What is waste piping

Site waste piping refers to the vertical piping for conveying domestic waste in multi-story and high-rise buildings, mostly set up in the walls of stairwells, corridors, kitchens, service balconies, and other hidden places of the building, or in the piping room of the ****.

Site garbage pipeline, garbage transfer station

Site garbage pipeline consists of garbage hopper, garbage silo and garbage bin (or garbage room). Garbage well tube at the bottom of the centralized garbage dumpster is equipped with a garbage removal ash outlet, and is equipped with open and closed ash removal door. Storage of large garbage room permanent **** mechanical transmission device, the garbage into the garbage truck.

Construction site garbage pipeline product features:

1. Each floor set up a garbage inlet, and construction waste transfer station with the use of;

2. The floor of the construction waste through the pipeline transported to the location of the ****, to reduce the dust on the construction site;

3. Saves a lot of labor and costs, reduce the potential hazards of throwing garbage from the air.

Construction site garbage pipe, garbage transfer station

Construction site garbage pipe is made of non-combustible material; garbage hopper is commonly welded with steel frame; garbage shaft is commonly made of bricks or prefabricated with reinforced concrete, and the inner wall should be smooth. In order to prevent clogging, the inner diameter of the shaft should be greater than 350~400 millimeters. The top of the shaft should extend out of the roof, and set up ventilation holes to remove dirt and gas.

Site waste pipeline, waste transfer station

The high-rise building waste pipeline should also have flushing and fire-fighting equipment. This kind of garbage pipe belongs to the cold type (dry type), in addition to hot type (incineration type) and wet type (flushing type), but not commonly used.

Rubbish Pipeline,Rubbish Transfer Station

Construction Waste Transportation Pipeline Product Features:

1. Firm and stable, large capacity, centralized treatment to save space on site.

2. Simple operation and low cost, saving the labor cost of garbage disposal.

3. Centralized stacking can better deal with the dust problem.

4. Low input cost, saving 80% cost than traditional garbage disposal.

Hankun Industrial national customer cooperation cases (part):

China Construction*** Engineering Bureau Third Construction Engineering Co.

Shanxi Province Shanxi Construction Engineering (Group) Corporation East Extension of Longcheng Street Project in Jinzhong City, Shanxi Province

Xiaochang Shuanglong Construction Project Department of the Textbook Building of Xiaogan County Y*** Middle School in Xiaogan City, Hubei Province

Guangdong Province Shenzhen City, China China Hydroelectric Power Construction Group Fifteen Engineering Bureau Limited Shenzhen City, China Maocheng River Basin Water Environment Comprehensive Improvement Project, Project Manager Department of Bao'an Seventh Bid Project

p>Guizhou Province Guizhi District Baiya West Road Junyue Xi Yuan

Guizhou Province Guiyang City People's Hospital Branch, Yuxiao Line, Nanming District, Guiyang City

Guangdong Shaoguan City Wujiang District Xilian Town, Bijinyuan Sun City

Guangdong Province Huizhou City, Huiyang District, ****5 Road, Shenghui Garden Annex Housing Planning and Construction Bureau

Zhejiang Province Zhejiang Province Construction ****Group Co. Zhejiang Province Ningbo Municipal Party School Relocation Project

Guangzhou Mechanical Construction Group Limited Guangdong Province Guangzhou Zengcheng Yan Gang Bridge Mechanical Construction Site Project