What are the five members of the building?
The five members of a building refer to the budget officer, the builder, the quality inspector, the safety officer and the material officer. The "five members" of the new rural cooperative medical service system refer to the circulation information personnel, labor transfer information personnel, agricultural science and technology personnel, family planning personnel and health care personnel. The "five members" of team construction refer to safety officers, political propagandists, technical trainers, attendance officers and materials officers. The five members of the insurance industry refer to the counselors, co-compensators, accompanying visitors, villagers and housekeepers of the newcomers. The purpose of developing five members is to realize that every village has insurance and every household has insurance policies, and to realize the extension of services. Five-member substation refers to the certification of technical trainers, political propagandists, safety officers (and labor inspectors), material managers and economic assessment life members. The Ministry of Labor and the Ministry of Construction are issuing qualification certificates. Budget officer: (1) Under the leadership of the project manager, he is responsible for the preparation of the general construction schedule, the construction operation plan according to the objectives of the general schedule, and participates in the preparation of labor demand plan, mechanical equipment demand plan, material component supply plan and fund balance plan. (2) Participate in the preparation of construction organization design, grasp information such as labor force, material supply and mechanical configuration in time, and pay attention to flexible use. (3) Coordinate the relationship between plans, pay attention to the overall progress as the leader, and other resource allocation plans play a guarantee role in the overall progress. (4) Pay attention to collecting the information of the project duration visa, dynamically manage the duration, adjust the overall progress and track it. (5) Prepare the monthly ten-day construction operation plan, report the plan, participate in production scheduling and coordinate installation. (6) Under the guidance of leaders in charge, do a good job in the statistics of project commencement, completion, image progress, output value and physical quantity. (7) Do a good job in the accumulation of engineering data, establish a reasonable statistical account, establish an account in time, and guide the builder to keep a construction diary. The builder: The builder's job is to solve the relationship between the construction organization design and the site in the construction site. What is in the organizational design depends on the builder to supervise, measure, write the construction log, report the construction progress and quality, and deal with on-site problems. He is the liaison between the engineering headquarters and the construction team. Quality inspector: 1, implements the quality inspection evaluation standards and construction acceptance specifications promulgated by the state, and independently exercises the power of quality supervision, inspection and punishment according to regulations. 2, responsible for professional inspection, keep abreast of the quality of subdivisional work in each assignments section. 3. Be responsible for the quality evaluation of subdivisional work, establish quality files, and report the quality situation to the project chief engineer and superior quality management department on a regular basis. 4. Be responsible for recording the construction process and construction quality image data of each working procedure of subdivisional work and concealed work. 5. Report the nonconformities to the project chief engineer and the superior quality management department in time, supervise the professional engineers to formulate corrective measures, and assist in the quality loss assessment. Safety Officer: Ensure that there are no safety problems during the construction. Carry out the construction in strict accordance with the construction specifications and supervise at any time. Material Engineer: 1. Familiar with the construction technology, prepare the material plan, and organize the materials to enter the site as planned. 2. Be responsible for the quality of incoming materials and provide follow-up service. Master the use of materials. 3. Materials entering the site should be classified and stacked, and effective anti-corrosion, moisture-proof and anti-deformation (quality) measures should be taken according to the nature of the materials. 4. The reinspection materials shall be submitted for inspection in time, and shall correspond to the incoming materials. 5. Report the material loss on site in time. 6, to ensure zero inventory, rational application of overstocked materials. 7, the establishment of material analysis files (price, supply) timely feedback decision.