-inspection, re-entering the acceptance process.

The second level is the supervision and acceptance of the project department. For different stages of construction, different systems to take the corresponding acceptance methods and methods, in the main construction stage, the main process of acceptance, this part is directly related to the structural safety of residential products, therefore, we are not only on the general subcontracting unit of the re-inspection according to the relevant provisions of the scale of the acceptance, but also the process of the process of the bystander supervision, so as to achieve the quality of the main formation of the process of the clear in the chest.

(C), the project progress control

1, the main construction stage of the progress management is relatively simple, according to the construction of the total progress plan to develop a phased progress plan, clear work content, order of work, duration and the work of the relationship between each other and put it into practice, and then in the implementation of the plan to frequently check the actual progress according to the plan, once found that the deviation occurs, should be analyzed in the analysis of the work, and then the actual progress of the project, and then the actual progress of the construction of the project. Once deviation is found, effective measures should be taken on the basis of analyzing the reasons for the deviation to remove obstacles or adjust and modify the original progress plan before putting it into practice. The ultimate goal of progress control is to ensure that the project is commissioned at the scheduled time or delivered in advance. The project department in the progress control of the work done are: the preparation of project management planning, study of the project's overall progress, construction layout, major construction techniques and construction problems, the implementation of the project may appear in the process of the problem to do a good job of planning. Develop a set of systems to standardize management to improve efficiency.

2, review and confirm the supervision engineer reported by the contractor to do the construction organization design and construction schedule. Require supervision engineers to do a good job of supervision planning, planning, organizational design and progress control of the work system and progress control work implementation details, and supervise the supervision engineers in the process of implementation of the project efforts to implement.

3, hosting meetings to study the various aspects of the implementation of the contract related issues, to participate in the supervision of the engineer presided over by the relevant coordination of the research meeting, involving the progress of the project to put forward timely solutions to the relevant issues and through the supervision of the engineers to implement the necessary means of construction, construction resources, construction organization up to the contract duration of the adjustments.

(D), the project investment control:

The project department of the project investment control has a very important responsibility, because the project department is managed by the source of the problem. Project Department of the investment control content is mainly to review the construction budget volume, dealing with changes and visas, that is, the management of the "project implementation control price".

1, analyze the design drawings, construction programs, tender price, contract (volume accounting, fixed fee, material price difference factors), etc., to clarify the cost of the project is most likely to break through the part or link of the investment control focus. Project Department of the project for the construction drawings volume calculations, applying the project budget quota, the preparation of the project construction drawings budget cost, according to the progress of the preparation of the monthly progress of the cost of the budget.

2, in the construction process, timely response to the construction unit to raise questions and cooperation requirements, take the initiative to coordinate the relationship between the various aspects of the project, predict the risk of the project and the possible causes of claims, the development of precautionary measures to avoid and economic claims.

3, according to the conditions and requirements of the contract, supervise the implementation of the preparatory work beforehand, so as to avoid claims, timely measurement and acceptance of the completed project, engineering design changes, site conditions, technical measures, materials involved in the funding of strict control.

4, review of the general contracting unit of the amount of work done by the monthly statement, review the actual amount of work completed and reported whether the situation is consistent with the review of the quota project application is consistent with the review of the unit price of materials and the month of Shanghai construction project "___ and cost information" in the market information of the material is in line with.

5, the study of supervision engineers review the design changes and related economic visas, responsible for verifying the project, the reason, the number, the construction conditions, and then put forward a preliminary opinion reported to the relevant departments for review and approval. It is necessary to emphasize that: the Ministry of the project expressly supervising engineers, for the contractor's design changes and related economic visa requirements, supervising engineers in the review of the comments made before the Ministry of the project must be communicated with and obtain consensus. Otherwise, there will be the possibility of the project department rejecting the supervising engineer's opinion, which will not only reduce the prestige of the supervising engineer, but also bring confusion to the project management. Any design changes and related economic visa requirements are based on written text.

(E), safety and civilization site management:

1, safety regulations, safety technology and industrial hygiene are the three main measures of safety control.

2. According to the safety and civilization project management objectives of this project, the construction unit is urged to carry out the safety regulations, production regulations and provisions issued by the State Council and various departments during the construction process.

3, in order to enhance the image of the site and safe and civilized construction, scientific arrangements, rational deployment of the use of construction sites, and to maintain a coordinated relationship with a variety of environments, requiring the construction unit according to the safety and civilization of the standard chemical site standards for construction.

4, supervise the supervision engineers to do a good job of safety control, the purpose is to ensure that there is no danger in the construction of the project, no accidents, no personal injury and property damage.

