How to apply for a construction permit "construction unit construction safety measures" written?

Construction unit construction safety measures template is as follows:

One, project overview

Two, each unit project safety construction responsibility

Three, project safety construction measures and construction unit project management system

Four, civilized construction and construction safety internal data and file management

One, project overview:

1, project name:

2, construction unit:

3, on behalf of the construction unit:

The construction unit:

The construction unit is the first to apply for a construction permit.

1, project name:

2, construction unit:

3, on behalf of the construction unit:

4, design unit:

5, construction scale: 20 million yuan

6, construction area: 10,212.74M

7, number of floors: six floors, total height: 22.5M

8, construction Duration: 180 calendar days

9, building grade: the reasonable service life of the main structure is 50 years.

10, building fire classification: two types of multi-storey buildings.

11, superstructure system: anti-seismic intensity: 7.5 degrees, the safety grade is second class. Roof waterproof grade is three, frame structure.

12, the construction site: xiamen jimei district polytechnic road 600

second, the units of engineering safety construction responsibility

in order to strengthen the supervision and management of construction project construction safety production, to protect the safety of persons and property, according to the "people's Republic of China *** and the country's construction law", "people's Republic of China *** and the country's safety production law", "construction project safety production Management Regulations", "Xiamen City Building Regulations" and other laws and regulations, combined with the actual situation of the project, the development of this safety construction measures. All units and individuals who carry out construction activities in the project as well as those who are related to the construction activities of the project must comply with these safety construction measures. The construction of the project shall comply with the provisions of laws, regulations and rules, and shall not jeopardize the interests of the public **** and the legitimate rights and interests of others. Construction project construction safety management must adhere to the safety first, prevention-oriented policy, adhere to the principle that the management of production must manage the safety and who is in charge of who is responsible for the establishment and improvement of the production safety responsibility system and group prevention and control system.

The construction unit of the project is responsible for the supervision and management of construction safety production of the project. At the same time entrusted Xiamen Hedao Supervision and Consulting Co., Ltd. specific implementation of construction project construction safety supervision and management. Any unit or individual has the right to stop and report to the relevant departments for violating the laws, regulations, rules and standards of construction safety management. The periphery of the construction site land of this project shall be equipped with safety warning signs in accordance with the regulations, and isolation measures shall be taken at the dangerous places of the project. The temporary facilities, materials and equipment of the construction site of this project shall not occupy the underground municipal pipelines.

Chapter I of the construction unit of construction safety management responsibilities

(a) the construction unit must implement the engineering construction procedures, shall not be survey, design, construction, engineering supervision and other units to provide not in line with the construction safety production laws, regulations and mandatory standards requirements, the development of a reasonable duration, shall not be compressed contractual period.

(ii) construction shall be in accordance with relevant provisions of the construction project to provide safe production, civilized construction technical measures cost.

(3) before construction, must provide the construction unit with relevant information on underground pipelines and related safety protection conditions, and organizations survey, design, supervision and construction units for survey and design documents safety technology.

(d) the construction unit separately contracted or designated professional subcontracting projects, subcontracting units do not obey the safety management of the general contracting unit, the occurrence of safety accidents, by the subcontracting unit to bear the main responsibility.

(E) the construction unit shall provide the construction site and adjacent areas of water supply, drainage, power supply, gas supply, heating communications, radio and television and other underground pipeline information, meteorological and hydrological observation data, adjacent buildings and structures, underground works of the relevant information, and to ensure that the information is true, accurate and complete.

(F) the construction unit shall not interfere with the normal construction activities of the construction unit, shall not expressly or implicitly construction unit to purchase, lease, use of safety protection gear, machinery and equipment, construction equipment and accessories, fire safety facilities and equipment do not meet the requirements of safe construction. More shall not be forced to direct the construction unit to purchase or use of construction materials, safety protection equipment does not meet the technical standards.

(VII) construction unit will be the project site of the buildings, structures removed, remove waste, and to provide a level construction site to the construction unit.

Chapter II supervision unit construction safety management responsibilities

(a) before construction, the superintendent engineer is responsible for reviewing the construction organization design, and looking for the general contractor, subcontractor construction organization design from the construction of safety measures to coordinate the convergence of technical measures; is responsible for the review of the construction safety of construction works start conditions.

(2) of the general contractor, subcontracting units in the construction of the handover process or cross operation involves timely coordination of construction safety issues.

