What are the contents of the normal inspection of high-voltage equipment?

(1) the contents of the power distribution room inspection

① inspection oil transformer oil level, oil color is normal, whether the operation is overloaded, whether the oil leakage; dry-type transformer is mainly to observe the temperature of each phase, fan operation.

② inspection of the distribution cabinet, there is no sound and odor, a variety of instrumentation is normal, a variety of wire joints whether there are traces of overheating or burns, wiring is good.

③Visit the distribution room to prevent small animal facilities are good, a variety of markers, signs are intact, whether the safety gear is complete, whether to put in the required location.

④Switch the lighting and other facilities in the area on time.

(2) line inspection program

① pole tilt, damage, foundation sinking phenomenon, there are measures to be taken.

② Along the line there is no accumulation of flammable materials, dangerous buildings, there should be dealt with.

3 ③ pull line and trigger pile is intact, tied line is tight, if there are defects try to deal with.

④ The wire joints are good, the insulation is not broken, if so, replace it.

5 lightning device grounding is good, if there are defects to deal with.

6 For cable lines, should check the cable head, porcelain casing for damage and discharge traces, oil-impregnated paper cable should also be checked for oil leakage.

⑦ Check whether the cover along the concealed cable is intact, whether the route stakes are intact, whether there is water in the cable trench, whether the grounding is good.

Possibly the list of entries is not complete, please friends to add