Sample emergency plan for flood safety (General 5)
In the ordinary daily life, there will inevitably be some accidents, in order to avoid things getting worse, it is always necessary to pre-prepare an emergency plan. Emergency plan to how to prepare it? Here is my collection of flood safety emergency plan example (general 5), welcome to learn and reference, I hope to help you.
Flood safety emergency plan 1
Purpose: In order to ensure the normal life of the owners, work order operation and the safety of life and property, to ensure the normal operation of the equipment, so that the buildings and facilities and equipment in the summer safety flood control
Scope: the company's jurisdiction of the project
Supervision of the implementation of: project manager (the second working hours for the duty manager)
Responsibilities: project manager (the second working hours for the duty manager)
The project is not only a good example of how to prepare the emergency plan, but also an example of what to do. p>
Responsibilities: project property department, engineering technology department, security department is responsible for the supervision and implementation
Flood emergency procedures:
First, the flood control organization procedures
1, in the flood season before the arrival of the establishment of the flood control team, by the project manager as team leader, engineering department supervisor as deputy team leader, the team members of the security department supervisor, the director of the Department of the property department and the manager of the duty;
2, in the event of a dangerous situation, the project manager (second working hours for the duty manager), the project manager (second working hours for the duty manager). > 2, in the event of danger, the project manager is responsible for the deployment of material and human resources, the director of the Engineering Department is responsible for on-site command, customer service center manager, security manager is responsible for the deployment of the Department of personnel to cooperate with the rescue and relief. Danger occurs at night and on double holidays, the duty manager is temporarily responsible for command, and timely notification of other members of the flood control team to the scene.
Second, the flood engineering department flood control measures
1, the establishment of a special storage library for flood control equipment, storage of flood control equipment, the main should be a number of submersible pumps, drainage hoses, waterproof switchboard, woven bags, sand, shovels, etc.;
2, the key to the flood control equipment library should be in the Department of Security, Engineering and Technology Department, the Ministry of the project each stored a;
3, flood season Before the arrival of the engineering department maintenance personnel and security patrol personnel should be carefully inspected
(1) whether the roof platform drains are unobstructed, and at the same time will be the roof of the garbage removal clean;
(2) check the underground puddles of sewage pumps are sensitive and effective, and will be placed in the control of the "automatic" position;
(3) check the underground puddles of sewage pumps are sensitive and effective, and will control the "automatic" position;
(3) check the building inside and outside the rainwater wells, sewage wells, rainwater pipes whether there is a buildup, and be removed to ensure smooth drainage;
(4) check the power distribution room, central control room and other important rooms whether there is a leakage of rain, and if there is an occurrence of the case should be dealt with in a timely manner.
Third, the risk of handling procedures
1, if the rainwater into the underground machine room, the Ministry of Engineering staff should start the sewage pump drainage in a timely manner, and sandbags to block the door of the machine room to protect a variety of important equipment. At night and on double holidays, the duty manager, on the one hand, to organize personnel to rescue, on the one hand, immediately notify the project manager and other members of the flood control team;
2, security personnel by the security department manager command, a part of the personnel to maintain order, a part of the personnel to assist the Ministry of Engineering to remove the danger, rescue equipment;
3, the Ministry of property personnel to remove the various parts of the accumulated water;
4, the danger of After the occurrence of a comprehensive inspection, statistics on the damage caused by the flood and material consumption, and timely replenishment of flood control materials, ready for the next flood control;
5, the incident handling process should be recorded in detail, by the project manager to the leadership of the company to make a report.
Flood safety emergency plan 2With the arrival of the rainy season, according to the Liuyang City Safety Supervision Administration on doing a good job of the current safety of non-coal mine enterprises notice, flood prevention and flood control work is imminent. My mine in order to safe flooding, the development of flood prevention and flood control emergency plan, set up a flood control and flood control leading group, and equipped with sufficient supplies, equipment and other flood control supplies, to ensure that the mine is safe and smooth through the flood season. Its emergency plan is as follows:
First, emergency principles:
I mine adhere to the prevention-oriented, prevention and robbery combined, unified command, unified scheduling, the principle of obeying the overall situation, carry forward the spirit of unity against floods, in the mine flood control leading group under the unified guidance of the positive cooperation, unity, to ensure that the mine safe flood.
Second, the work plan:
Develop a flood prevention and flood control safety management system, and to do all the members of the flood awareness, and the system will be implemented to the various shifts, personnel. Timely flood safety education and flood control and flood control safety responsibility education. Frequently check the preparation of flood prevention and flood control materials and the operation of flood control equipment to ensure emergency response when floods come. Strengthen the logistical support and service work, to ensure that personnel, materials, equipment and site work all safe.