(C) supervision personnel should strengthen the construction site daily safety inspections and checks, supervise the construction unit to implement the responsibility for safety production, found that hidden safety accidents and violations of construction safety standards or safety practices. To be stopped and corrected in a timely manner

Chapter III of the construction unit's safety management responsibilities

(a) construction site safety by the construction unit is responsible for. The project implementation of construction general contracting, general contracting is responsible for subcontracting units to the general contractor is responsible for, subject to the general contractor on the construction site safety management. The general contractor shall complete the construction of the main structure of the construction works. General contracting unit according to law will be subcontracted to other units of construction works, subcontracts should be clear in their respective rights and obligations in terms of production safety. The general contractor and subcontracting unit of the subcontracted works of production safety bear joint and several responsibility. Subcontracting unit should obey the general contractor's production safety management, subcontracting unit does not obey the management of production safety accidents caused by the subcontracting unit to bear the main responsibility.

(2) the construction unit shall establish and improve the production safety responsibility system and production safety education and training system, formulate production safety rules and regulations and operating procedures, to ensure that the unit of production safety conditions required for the investment of funds, the construction works undertaken by the regular and special production safety inspections, and make a good record of safety inspections. Carry out regular and special safety inspections of the construction projects undertaken, and guide the work; the project manager is appointed by the person who has obtained the corresponding licensing qualification, and is specifically responsible for the construction safety of this construction project, and is responsible for the safe construction of the construction project, implements the system of responsibility for safety production, safety production rules and regulations and operating procedures, ensures the effective use of safety production expenses, and organizes the formulation of safety construction measures, eliminate hidden dangers of safety accidents, and report production safety accidents in a timely and truthful manner.

(3) the construction unit in the preparation of the construction organization design, according to the nature of the construction project, scale, characteristics and environmental conditions of the construction site, to develop and implement special construction safety and technical measures, and to all the construction management personnel, operators for safety and technical briefing. Construction unit No. 1 should be held at least once a safety meeting, by the project manager or corporate representative and his entrusted leaders in charge of the project to convene the relevant personnel to participate in the analysis of the project's safety situation, to determine the implementation of preventive measures for safety. At the same time will be safe production work conference should form a written summary.

(d) the construction unit of the construction project may cause damage to adjacent buildings, structures and underground pipelines, etc., should take special protective measures. Where the condition of the construction site does not meet the relevant safety and technical standards or does not have the safety conditions required to start work, shall not start.

(E) construction unit before the start of construction, according to the nature, scale and characteristics of the construction project, the establishment of production safety management organization, with full-time production safety management personnel, full-time production safety management personnel shall be in line with the State Council administrative department in charge of the construction of the State Council in conjunction with its sub-departments of the relevant departments of the regulations formulated. Full-time production safety management personnel to clarify the specific scope of responsibility for construction safety management, is responsible for on-site supervision and inspection of production safety. Discovery of hidden safety accidents, should be promptly reported to the project manager and production safety management organization; for unauthorized command, unauthorized operation, should be immediately stopped,

(F) construction project before construction, the construction unit responsible for project management of technical personnel should be on the technical requirements related to safety construction to the construction work team, the operating personnel to make a detailed explanation, and the two sides to sign to confirm. Construction unit in the construction process, should be based on the construction organization design and construction progress, to the different types of operators to carry out special safety technology delivery.

(VII) the construction unit shall establish, build the construction management personnel, operators of the daily safety education, technical training and assessment system, and seriously organize the implementation; the construction unit shall not arrange for the construction management personnel and operators who have not received safety education, technical training, or qualified construction management personnel and operations without assessment. The construction unit shall carry out at least one production safety education and training for management personnel and operating personnel every year, and its education and training is recorded in the personal work file. Production safety education and training assessment failed personnel, shall not be on duty. Operating personnel to enter a new position or a new construction site before, should receive production safety education and training. Without education and training or education and training assessment of unqualified personnel, shall not be on duty. Construction unit in the use of new technologies, new techniques, new equipment, new materials, should be the corresponding production safety education and training of operators. The construction unit shall apply for accident insurance for the personnel engaged in dangerous work at the construction site.

(h) vertical transportation machinery operators, installation and dismantling workers, demolition workers, blasting operators, lifting signal workers, elevated erection operators and other special operators, must participate in professional training in accordance with relevant state regulations, after passing the examination and certification: the construction unit shall not be arranged without obtaining the relevant special types of assessment of personnel engaged in special types of work.

