Electrician personal work summary

Time passes, a period of work activities come to an end, this is a period of precious work time, we gain a lot, it is time to carefully write a work summary. How do we go to write a work summary? The following is my personal work summary for you to organize the electrician (selected 9), welcome to read and collect.

Electrician personal work summary Part 1

Hello, I'm very happy to be able to work with you again *** with a year, time flies, 20xx year will soon be over, looking back on the past year, I can not help but feel a thousand emotions, the past year I was in the leadership and colleagues in the care and guidance, through their own unremitting efforts, in the study and work achieved certain results, but there is also a lack of. There are shortcomings. Now about the 20xx annual work situation is summarized as follows:

First, the work achieved:

1, and maintenance electrician, electrician, and scheduling and other various positions to coordinate the relationship between the work of the synergistic cooperation, and efforts to the calcium carbide plant safety, stable production escort, for the 20xx year of the production of enterprise The goal of the company's production in 20xx.

2, combined with the actual work, in the class from the theory to practice of learning, so that members of the team of electrical and instrumentation knowledge continue to deepen and penetrate each other, from time to time to hold technical learning activities, combined with the work encountered in the difficult problems, invited the team to discuss with the relevant people, and ask for advice, to enhance their own technical level, to lead the enthusiasm of the whole class of workers to learn.

3, conscientiously do their own inspection work, regular inspection of low-pressure room, high-pressure room equipment, timely detection of hidden dangers and processing, so as not to cause damage to personnel and equipment, and do a good job of health.

Second, the work of the problems and deficiencies

20xx year has ended, looking back on their work this year, although the time is long, but there are few flashpoints, a lot of work is not as good as it should be, summed up the shortcomings of the main points are as follows:

1, members of the classroom there are learning Positivity and initiative is not enough, the team has not formed a better conscious, voluntary learning atmosphere.

2, there is still a certain degree of personal inertia in the learning process, in assisting and guiding colleagues to learn the continuity and patience needs to be further strengthened.

Third, the future work of the intention:

1, further in the class to create a learning atmosphere, strengthen the ideological teaching and economic assessment of the combination of efforts to improve the class learning and work of the pressure and motivation to practice-oriented, further familiarize with the site equipment, and strive to be able to quickly, safely and efficiently deal with production problems and various faults, in order to complete the work. The problem and all kinds of faults, in order to complete the work of all kinds of tasks to lay a solid foundation.

2, constantly improve the sense of responsibility and ideological awareness of the work, to the company's advanced individuals, advanced collectives, to the surrounding excellent staff to learn, and strive to improve business knowledge, carry forward their strengths and strengths, correct their shortcomings and deficiencies.

20xx year is China's economic adjustment and optimization of the structure of the year, is our business is facing an important opportunity of the year, but also a year of personal self-challenge, I will continue to carry forward their own strengths and advantages, and strive to correct the shortcomings of the past year, in the new year to the professional theoretical knowledge and practical ability to further improve the work of the new year to do a good job for the company's sustained development to do their part.

Personal work summary of the electrician Part 2

"360 lines, line out of the top", for the results from childhood is not good for me, the test is undoubtedly a very difficult thing, but I myself or not the slightest bit of discouragement, I went to their own after I came to the technical school to study, intends to learn a suitable technology for themselves. After I was very careful consideration, I decided to study electrician, I hope I can become an excellent electrician. After I graduated, I studied very much and came to afterward. Since I work, I have been engaged in the first-line electrician work, over the years, I strictly require themselves, conscientious. Mainly from the following aspects:

First, political learning and aspects

Actively participate in a variety of democratic, participate in democratic management, to the factory as a home, work hard, do a good job of a production line of electricians should do the duties.

Second, in terms of energy saving and consumption reduction

In terms of energy saving, I actively use the knowledge I have learned, for the factory's energy saving and consumption reduction made a lot of contributions, such as the transformation of the factory line, for the factory's annual electricity more than 100,000 degrees. At the same time and the factory's old equipment, electrical remodeling, so that some of the old equipment to rejuvenate.

Third, the practice of production

In the production of practical aspects, such as: motor electrical fault finding and elimination of examples.

1, check whether the insulation of the lead wire is intact, whether the motor is overheating, check whether the wiring is in line with the nameplate, the winding and the first and last end of the electricity is correct.

2, measurement of insulation resistance and DC resistance to check whether the insulation is damaged. There is no broken circuit, short circuit and grounding in the winding.

3, energized to check the end of the above checks found that the problem, you can directly energize the test, with a three-phase regulator to start applying a lower voltage, and then gradually rise to the rated voltage.