Third, the establishment of the flood control front command, clear responsibilities:
Commander-in-chief: xxx
Deputy Commander-in-chief: xxx
Members: xxxxxxxxxx
Commander-in-chief: the whole mine within the scope of the overall responsibility of flood control, unified command of the work of flood control.
Deputy commander-in-chief: responsible for the implementation of the first program, mobilize flood personnel and the required materials. Timely preparation of rescue equipment, according to the order of the commander-in-chief quickly run to the designated location, and is responsible for relief personnel accommodation and other matters.
Members: the implementation of the instructions of the commander-in-chief, responsible for the supply and reserves of flood control materials, equipment deployment and transportation and rescue work of all related matters. Medical group: Nanyue Village Health Center staff, responsible for the treatment of personnel injured in the rescue process.
Fourth, the emergency program:
(1), the establishment of the mine director as the command of the front line of the flood control headquarters, division of labor, clear responsibility, to ensure that the responsibility to the person, strengthen the scheduling, to do all the action command, all actions listen to the command, the flood season, the arrangement of the site of the special person on duty, and set up the flood control and flood rescue team.
(2), do a good job of material supply plan, arrange for the preparation of flood prevention and flood control materials, before the flood season comes, prepare enough woven bags, sand, water pumps, shovels, raincoats and other flood control materials.
(3), put into the rescue site of the loader, generator Yew strengthen maintenance and repair, to ensure that the flood season comes when the equipment can operate normally, special periods can give full play to the emergency role of the equipment.
(4), the ground by the flood threatened materials and equipment, by the mine commander-in-chief of the unified arrangements, as far as possible to carry to the high safety zone.
(5), the commander-in-chief according to the water level changes, the organization of flood control team members as far as possible to dredge the flood channels, to minimize the loss of property in the mine.
(6), the custodian group by Xie Xiyuan is responsible for, in accordance with the requirements and instructions of the command, the issuance of anti-flood flood rescue work required tools, materials and supplies, to ensure that the flood rescue work can be carried out smoothly.
(7), the medical group by the Nanyue village health center medical staff. Medical personnel in the rescue period, to be on the spot for the rescue process of the injured personnel for timely treatment, for the more serious injuries, to be sent to the hospital in time for treatment.
(8), the car group by Xie Haibo is responsible for the rescue period to have enough cars to transport the injured and medical personnel.
(9), communication group by Xiong Shanbao is responsible for the accident is responsible for convening the flood rescue personnel and contact the relevant units of the higher level, and timely report to the commander-in-chief of the higher level of the relevant spirit and instructions.
(10), if the accident is too big, the unit can not handle the situation, should immediately notify the mine rescue team to request rescue. Note: This emergency plan can only be activated and implemented after a flood accident.
V. Quantity of emergency equipment and materials prepared and where to store them:
Plant Custodian
Flood Safety Emergency Response Plan 3I. Purpose
In order to protect the life and safety of the workers, to ensure that when the rainy season flood season arrives, to ensure that the engineering personnel Life and property safety, to protect the construction site of normal construction, to control losses to a minimum, according to the national, provincial, municipal and county documents on flood control, and to this end, the development of "Sichuan Hangjian Foxconn employee security housing (Phase I), the fourth section of the Ministry of the rainy season flood emergency plan".
Second, the organization
Sichuan Hangjian Foxconn employee protective housing (a) the fourth section of the Ministry of the rainy season flood emergency leading group:
Leader: Liu Zhi
Deputy Leader: Yen Bing
Members: Dong Lei, Yu Heng, Lin Xiaochun, Wang Lizhong, Wang Zhonghua
The first section of the Foxconn Foxconn employee protective housing, the second section of the Ministry of the Rainy Season flood emergency response plan. >
Sichuan Hangjian Foxconn employees protective housing (Phase I) fourth section of the project department rainy season flood emergency rescue leading group located in the project office.
Third-party rescue contact:
First aid telephone 120, alarm telephone 110, fire telephone 119
Third, the basic principles
Flood control work adhere to the "safety first, unremitting, preventive-oriented, full emergency" policy.
Flood control work adhere to the "safety first, always be prepared, prevention-oriented, all-out rescue" policy, actively develop and implement flood control planning, strengthen drainage measures, scaffolding reinforcement, and electrical equipment management inspections, strengthen the collection of weather forecasts, so as to prevent accidents before they occur.
