Raw material suppliers remind you of the application of TPV in the automotive industry 1. Automobile sealing strips and seal series; 2. Automobile dust covers, fenders, ventilation pipes, buffers, bellows, air intake pipes, etc. ; 3. Automobile high-voltage ignition wire. Can withstand 30-40KV voltage and meet UL94 V0 flame retardant requirements; consumer products 1. Parts of gardening equipment such as power tools, power tools, and lawnmowers; 2. Gaskets and parts used in household appliances; 3. Scissors, Handles for toothbrushes, fishing rods, sports equipment, kitchen supplies and other products; 4. Various packaging for cosmetics, beverages, food, bathroom supplies, medical appliances and other products; 5. Various wheels, buzzers, pipe fittings, belts Soft parts of joints. 6. Soft rubber parts such as needle stoppers, bottle stoppers, straws, sleeves, etc.; 7. Flashlight casings, children's toys, toy tires, golf bags, various grips, etc. Electronic appliances 1. Various headphone cable jackets, headphone cable connectors; 2. Mining cables, CNC coaxial cables, ordinary and high-end wire and cable insulation layers and sheaths; 3. Power sockets, plugs and sheaths, etc.; 4. Batteries, Wireless telephone casing and electronic transformer casing sheath; 5. Insulation layer and sheath of power cables in ships, mines, drilling platforms, nuclear power plants and other facilities. Transportation equipment: 1. Expansion joints of roads and bridges; 2. Road safety facilities, buffering and anti-collision components; 3. Container seals. Building materials 1, power component seals 2, building expansion joints, seals 3, water supply and drainage pipe seals, irrigation system control valves, etc. TPV has slight hygroscopic properties and should be supplemented with drying, especially when extrusion or blow molding Before processing, it must be dried. Before placing the material in the drying oven, the temperature of the dryer should be raised to 100°C. The TPV is then kept in the drying oven for 2-3 hours. Contact with environments with high relative humidity should be avoided as the material will absorb moisture and create voids in the processed product. If the machine is shut down for a long time, the raw material remaining in the extruder barrel should be discharged before restarting the operation. Extrusion equipment should be thoroughly cleaned before and after processing TPV. Injection molding equipment or extruder barrels should be mechanically cleaned or completely replaced with polyethylene or polypropylene. WeChat Zell