Four, production

1, the implementation of the spirit of the higher documents, to improve the safety of workers with electricity awareness, enhance the heart of the workers.

2, the implementation of the perfect safety electricity organization system, sound safety management rules and regulations.

3, to strengthen the class electricity safety management, consolidate the security foundation.

4, a ensure, electricity users to ensure their own safety and the safety of others.

Fifth, learning

Over the years, I actively participate in a variety of learning and training, and strive to learn the basic knowledge of electrician training, knowledge of the power supply system, line installations, lighting fixtures, grounding devices, the operation and maintenance of transformers, motor maintenance and repair, machine tools, electrical control circuits, plc control and other related knowledge system. Every time I study, I have learned some new theories, and used to guide the work practice, applied to the work of the factory's power supply system, the control system to improve the unanimous praise. Its repaired. Summarize the various failure phenomena and solutions in a timely manner, and recorded, used to guide practice, but also to improve their own flat.

In production practice to do the rules and regulations on the wall, strictly according to the rules and regulations. Over the years, the factory did not occur a safety fault caused by electrical, and the factory through a number of technological transformation, the operation of equipment more scientific, rationalization. In the future work, I will always be aware of the degree of seriousness. Of course, as an electrician, safety is always the most important, safe production work on the responsibility, but also responsible for the factory. In the new year, I will continue to continue to improve themselves, in the mind, technology, work on the right to make greater progress, I firmly believe that I will do better!

Electrician personal work summary Part 3

20xx x month x day I entered a full of vitality, fighting spirit, unity and development of the company - xx company, into the xx company so far has been more than a year long. Before I came to XX Company, I knew little about photovoltaic power generation and was curious about the new energy power generation industry. After entering the xx company, I have seen a lot of new knowledge and new technology, and I am full of interest in these new things.

Although there is a lot of new knowledge and technology to accept, and it takes a long process to fully master these things, the enthusiasm of my colleagues has y infected me, and made me work harder to learn, to enrich myself, to enhance my professional knowledge and work skills, and I hope that I can enter the role as soon as possible, and become a qualified operator. In this year, the personal work has improved greatly and gained a lot. Now this year's personal work is briefly summarized, the details are as follows:

First, the work:

This year's main daily work is the operation and maintenance of the equipment, inspection, overhaul and so on. In addition to the daily work, in 20xx I was mainly involved in the following key work:

1, with the team to carry out 80 MW converter box special inspection 1 time, 10MW tracking system special inspection and box variable 1 time, switchgear switching and storage indicator special inspection and fault elimination work 1 time, cleaning one, two, three **** 80 MW inverters and box variable hygiene 4 times, clean 80MW Inverter dust net 1 time, plant weed removal 2 times;

2, in accordance with the department's requirements to cooperate with the team to carry out the second phase of the second section of the converter box rust prevention work. The paint quality of the convergence box of the second phase of the second standard section is poor, and most of the convergence box shell has been rusted in a large area, and this quarter the organization will remove the rust from the shell of the convergence box and paint it with antirust paint to avoid the rust damage of the convergence box box;

3, cooperate with the xx raw manufacturers of the first phase of the 1 MWPower-One inverter replacement and reconstruction. After the completion of this project, 18 Power-One inverter modules were added as spare parts;

4. Participated in the upgrading work of IDS inverters of Phase II IDS inverters, and all the performance indexes meet the assessment requirements of the power company after the transformation. According to the comparison after the transformation of the average daily power generation of IDS inverter increased by about 7%. (/Electrical Learning Network original manuscript, all rights reserved)

5, participated in the tracking bracket lifting and leveling work. Due to the windy weather in Sun Mountain and the aging of the equipment, there were a large number of tracking falling accidents. Under the premise of power preservation, we lifted the falling components and fixed the bracket without tracking function, which not only reduced the falling accidents, but also increased the power generation.

Second, life:

In order to make themselves better and colleagues and the company as a whole, this year actively participate in the activities organized by the company. For example, this year, the company organized the 20xx annual meeting, two staff basketball games, sports and so on. When I first came to China Energy Conservation Company, I didn't know everyone, and I was worried about whether I could maintain a good relationship with my colleagues. Especially as a newcomer, it is necessary to handle interpersonal relationships properly to promote better work. So this year, the colleagues and friendly, others have difficulties will do their best to help others, always maintain a good relationship with colleagues.

Third, the main experience and gains:

1, only to correct their own position, make efforts to familiarize themselves with the basic business, in order to better adapt to the workplace.

2, only active integration into the collective, deal with all aspects of the relationship, in order to maintain a good working condition in the new environment.

3, only the work as their own business to do, down-to-earth and serious, in order to share the ` work well.