1), (Liu Zhi) is responsible for on-site guidance, and do a good job of coordination with various departments.
2), (Dong Lei), (Yu Heng), (Lin Xiaochun) is responsible for tracking and checking the construction and finished product protection of each work surface.
3), (Wang Lizhong) is responsible for the safety management of the construction site, and do a good job in the rain and summer construction safety education.
4), (Yan Bing) is responsible for the site of the reasonable stacking of materials, rain and moisture, all kinds of machinery and equipment maintenance, and do a good job in the preparation of flood control equipment.
5), (Zhang Chengyi) is responsible for the temporary electricity, equipment and machinery insulation checks to prevent wire broken skin, leakage and so on.
Fourth, the preparation of materials:
According to the specific circumstances of the project, prepare the equipment and materials used in flood control. Prepare pumps, water pipes, tarpaulins, shovels, etc., the equipment required for rain prevention should be prepared sufficiently, the required equipment must be maintained in good condition.
Flood Safety Emergency Plan 4In order to strengthen the school's flood prevention work, effective prevention of floods, reduce the damage caused by flooding on the school, to protect the national property, the majority of teachers and students of life safety, maintenance of the normal order of the school, now combined with my school. The actual situation, the development of this plan.
I. Flood control and flood emergency leading group
Group leader:
Deputy leader:
Group member:
Second, the main responsibilities
1, strengthen the leadership, improve the organization, strengthen the work of responsibility, and to strengthen the flood control and flood fighting Work research, improve the development of various emergency plans and the implementation of various measures.
2, make full use of various channels of publicity and education on flood prevention and flood control knowledge, organize and guide the popularization of knowledge of flood prevention and flood control for all teachers and students, widely carry out self-help and mutual rescue training in flood prevention and flood control, and constantly improve the awareness and basic skills of the majority of teachers and students to prevent floods and flood control. Strengthen the ideological work of teachers and students, do not cause unnecessary panic, to ensure that the normal teaching order.
3, seriously improve the material security, strictly in accordance with the requirements of the plan to actively raise storage, implementation of food and water, freezing rain, teaching materials, teaching aids, emergency equipment and other materials to implement, strengthen the management, so that it always maintains a good state of readiness.
4, take all necessary means to organize all aspects of the force to carry out comprehensive flood control work, flood control and flood damage caused by the minimum.
5, seriously implement the relevant policies and regulations. In accordance with the requirements of the relevant flood control, to establish a daily monitoring system of the weather, and at any time to report the development of the disaster, to accept the supervision and inspection of the leaders in charge, to prevent sudden flood disasters. Dangerous walls, dangerous toilets, dangerous houses and other important parts of the establishment of warning signs and give timely maintenance; timely cleaning of gutters, to maintain smooth water flow.
6, effectively implement flood prevention and control measures. School flood prevention and mitigation leading group to get in touch with the higher authorities in a timely manner, the school flood disaster risk prediction, the degree of danger to make an evaluation, prediction. During the storm activity, we should try to avoid organizing large-scale assemblies and activities for teachers and students; during the examination period, we should make every effort to prevent and ensure that the examination is carried out smoothly. Once a disaster occurs, it should be reported in a timely manner, early start the flood emergency plan to minimize casualties and property damage.
7, carry out school houses, the surrounding landscape survey, scientific development of flood disaster prevention and control measures. Under the unified leadership of the school flood mitigation leading group, all departments should closely cooperate, collaborate, exchange intelligence, to ensure that the information is smooth, to do the top of the situation, the bottom of the situation reported in a timely manner to grasp the weather conditions. To be based on the identified danger points, hidden danger points to implement the disaster prevention plan and group defense network, for the development of flood prevention and control measures to provide the correct basis.
8, improve the system, enhance emergency response capacity. To further improve the duty system, risk patrol system and disaster report system. All departments should implement the duty, take the lead system, the danger zone inspection tour, the implementation of preventive measures, change the passive disaster prevention into active disaster prevention.
9, mobilize all positive factors, quickly restore the order of education and teaching, and comprehensively ensure and promote social security and stability.
Third, flood relief emergency measures:
1, after receiving the superior flood forecast, the rapid start of the plan, the leading group of flood control and flood rescue team members quickly in place, each in its own way, organized, orderly evacuation to the safer section. The leading group immediately entered the state of emergency, according to the release of relevant information and alerts, the overall organization of the flood control work.
2, the organization of the relevant personnel to carry out a comprehensive inspection of the building belonging to the blocking, closing the dangerous places, stop the large-scale indoor activities.
