Clean engineering stainless steel plate structure Runde purification construction plan
Construction conditions
1.1. Do not use wooden materials and other materials that do not meet the requirements of cleanliness standards in the clean room.
1.2. All incoming materials are stored in a clean and dry environment with enclosed facilities.
1.3. The thickness, specifications, dimensions, and quality of stainless steel plates must meet the design requirements or contract requirements, and there must be factory inspection reports.
The production of stainless steel plates must be in accordance with the secondary design. The board drawing and size and quantity list are carried out. During the production process, the drawings are numbered. The length of the ceiling board should not exceed 5000㎜.
1.4. Auxiliary materials, such as small hardware standard parts, must meet the design requirements or contract requirements and have to leave the factory. Certificate of conformity.
1.5. The material and specifications of the connecting steel should meet the design requirements and have a warranty or inspection report. Low carbon steel should be used
.
1.6. The materials and specifications of aluminum alloy profiles should meet the design requirements or contract requirements, and have factory certificates.
1.7. There are sufficient temporary storage areas for materials and storage areas for aluminum alloy processing and semi-finished products.