4, to strengthen the communication with colleagues and leaders, and continue to learn from their predecessors in order to do a better job in their own work.

5, do not understand the knowledge and skills, can not blindly operate, consult other colleagues in a timely manner to seriously learn, only to continue to enrich themselves to go farther.

Four, the work of the shortcomings:

Although in this year's time there is a lot of harvest, learned a lot of things, but their own performance this year is not as satisfactory. After this period of time after their own deep introspection, I here to summarize their own shortcomings.

Insufficient work experience, less communication with the leadership and everyone else, not enough comprehensive consideration of the matter, not detailed. Although efforts to do some work, but from the work of the company's leadership on my expectations and requirements there is still a great distance. Such as the level of theory, working ability, and the implementation of specific work and planning and other issues to be further improved. At the same time, I am not skilled enough for the workplace, etc., these problems I am determined to correct and solve in the future work, so that I can do my job better. And they should be able to do things, be brave to undertake, do not rely on others, do not retreat, do not escape, bravely take this step, the future in the work to do more confident and careful.

Fifth, the next year's work plan

The next year is ready to strengthen their professional knowledge and skills, to buy related books to learn. View the relevant professional certification process, to obtain some certificates, to increase their ability to work. I also hope to be able to try to participate in all kinds of activities organized by the company, to increase their ability to work in addition to other companies and more colleagues to know each other to learn.

20xx year has passed, the future days are still full of challenges and opportunities, always feel the effort to do, seemingly easy, do it is the need to use the heart, hard, with attitude. But I firmly believe that the company's leadership of the correct decision-making, the assistance of colleagues, coupled with my personal unremitting efforts, 20xx will be my company in the energy-saving metamorphosis under the accompaniment of the year.

Electrician personal work summary Part 4

As an ordinary agricultural electrician, every month, in addition to reading the meter, chasing the collection of electricity and maintenance of their own responsibility for the area of the line, there is plenty of time to learn and comprehend the spirit of the higher leadership, because only constant persistent learning, will not be eliminated by the Southern Power Grid, I can stand up to the Jinsha Electric Power Company, which I rely on for my survival. Provincial company Mr. Pan mentioned in various meetings, regardless of the leading cadres or employees on all fronts should be in the study to improve themselves, so that they become a good quality, high level, the obligation of the South China Power Grid masters, we have to do "rigorous, diligent, fine, real" four points, the following I talk about with a rough insights.

The first point "strict", is to be serious, treat the work can not be perfunctory and sloppy, especially in the electric power industry, we are engaged in, do not strictly require their own, the danger will appear at any time, the "Safety Regulations" is written with countless lessons learned from the blood, only to seriously put the written knowledge into practice, is the theory and practice. As the theory is linked to practice, all safety accidents can be avoided, in addition, the leadership should also be strict requirements of subordinates, can not listen to it, not to protect the shortcomings.

The second point "hard", the ancients cultivate the method of governance can not be separated from the hard work, broad-minded people, even if it is a *** male, can not be separated from the word hard. Our Taiping power station staff income is very little, can not be compared with the formal workers, but for the sake of family happiness, with a "hard" word to life, rural colleagues home after work to plant agriculture, and no land to find some other work, such as the installation of indoor electricity for other people and so on, with sweat in exchange for payment, to strive for more! The first thing you need to do is to find some other work to do, such as installing indoor electricity for others.

The third point of "fine" is to be careful and meticulous, as an agricultural electrician, we should carefully analyze the causes of accidents and solve various problems, work hard and improve their living environment, and try to do as much as possible to follow the rules in the work.

The fourth point "real", I think the people to be real, not hypocritical, with the term is "not social"; treatment of the work, to be truthful, do not tell lies, is that is, is not is not, including the leading cadres, can be done to do, can not be done to explain the reasons. Do have to explain the reasons, this is the king's demeanor.

20xx year is coming to an end, looking back on a year's work, intense and busy work scene and one by one presented in front. A year in the management center under the care and guidance of the leadership, has made great progress. Similarly, there are many shortcomings in the work, it is worth seriously summarize.

First, the neighborhood since the occupation, the weak electricity system there are a number of problems, affecting its use of function.

How to restore the use of the system function, to play its due use of the performance of the weak electricity maintenance personnel is both a technical problem and a challenge. Such as building intercom, monitoring and other faults occur frequently, line confusion, etc., on the future maintenance and normal use of equipment there is a greater risk. By communicating with the relevant manufacturers after-sales, research solutions to eliminate security risks, to ensure the normal operation of the equipment and improve the service life of the equipment.

Targeted arrangement of daily maintenance tasks, to achieve the daily maintenance work of the planning, rationality.

