What are the training and evidence collection units for quality assurance engineers of boiler installation units in Shandong Province?

Hello, quality assurance engineer qualification of boiler installation unit: 1 level, level 2, with the title of engineer or above, and engaged in this professional work for more than 4 years. The third level can be held by an assistant engineer or above.

According to the document Quality Inspection Pot (2003) 194, a member of the factory management should be appointed as a quality assurance engineer (mainly depending on whether he has the ability to exercise authority across departments).

These regulations are the same all over the country.

Please see the details:

TSGG3001-2004 Supervision and Management Rules for Boiler Installation and Reconstruction Units

Annex 3

Basic requirements of quality management system in boiler installation and transformation unit

Three, the quality management engineer should be an engineer (three-level boiler installation and renovation units can be assistant engineers) and above technical titles, the person in charge (three-level installation units should be equipped with welding, furnace building, lifting duties at least) should be assistant engineers (three-level installation and renovation units can be technicians) and above familiar with the business of this position.

TSGZ0004-2007 Basic Requirements of Quality Assurance System for Manufacture, Installation, Modification and Maintenance of Special Equipment

Article 4 The requirements of the person in charge of the quality assurance system of the manufacturing, installation, modification and maintenance units of special equipment are as follows:

(1) The legal representative (or its authorized top manager) of the unit that manufactures, installs, reconstructs and repairs special equipment is the first person responsible for safety and quality. The management should be equipped with 65,438+0 quality assurance engineers to assist the top manager in establishing, implementing, maintaining and perfecting the quality assurance system for manufacturing, installing, reconstructing and repairing special equipment, and designate the person in charge of each quality control system to be responsible for the manufacture of special equipment.

(2) The quality assurance engineer and the person in charge of each quality control system shall be the relevant professional engineers and technicians employed by the manufacturing, installation, renovation and maintenance units of special equipment, whose qualifications shall conform to the provisions of safety technical specifications, and have signed labor contracts with the manufacturing, installation, renovation and maintenance units of special equipment, but they shall not be employed by more than two units at the same time;

(3) The person in charge of the quality control system can only concurrently serve as two persons in charge of the quality control system with unrelated management responsibilities.

TSG Z0005-2007 Detailed Rules for Evaluation of Manufacturing, Installation, Modification and Maintenance License of Special Equipment

Article 10 During on-site evaluation, the applicant shall provide the following information to the evaluation team:

(a) the basic information of the applicant;

(2) Documents (originals) and organization code certificates (originals) registered with the local government according to law;

(3) The special equipment license (original) held by the replacement applicant and the list of special equipment manufacturing products (installation, modification and maintenance equipment) during the license holding period;

(four) the quality assurance manual of special equipment and its related program documents and operation (process) documents;

(5) List of quality assurance engineers and persons in charge of quality control system, letters of appointment, employment contracts, payroll, relevant insurance certificates, ID cards, professional title certificates and academic certificates;

(six) the list of engineering and technical personnel and special equipment operators (welding, nondestructive testing) and their employment contracts, payroll, relevant insurance certificates, identity cards, professional titles, academic qualifications and certificates of special equipment operators (original);

(seven) equipment, tooling, instruments, appliances, inspection and test devices and other ledgers;

(eight) calibration ledger and calibration records of inspection and test devices;

(9) Design documents (including design drawings, design calculations, installation instructions, etc.). ), operation (process) documents (including work instructions, process evaluation reports, process regulations, process cards, inspection process regulations, etc. ), quality plan (process control card, construction organization design or construction plan), inspection and testing, and the construction plan of the test products (trial installation, renovation and maintenance equipment) of the licensed project.

(ten) the applicant's qualified suppliers (packages) list, supplier (package) evaluation report;

(eleven) the acceptance appraisal report and type test report of the design documents of the licensed products (safety technical specifications and their corresponding standards);

(twelve) the list of relevant laws, regulations, safety technical specifications and their corresponding standards;

(thirteen) management review, nonconforming product (item) control, quality improvement and service quality assurance system implementation records;

(fourteen) other information needed in the process of identification.

Article 11 During on-site evaluation, the applicant shall keep the manufacturing (installation, renovation and maintenance) production status of the licensed project.

What's the difference between a quality assurance engineer and a quality management engineer?

Quality assurance (control) system

(1) System definition: a group of interrelated or interacting elements.

(2) Definition of quality assurance: As a part of quality management, it is committed to providing trust that quality requirements will be met.

(3) Definition of quality management system: management system of quality and control organization.

Based on the above three definitions, the quality assurance system is defined as: the system that commands and controls the organization (a group of interrelated or interactive elements) in quality assurance.

The composition system should generally include: organization, procedures, processes and activities.

The main differences between quality assurance and quality management:

The quality management system advocates organizations to adopt "process method" (PDCA management mode) to enhance customer satisfaction by meeting customer requirements.

The quality assurance system is committed to providing trust to meet quality requirements, and the most prominent thing is to provide trust to meet quality requirements. The safety and quality of special equipment usually require full trust in materials, welding, nondestructive testing, physical and chemical inspection and heat treatment.

The above are basically the requirements for the qualification of boiler installation quality assurance engineer.

Please keep asking questions.