1, construction organization design and approval form; 2. Safe and civilized construction scheme; 3, safety emergency rescue plan; 4, two prevention special construction scheme; 5, tower crane foundation special construction scheme; 6, tower crane special construction scheme; 7. Special anti-collision scheme for multi-tower operation; 8, manual digging pile special construction scheme; 9, steel special construction scheme; 10, formwork construction scheme; 1 1, concrete special construction scheme; 12, special construction scheme for unloading platform; 13, scaffolding special construction scheme; 14, TD-20 1 1 attached lifting scaffold construction scheme; 15, special construction scheme for horizontal protective shed; 16, temporary electricity construction scheme; 17, dust and noise prevention special construction scheme; 18, fire, electricity and fire safety special construction scheme; 19, special construction scheme at night; 20, inspection lot division special scheme; 2 1, witness sampling and inspection system for incoming goods, "three inspections" system for project quality and process inspection system; 22, the main structure entity detection scheme; 23, quality common fault prevention and control special scheme; 24. Special construction scheme for energy saving and thermal insulation.
Second, the responsibility system for production safety and target management
1, company qualification, certificates of managers at all levels (copies); 2. Notice of the establishment of the project department and the appointment of safety management personnel; 3, each type of work "safety technology operating rules" instructions; 4, managers and workers at all levels of production safety and civilized construction target responsibility; 5, management personnel at all levels of production safety responsibility system, management responsibility system assessment form; 6, the project economic contract safety production index notice; 7, the "safety production performance salary assessment system" notice; 8. Notice of leaders and management personnel on the System of Succession at Construction Site; 9. Notice of Security Risk Gold Mortgage Management System; 10, notice on "Management System for Preventing the Project Department from Arrears Wages of Migrant Workers"; 1 1, Notice on the System for Investigating Hidden Dangers of Arrears of Monthly Wages of Migrant Workers; 12, Notice of Emergency Plan for Wage Payment of Migrant Workers; 13, notice of fire safety management system and measures; 14, Notice on Management System of Safety, Civilization and Hygiene on Construction Site; 15, Notice on Management System of Major Hazard Sources; 16. notice of establishing contract management organization; 17, on-site fire emergency response plan; 18, safety fund use plan, safety production civilized construction measures fee use plan; 19, list of key management personnel; 20. List of full-time (part-time) safety officers
Third, the safety production management system
1, safety production education system; 2. Safety inspection system; 3, regular inspection (complex) inspection system; 4, construction safety technical disclosure and acceptance system; 5, special operations personnel management system; 6, major hazard management system; 7, production safety performance salary assessment system; 8, fire management system and measures; 9, security risk gold mortgage management system; 10, handover system for leaders and managers on the construction site; 1 1, a management system to prevent the project department from defaulting on the wages of migrant workers; 12, investigation system for hidden dangers of monthly wages owed to migrant workers; 13, the implementation of construction facilities
Four, safety education (safety signs)
1, safety instructions for construction workers; 2, three levels of safety education content; 3, the third-level education personnel roster; 4. Registration form of three-level safety education for employees; 5, management personnel, full-time (part-time) security personnel annual safety training registration; 6, change the type of work worker education registration form; 7, major hazard identification and remediation; 8, the company's three-level safety production site education records; 9, the construction site safety signs layout; 10, construction site safety signs list; 1 1, health care first aid measures; 12, a common slogan on the construction site; 13, learning records of safety production documents of cities, counties and companies.
Five, division (disciplines) engineering safety technical disclosure
1, safety technical disclosure cards and photos of general workers and steel workers, scaffolder, carpenter, concrete worker, electrician, tower crane elevator driver, contractor, etc. 2, foundation and foundation, the main structure, building decoration, building roof, building water supply and drainage, building electrical, elevator and air conditioning, fire protection, building energy saving and thermal insulation and other sub-projects safety technical disclosure records and photos.
Activities of intransitive verbs safety team
1, pre-shift safety activity system; 2. Activity book for safety group of digging pile workers, steel bar workers, scaffolder, carpenter, concrete worker, electrician and rigger.
Seven, subdivisional work safety technical requirements and acceptance
1, application form for formwork support system and acceptance record of formwork support system; 2, floor scaffolding acceptance record; 3, steel bar, template, concrete, hanging basket, discharging platform safety technical requirements and acceptance records. Three-level hot work application form.
Eight, safety inspection
1, security system; 2, hidden dangers rectification notice; 3, Tongliang county construction project construction site entity safety hidden danger daily checklist; 4, Tongliang county construction project construction site weekly (monthly) checklist; 5, the company's construction site quality and safety monthly checklist; 6, template support system inspection application form, template support system acceptance record; 7, attached lifting scaffolding, cantilever horizontal protective shed, template support system, unloading platform inspection acceptance table; 8. Application Form for Verification of Project Safety Production Stage.
Nine. Handling of industrial accidents
1, industrial accident statistical investigation report system; 2. Monthly report of employee casualties; 3, worker casualty accident account; 4, industrial accident registration form; 5. Quick report of major production safety accidents in engineering construction. 6. Personal accident insurance certificate.
X. Construction Permit Certificate and Product Certificate
1, construction permit; 2, special construction qualification certificate; 3, safety protection articles certificate and apply mutatis mutandis to card; 4, machinery, distribution box product certificate and apply mutatis mutandis to card.
XI. Management of Mechanical Equipment
1, acceptance sheet for mechanical equipment on the construction site; 2, small and medium-sized mechanical equipment, hand-held power tools, lifting equipment list; 3, small and medium-sized mechanical equipment, lifting equipment quality assurance information: ① factory certificate; (2) using certificates; ③ Qualification certificate of the demolition unit (copy); ④ Installation personnel's special operation certificate (copy); ⑤ Demolition scheme; 6. Check the acceptance report; ⑦ Maintenance records; 4, small and medium-sized mechanical equipment, hand-held power tools, lifting equipment acceptance records.
Twelve. Power consumption management
1, temporary electricity construction scheme; 2, temporary electricity engineering inspection and acceptance form; 3, temporary electricity engineering inspection and acceptance form; 4, electrician patrol records and maintenance records; 5, electrician operation certificate (copy); 6. Material certificate of power supply equipment; 7, leakage protector detection records; 8, grounding resistance test records.
Thirteen, employment management (special operations related certificates)
1, personal basic information registration form, copy of ID card, health certificate and safety education certificate; 2. Employment contract; 3, admission safety instructions, safety production responsibility; 4. List of migrant workers; 5. Wage table of migrant workers; 6, special operations personnel registration form; 7, special operations personnel operation certificate (certificate) copy.