According to the management center of the relevant provisions of the operating instructions, weak electricity maintenance arrangements for daily inspection, the relevant equipment, building intercom, monitoring, road gate system to achieve a comprehensive and detailed maintenance, to ensure the safe use of equipment and facilities and operation.

Three, efforts to improve personal qualities, with an eye to the next step.

1, first of all, my own work attitude to be more correct, to have a good professionalism, team spirit, to work seriously and responsibly, resolutely obey the leadership arrangements, and humbly listen to colleagues' instructions and suggestions, to unite the colleagues, courteous, enthusiastic service owners.

2, adhere to do my best to do everything, in the interests of the management center. Will be weak electricity equipment and facilities, such as doing electronic login and numbering, so that there is a record, number, number, use records, mind.

3, strengthen the supervision and urge the maintenance unit, as soon as possible to complete the construction and warranty.

4, their own initiative and courage to take responsibility for their own shortcomings and shortcomings courage to accept criticism, and strive to correct. Immediate action to improve the implementation of the courage to bear the burden. In the practice of work, play their due role, but also for the management center to establish a good image.

Electrician personal work summary Part 6

In this year's factory maintenance electrician work, I actively participate in a variety of democratic activities, participate in democratic management, the factory as a home, hard work, and do a good job as a production line electrician should do the duties. The following is a summary of my work this year.

First, production safety

Implement the spirit of the higher level documents to improve the safety of workers with electricity awareness, enhance the sense of responsibility of workers. Implement and improve the safe use of electricity organization system, sound safety management rules and regulations. Strengthen the safety management of the classroom electricity, consolidate the safety foundation. A ensure, electricity users to ensure their own safety and the safety of others.

Second, training and learning

Actively participate in a variety of learning and training, and strive to learn the basic knowledge of electrician training, knowledge of the power supply system, line installations, lighting installations, grounding devices, the operation and maintenance of transformers, motor maintenance and repair, machine tools, electrical control circuits, PLC control and other related knowledge system. Every time I study, I have learned some new theory, and used to guide the work of practice, applied to the work of the factory's power supply system, the control system to improve the unanimous praise.

Three, in the energy saving

In the energy saving, I actively use the knowledge I have learned, for the factory's energy saving to do a lot of contributions. Such as the factory line remodeling, for the factory to save electricity x degrees per year. At the same time, the factory's old equipment, electrical transformation, so that some of the old equipment rejuvenation.

Fourth, the practice of production in the production of practical

Check whether the insulation of the lead wire is intact, whether the motor is overheating, check whether the wiring is in line with the provisions of the nameplate, the windings and the first and last end of the electricity is not correct; measurement of insulation resistance and DC resistance measurements to check whether the insulation is damaged. Whether the winding is broken, short-circuit and grounding and other phenomena; energized check in the end of the above checks found that the problem, you can directly energize the test, with a three-phase voltage regulator to start applying a lower voltage, and then gradually rise to the rated voltage, and so on.

The use of inspection methods for the factory to find faults in a number of motors, and will be repaired. Summarize the phenomenon of various failures and solutions in a timely manner, and recorded, used to guide practice, but also to improve their business level.

Personal summary of the work of the electrician 7

The end of the year, looking back on a year's work, as a plumber, in the xx kindergarten leadership of my work and life care, love and care, so that I work on the attitude of the service, the level of thinking and so on have been improved. The past year, there are gains and losses in the work. Now this year's personal work summary to the leadership to do the following report.

First, the work attitude, ideological work

I am enthusiastic about the work of this job, strict self-discipline, to comply with the rules and regulations of the factory system, strict to ball themselves, the correct work position, always maintain a "modest, prudent, self-centered," the attitude of the work of the leadership in the care and cultivation and the help of colleagues, and the work of the leadership in the work of the company is not a good idea. Cultivate and colleagues to help, always study hard, actively enterprising, and strive to improve themselves, always work hard, conscientiously complete the task, to fulfill the duties of the post.

Second, the production work

1, the implementation of the provisions of the company's management work, improve the level of water and electricity business, seriously do a good job on the use of repair tools and maintenance, regular inspections of the community water and electricity appurtenances are intact, and found that the problem was immediately reported to the captain. Ensure that the circuit, water facilities intact, to protect the kindergarten water and electricity smooth.

2, strict self-discipline, leniency, abide by the company's rules and regulations. I strictly abide by the rules and regulations of the park, not late, not early departure, something active leave. At work, respect for leadership, solidarity with colleagues. Usually, hard work and thrift, hard work, sincere to others, interpersonal relationships, harmonious and cordial, and not relentlessly cultivate their own comprehensive quality and practice of water and electricity related policies, regulations and penalties scale, to master the correct construction methods, and in a timely manner on the existence of hidden safety hazards of water and electricity facilities for the replacement of the renovation.