3, the leading group of flood control and flood rescue team members in the flood rescue, in order to ensure the safety of teachers and students under the premise of maximizing the protection of school property will be the transfer of valuable materials and equipment to a safe place.
4, to strengthen the management of flammable and explosive substances, toxic and hazardous chemicals, to strengthen the janitorial room, computer room and other important places of protection to ensure that flood mitigation is carried out smoothly.
5, strengthen the general publicity and education of teachers and students, do a good job of teachers and students, students and parents of ideological stability. The person in charge, the classroom teachers and teachers *** with the management of students, students are strictly prohibited from running around, scurrying, to ensure student safety.
6, timely notification of health and epidemic prevention departments to the school to do a good job of rescue and epidemic prevention.
7, to strengthen all kinds of duty duty, to maintain smooth communication, timely grasp of the situation, and make every effort to maintain normal teaching and working order.
8, according to the plan to implement the material preparation.
9, quickly carry out the rescue of personnel as the main content of the scene rescue work, timely transfer of injured people to the nearby rescue station rescue.
10, strengthen the campus duty and patrol, to prevent all kinds of criminal activities. Flood relief process to strengthen the security work, and actively contact the police station to ensure that the lives and property of teachers and students and school property safety, to combat illegal and criminal activities, to ensure that the normal teaching and living order of the school.
11, in time to the disaster, the school flood relief situation reported to the township government, the municipal education bureau flood relief office, depending on its situation to request assistance.
12, in the flood emergency operations, all departments should work closely with, obey the command, to ensure smooth flow of orders and the implementation of the work
This plan has been implemented since the date of enactment.
Flood safety emergency plan 5County is the county's political, economic and cultural center, the Beijing-Guangzhou Railway, 107 State Road in the eastern part of the county across the north and south. Urban area of 7 square kilometers, residential population of 62,000 people. In order to ensure the safety of the county flood, in line with the principle of prevention, the combination of prevention and rescue, the development of this emergency plan.
First, the focus of flood control
According to the division of responsibilities, I focus on the urban area of Kangzhuang Road, Zhenxing Road, Shengli Road, the three overpasses, the construction site of the project and excavation of pits of flood control and drainage work.
Second, flood control measures
(a) the division of responsibility for flood control
County Housing and Urban-Rural Development Bureau set up a flood rescue team, captained by the Secretary Zhang Jianmin, deputy director by the deputy director of the Zhao Wei as, under the jurisdiction of the four teams, which:
The first team is responsible for the KangZhuang road overpass drainage The first squad is responsible for the Kangzhuang Road overpass drainage rescue work, by comrade Zhao Wei is specifically responsible for;
The second squad is responsible for the Shengli Road overpass drainage rescue work, by comrade Li Congjun is specifically responsible for;
The third squad is responsible for the Zhenxing Road overpass drainage rescue work, by comrade Wu Youchen is specifically responsible for;
The fourth squad is responsible for the three overpasses anti-fouling project equipment, material preparation, delivery and larger danger of the Repair work, by the municipal company manager Comrade Hao Su Jie specifically responsible for (specific team members list attached).
The construction projects in the corresponding establishment of flood rescue commando, clear task, responsibility to the person (specific project captain list attached).
(B) rescue material preparation
County Housing and Urban-Rural Development Bureau to prepare drainage electromechanical pumps 8 sets, in time to do a good job of repairing electrical equipment, to ensure the normal operation of the flood season. Municipal Corporation to prepare an excavator, forklift 1, 1000 woven bags, 200 stakes, 2 tons of wire, sand 50 cubic meters, when the danger appeared, to ensure that the material will be transported to the scene in a timely manner.
The project departments under construction depending on the project, prepare enough materials for the rescue.
(C) water transmission
Flooding 24-hour duty system and leadership system. County Housing and Urban-Rural Development Bureau composed of three people patrol inspection team, special attention to weather conditions, day and night monitoring of key areas of flood control, found that the danger quickly by phone, cell phone or assign someone to report the danger, and the organization of rescue commando on duty.
(D) emergency measures
When the city three overpasses appear rain, the county housing and urban-rural development immediately organize electricians, start electromechanical pumps for drainage; when there is more than moderate rain larger rain, the team members quickly rushed to the east of the bridge, bridge on both sides of the west, set up a warning sign, divert pedestrians and vehicles until the water under the bridge row can be evacuated. The construction site of the project under construction in danger, by the project department to organize rescue commando responsible for rescue, and timely report the danger.
;