5, supervising engineers and contractors in accordance with the requirements of the relevant laws and regulations, so that the construction site and within the scope of the temporary land in order, civilized and safe, the environment is protected, smooth traffic, fire prevention facilities are complete, residents are not interfered with, the site and environmental health are in line with the requirements.

6, coordination site contractors, supervision, design, the owner of the internal departments, local villages and towns to create a good relationship between the internal and external environment for the construction of the project.

(F), other management of the project:

1, familiar with the construction drawings and design instructions, master the civil engineering, water and electricity of the various professions of the project quality standards, checking a variety of materials, equipment and other quality inspection work.

2, responsible for preserving the integrity and reliability of various engineering technical data, and record the minutes of various meetings.

3, at any time to do a good job in the relevant departments of the upper level of the commercial residential inspection of the information preparation.

4, responsible for the project implementation process, involving a number of external departments to contact the coordination work.

5, according to the actual situation of the project construction, constantly adjust, supplement and improve the project management planning, rules and regulations and management methods, in order to adapt to the needs of engineering construction.

__ Residential district project scale, volume, construction with a wide range of surface. How to build the project with high quality, high efficiency, low consumption, on schedule, safe, civilized, is an important milestone in the development of the Company's properties, for this reason, the comprehensive scheduling of the company's people, money and materials, in strict accordance with the quality and security system operation. Careful organization, scientific management, to ensure the realization of the intended objectives. The success of the project will lay the foundation for the development of Zhuji Group. I hope that through the project in the first half of this year's work summary of the future work of the project department has a positive reference significance.

Unit work summary sample 4

Since joining the work, in the hospital leadership and department head nurse's teachings, care for cultivation, in the support of colleagues to help, close cooperation, I continue to strengthen the ideological and political learning, work excellence, to complete the work of the tasks undertaken by the self, personal ideological and political quality and business work skills have achieved must and business skills have made necessary improvements for future work and study laid a good foundation, now the internship work is summarized as follows:

First, political and ideological

adhere to the patient-centered, quality-centered philosophy of nursing services, to adapt to the new model of care to serve the patient and dedication to the community for the purpose of patient satisfaction as a criterion for the patient's dedication to the patient. The service is to serve patients wholeheartedly.

Second, enhance legal awareness

Study carefully the "Nursing Law" and its laws and regulations, so that I realize that the modern concept of nursing quality is all-round, the whole process of patient satisfaction, which is the people of health care services to put forward a higher, newer needs, which requires me to enrich the knowledge of the law, to enhance the awareness of the safety and protection of the nursing staff to understand the law, the law, according to the law to reduce the occurrence of medical accidents.

This is the first time that I've seen this.

Third, work and study

I was in the Department of Surgery for more than two months. Learning. I feel that in order to combine the theoretical knowledge learned in the past with the actual clinical work, it is necessary to work in the normal work, on the one hand, strict requirements for self and more teachers, on the other hand, the use of spare time to study the business, experience the essentials. Two months, I mainly synthesize the surgical work, and these two sections are the focus of clinical work. Surgery has to deal with emergencies calmly, such as the emergency treatment of chest tube dislodgement, etc., so the rhythm of surgery is faster than internal medicine, and the work is busier and more trivial than internal medicine. When I first went to the surgery I was not adapted, but I am not afraid, I have not done before, in order to do a good job, obey the leadership arrangements, not afraid of trouble, ask teachers for advice, learn from colleagues, self-touching practice, in a very short period of time will be more familiar with the Department of Surgery, understand the responsibilities of the classes, clear procedures, direction of the work, improve the ability to work, in the specific work constitutes a clear idea of the work of the work. I am able to carry out the work smoothly and skillfully and successfully complete my job.

I in line with the "do a better job" such a goal, seriously receive every patient, every patient as a friend of self, loved ones, and often think of other people's suffering. The writing of medical documents requires seriousness and responsibility, a proper attitude and a clear mind. Write general nursing records, critical care records and resuscitation records. Comply with the rules and regulations, remember the three basics (basic theory, basic knowledge and basic skills) three strict (serious attitude, strict requirements, strict methods).

