MBR membrane in the sewage treatment equipment how to install

1, membrane installation should be the first to organize the installation environment, from the packaging out of the membrane can be satisfied with the place to be placed smoothly, in the installation process there may be touched to the membrane surface of the sharp blunt instrument to keep in mind to bandage up, to prevent the installation process of the membrane constitutes damage.

2, to ensure that the MBR membrane pool clean and free of particles and debris at the bottom of the pool, membrane module bracket is fixed and reliable. Then the initial MBR pool water release, the water surface from the top of the component about ten centimeters. Just removed from the bag from the surface of the new membrane is sticky, the installation of the time if you do not put a good water to play a smooth role, if the two membrane surface will be close to stick together, if you press down on the membrane surface will lead to damage.

3, just removed from the packaging plastic bag out of the membrane, the process of handling the membrane can not make the membrane surface has a large point of view of the bending, and can not be placed on the ground without protective measures or other objects above.

4, each sheet of film in the unpacking is about to be installed, we should do a detail check, check the surface of each film whether there are traces of scratches, check the glue glue joints whether there is empty space, such as found that the problem should be timely replacement of the film.

5, in the assembly of the membrane, feet try not to step on the top of the membrane, such as a last resort, try to step on the corner edge of the membrane rather than the middle.

6, diaphragm is a single sheet into the membrane assembly, pay attention to each diaphragm outlet direction and the main suction pipe corresponds to prevent the wrong direction and then pull out from the beginning.

7, the membrane is divided into a small cell every 5 pieces, pay attention to check the number of membrane in each cell, can not be missed.

8, in the process of loading the film should be slow, to ensure that each piece of film in the corresponding compartment within the bar, do not pull and push.

9, MBR membrane all put into the component, with rubber compression strip will be separated from the membrane compression, and then use the channel steel will be rubber compression strip fastened, both ends of the screws must be tightened.

10, rubber tube installation, try to use glycerin smooth, if no glycerin can be replaced by soapy water, the rubber tube should be inserted into the bottom.