The First Affiliated Hospital of Xinjiang Medical University passed the approval of the funding application report of the project of borrowing loan from the Israeli government In July 2008, the National Development and Reform Commission approved the funding application report of the project of borrowing loan from the Israeli government of the First Affiliated Hospital of Xinjiang Medical University, which was borrowed from the Israeli government mainly for the purchase of the medical magnetic **** vibration imaging equipment (MRI), digitalized flat-panel angiography system (DSA), whole-body X-ray computed tomography system (CT), color Doppler ultrasound diagnostic instrument System (DSA), whole-body X-ray computed tomography (CT), color Doppler ultrasound diagnostic instrument, digital X-ray flatbed photography system, digital flatbed breast machine and other medical equipment. Xinjiang Hami Central Hospital's Funding Application Report for the Project of Borrowing Loan from the Israeli Government Approved In July 2008, the National Development and Reform Commission approved the Funding Application Report for the Project of Borrowing Loan from the Israeli Government for the Xinjiang Hami Central Hospital, which is mainly used for the purchase of whole-body X-ray computed tomography (CT) scanning system, large-scale C-arm digital subtraction angiography (DSA), digital X-ray flatbed mammography system and other medical equipments. DSA), digital X-ray flatbed camera system, digital mammography system, digital multi-function X-ray machine, color Doppler ultrasound diagnostic instrument, medical imaging network management system and other medical equipment. Funding application report for the project of Conghua Central Hospital of Guangdong Province borrowing funds from the Nordic Investment Bank approved In July 2008, the National Development and Reform Commission approved the funding application report for the project of Conghua Central Hospital of Guangdong Province borrowing funds from the Nordic Investment Bank, which was mainly used for the purchase of medical magnetic **** vibration imaging equipment (MRI), X-ray computed tomography (CT), digital X-ray machine, digital X-ray machine, digital X-ray machine, digital mammography system, color Doppler ultrasound diagnostic machine, medical imaging network management system and other medical equipment. ), digital X-ray machine, molybdenum-palladium mammography, automatic biochemical analyzer, three-dimensional color B ultrasound and other medical equipment. Henan Xin'an County People's Hospital borrowed from the Austrian government loan project funding application report through the approval of July 2008, the National Development and Reform Commission approved the Henan Xin'an County People's Hospital borrowed from the Austrian government loan project funding application report, the project borrowed from the Austrian government loan is mainly used for the purchase of medical electronic linear gas pedal (LA), X-ray computed tomography (CT), 100 mA C-arm machine and other medical equipment. mA C-arm machine and other medical equipment. Wuding-Kunming Highway Feasibility Study Report Approved The National Development and Reform Commission approved the feasibility study report of Wuding-Kunming Highway. The highway starts from Wuding, connects with the under-construction Yongren (Sichuan and Yunnan border) to Wuding highway, passes through Fumin, Liziping, Puji, and ends at Xiaotun interchange, connecting with the Second Ring Road of Kunming City, with a total length of about 65 kilometers. The whole line adopts two-way four-lane expressway standard construction, of which, the starting point to Fumin section of about 37.5 kilometers, the design speed of 80 kilometers / hour, roadbed width of 24.5 meters; Fumin to the end of the section of about 27.5 kilometers, the design speed of 100 kilometers / hour, the width of the roadbed 26 meters. Local geological complexity, difficult terrain section in the guarantee of traffic safety under the premise of the study demonstrated that some technical indicators can be appropriately reduced. The whole line of bridges and culverts design car load level using highway - Ⅰ.
The whole line in the Xiejiaying, the north, Fumin, Wu Guishan and so on 4 places to set interchange. Another use of secondary highway standards for the construction of interchanges connecting about 3 kilometers and shifting National Highway 108 line about 1 kilometer.