I expect all patients to recover as soon as possible, I will try to use the limited time to spare no effort to encourage them, patiently help them to understand the disease, to establish confidence in overcoming the disease, and silently pray for their early recovery, in the work, I will strictly abide by the rules and regulations of the hospital and the department, the strict implementation of the checking system and the nursing operation procedures, the implementation of the system, to reduce the occurrence of errors and accidents, the strict implementation of sterile operation, the strict implementation of the nursing operation, the implementation of the system, to reduce the errors and accidents. I will strictly follow the rules and regulations of the hospital and the department, strictly carry out the checking system and nursing operation procedures, implement the system, reduce the occurrence of errors and accidents, and strictly carry out aseptic operation to ensure patient safety. Implement the "patient-centered, quality-centered" service concept, polite and courteous service, adhere to the polite language, the implementation of each post in the work, and strive to improve the quality of nursing history writing, etc., the shortcomings, errors, seriously summarize, analyze, find the work of the hidden danger, to prevent the problem before it occurs.

Unit work summary sample 5

First, the duties of the integrated office

As a fresh graduate, the office can be described as a completely new field of work for me. As the company's administrative staff, they also clearly recognize the work duties of the administrative positions. Office is the general manager's office under the direct leadership of the integrated management organization, is the top and bottom, communication between internal and external, linking the four sides of the hub. The work of the office is very complicated, in the drafting of documents, provide information, project applications and other aspects of the high demand. In addition, it also needs to take into account file management, document approval and transmission, meeting arrangements, ushering in the affairs. In the face of a large number of complex and trivial transactional work, the need for administrative staff to be able to do to strengthen the self-awareness of the work, pay attention to speed up the pace of work, and strive to improve the efficiency of work, and calmly handle the affairs, and strive to be thorough, accurate, moderate, to avoid omissions and errors.

Second, do in place

Although the office is a brand new field for me, but since entering the company, the enthusiasm of colleagues and a good working atmosphere has given me great encouragement. The most office work done is written work. Since entering the company, I have drafted several comprehensive documents and some declarations about the company. Monthly staff meeting is responsible for the meeting records, organizing. Seriously do a good job of the company's related documents, mail and express delivery and receipt of work. Cooperated with R&D and Finance Departments to deal with some trivial work. Monthly recharge phone bills for teachers in various regions. Communicate and implement the company's relevant meetings, documents and instructions in a timely manner. Organize the company to hold small fun activities, so that everyone can relax in the busy work of the body and mind. In addition, also seriously do a good job in the company's various meetings or training logistics services, to ensure that the meeting or training can be carried out smoothly. Because of the social experience is not yet rich, before doing everything, we try to think thoroughly, try to avoid mistakes.

Third, there are problems and the direction of future efforts

As a graduate of the experience is still insufficient, just out of the campus into the complexity of the community, the need for a process of adaptation. Into the company's nearly three months, I can do love and dedication, down-to-earth work, made some progress, but there are some problems and deficiencies, mainly in:

First, all the work for me is a new position, many of the work I was doing while groping for the work can not work like other employees as ease, many times can not be done! All aspects of the work efficiency to be further improved;

Second, some of the work is not fine enough, some of the work coordination is not very well in place;

Third, their own theoretical level is not quite adaptable to the requirements of the company's leadership, often in the small problem of errors and omissions, can not let the leadership satisfaction, for this reason, we must often look for problems in their own to make more efforts to improve their own.

In the next few days, I am determined to seriously improve the level of work for the company's future development, and contribute to the company's future development, contribute to the strength of their own should contribute. I think I should try to do:

First, strengthen learning, broaden knowledge. Efforts to learn as the company's administrative staff should do the work content, clear job responsibilities.

Second, in line with the principle of seeking truth from facts, to do the top of the situation, the bottom of the report; really do a good job as an assistant to the leadership;

Third, pay attention to the company's work style construction, strengthen management, unity, hard work, the formation of a good working atmosphere of the department. Continuously improve the office's ability to support other departments, the level of service. Comply with the company's internal rules and regulations, safeguard the interests of the company, and actively create higher value for the company, and strive to achieve greater results.

I know, the above work performance may not let the leadership feel satisfied, from the leadership of the requirements and self-requirement is still a big gap. If the company believes that my probationary period is still qualified and to be career, I will have the confidence to further strict requirements for themselves, and strive to overcome the shortcomings, strengthen their own learning, and strive to improve the ability to work actively, enthusiastically and conscientiously to complete each job.

Unit Work Summary Sample 5 Related articles :

★ Unit individual year-end work summary sample 5

★ Unit individual work summary report 5 2022

★ Business unit annual individual work summary sample 5

★ Business and Industry Bureau Unit Work Summary 5 Sample

★ Office unit year-end work summary format 5

★ Unit work summary sample four

★ Business unit office work summary sample (five)

★ Business unit individual work summary sample five

★ Unit department annual work summary five sample

★ Unit end of the year work summary model 5

★ The year-end summary of the work of the unit.