1, the installation of medical equipment tape, according to the specific circumstances to determine the height of the installation, the installation of the ground at a distance of 1.3m-1.5m is more convenient to use.
2, new hospitals will be pre-buried pipeline, in the wall after the completion of painting and installation of medical equipment can be.
3, when fixing the equipment belt, according to the wall of the building using materials to determine the fixing method, ordinary concrete or brick wall with expansion bolts or steel nails to fix; light steel keel gypsum board, the use of self-tapping wire keel to fix or use aircraft expansion bolts to fix the wall is a foam lightweight bricks, with a high density of more than one expansion bolts to fix. Here is a tip, encountered back-to-back rooms, the use of pairs of fixed will be more solid.