Third, this year, mainly completed the following work

1, love of work, daily work, constantly familiar with the updated business, able to do everything conscientious and responsible.

2, do a good job of repair and maintenance of water and electricity lines, to do regular checks, timely maintenance, to ensure the normal operation of power supply and water supply equipment, and seriously complete the necessary improvements to the task, so that the line equipment to maintain good condition, the rational use of water and electricity materials, caring for tools.

3, in the work can do conscientious work, do not leave the workstation, love the post does not take off the post, not chaotic as.

Personal summary of the work of the electrician Part 8

Time passes, snap your fingers, as the company's a mechanic into the company has been almost 9 months, review the work of 9 months, both gains and shortcomings, the following summary of their work in the past 9 months:

Before entering the company to do a good job of No. 1 and No. 4 plant lighting as well as the maintenance of tools to declare, purchase. 2 months in March, the No. 3 and No. 4 plant lighting and maintenance of tools to declare, purchase. In February, all the gates of No. 3 and No. 4 plant maintenance, and do a good job of canteen water and electricity installation and maintenance of all the staff dormitory doors, windows and locks of the replacement, to complete the various tasks assigned by the president of the various tasks. after April on the high-voltage distribution room for grounding installation, the water tower of the rebar cutting and single-crystal furnaces, cooling water towers, high-voltage distribution room, low-voltage distribution room embedded parts cutting production, high-voltage distribution room, and water towers, the water tower, high-voltage distribution room. In the period of trial production, we have installed the electricity in the high-voltage distribution room and the water pump room, suspended the ceiling of the low-voltage distribution room, cooperated with the installation of the single-crystal furnace and the production of the platform, installed the ancillary machinery and electricity, cooperated with the infrastructure section to do the work of the company, and cooperated with the engineers in Xi'an to do the debugging of the single-crystal furnace after the furnace has been installed. During the trial production period, we actively checked the mechanical equipment.

After nearly 9 months of work, I y realize that I have been holding the professional technology is so shallow, in order to adapt to this work should continue to improve their theoretical skills and business quality. Continue to learn especially water, gas, electricity, welding, mechanical and other professional knowledge, therefore, I often read related books, websites, and constantly draw knowledge, master and perfect the operation skills. I am very confident and determined to do a good job, I am confident that after these nine months of exercise and Yu, chairman of the guidance and requirements of the work and the support of the vice presidents of the work I believe that I can adapt to the work, can be for the development of the company to dedicate my share of power.

Back in 9 months of work, I am basically satisfied with their own work, in the future work, I will continue to work hard to learn, solid work, for the company to suggest a better contribution.

Personal work summary of the electrician Part 9

Since entering the power plant work, the leadership at all levels of teaching and training, in the care and help of colleagues, I think, work, study and other aspects of the achievements of a certain degree of personal comprehensive quality has also been a certain improvement, I will now be a period of time to make a brief summary of the situation reported.

In thought, I adhere to the four basic principles, support the party's policies, consciously abide by the laws and regulations, consciously set up a noble world view, outlook on life, set up a socialist concept of honor and shame, armed with advanced ideas, so that they step by step toward the advanced forward. Of course, in the future, I will also continue to strengthen the study, in order to adapt to the needs of social development, and constantly improve their own political and theoretical qualities, in order to adapt to the objective requirements of social and economic development.

In business, strive to consolidate the professional foundation, expand knowledge, and strive to better complete their own work. Four years of university study, learned more is the basic knowledge of the profession, and practical experience, social experience is very scarce. However, the relaxed and harmonious working atmosphere of the department and the good opportunities for learning and development have enabled me to quickly complete the transition from student to staff. I am able to face setbacks correctly and look at problems from a critical point of view. The work can always maintain a positive attitude, and work hard to carry out.

In my work, I have been working on my own work, systematic professional learning, but also focus on strengthening the understanding and mastery of medical knowledge, contributing to the improvement of their own knowledge structure and the soundness of the knowledge system, so that I can familiarize myself with the work situation as soon as possible, as soon as possible, less detour.

These past few months have been a period of continuous learning and enrichment, a period of active exploration and gradual growth. Of course, I still have a lack of experience, consider the problem is not comprehensive enough and other shortcomings, I will be in the future work, strict requirements for their own, strengthen learning, seriously summarize the lessons learned to overcome the shortcomings. In my future work, I will try to find my own position, do my best to contribute to the hospital and create real wealth for the community.