(IX) the construction unit shall, in accordance with the relevant national standards, industry standards or local standards, set up safety protection facilities at the construction site, and meet the following requirements:

1, according to the different construction phases of the construction project and the construction progress, timely adjustment and improvement of safety protection facilities;

2, the construction unit shall be at the entrance to the construction site out of the construction, construction cranes, Temporary electric facilities, scaffolding, access to the entrance, stairway, elevator shafts, holes, the edge of the pit, explosives and hazardous gases and liquids, and other dangerous parts of the construction site and accident-prone areas, set up a clear safety warning signs. Safety warning signs must comply with national standards;

3, the construction unit should be based on the actual and surrounding environment and seasonal and climatic changes, the construction site to take appropriate safety construction measures. Set up or adjust the special safety protection facilities, and carry out relevant safety inspections;

(10) The construction unit shall install, use and dismantle the construction machinery and electrical equipment, and shall comply with the following provisions:

1, prior to installation, it shall be tested in accordance with the prescribed safety and technical standards, and shall be installed only after passing the test;

2, prior to use, it shall be tested in accordance with the prescribed Safety technical standards for safety performance testing, acceptance and qualified before use;

3, during the use of the period, should designate a person responsible for the maintenance, maintenance, to ensure the safety of its use.

4, installation, dismantling must be carried out in accordance with the original factory regulations, and the development of safe working measures, by the professional team under the unified guidance of professional and technical personnel, and to have the relevant technical and safety personnel present to monitor.

(xi) the construction unit of the construction site temporary electricity and other large-scale hazardous sub-parts of the project to prepare a special construction program, with the results of safety calculations, signed by the construction unit of the technical director, the superintendent of the engineer after the implementation of the full-time production safety management personnel to carry out on-site supervision. In the construction project construction site installation, use of temporary power lines and power facilities, must comply with the relevant technical standards, norms and safety regulations, to maintain power distribution facilities and distribution lines in a safe and reliable state.

(xii) construction site fire operations should be consistent with fire safety technical standards and norms. Construction unit should be single in the construction site to establish fire safety responsibility system, determine the fire safety responsibility, develop fire, electricity, the use of flammable and explosive materials and other fire safety management system and operating procedures, set up fire escapes, fire fighting water, equipped with fire fighting equipment and fire fighting facilities and equipment, and set up a clear sign at the entrance to the construction site. Construction units, supervision units shall check and urge the construction unit to establish the construction site fire prevention, security system, and set up fire, security facilities as required.

(xiii) the construction unit shall promptly provide construction management personnel and workers with construction safety necessary for safety and protective equipment and safety protective clothing, labor protective equipment in accordance with the prescribed standards, and inform in writing of the operating procedures of dangerous jobs and the hazards of unauthorized operation.

(xiv) the construction unit included in the construction project budget estimates of the safe working environment and safety construction measures required, should be used for the implementation of construction safety measures, safety conditions for the improvement of production, and shall not be diverted to other uses.

(xv) the construction unit to do a good job in the construction site of the construction works of all kinds of employee living facilities, should be in line with the requirements of the relevant state regulations. Construction site temporarily erected buildings should meet the requirements of safe use. Construction site use of assembled mobile homes should have product certification. The construction unit shall set up the office and living area of the construction site separately from the operation area and keep a safe distance; the site selection of the office and living area shall meet the safety requirements. The meals, drinking water and resting places of the employees shall meet the hygiene standards to prevent food poisoning and various epidemics. The construction unit shall not set up employee collective dormitories in buildings that have not yet been completed. At the same time the construction unit shall do a good job of supervision and inspection.

(16) construction unit of this construction project construction site should be on-site safety and health medical emergency rescue measures, equipped with first aid supplies.

(xvii) construction unit safety management personnel, construction safety management responsibility should strengthen the construction site daily safety inspection, inspection, supervision of construction workers to comply with the relevant safety regulations, found that the construction safety hazards and violations of construction safety and technical standards or safety practices, and promptly be stopped, corrected.

(xviii) The construction unit shall comply with the provisions of the relevant environmental protection laws and regulations, and take measures at the construction site to prevent or reduce the hazards and pollution of dust, exhaust, waste water, solid waste, noise, vibration and construction lighting on people and the environment. In the construction of this project, the construction unit shall set up safety warning signs in the perimeter of the site land in accordance with the regulations, and take isolation measures at the dangerous places of the project.

(xix) the construction unit procurement, leasing of safety protective gear, machinery and equipment, construction machinery and accessories, should have the production (manufacturing) license, product certification, and check before entering the construction site. Safety protective gear at the construction site. Mechanical equipment, construction machinery and accessories must be managed by specialized personnel, regular inspection, maintenance and insurance, the establishment of appropriate information files, and in accordance with relevant state regulations in a timely manner scrapped.

(20) construction unit in the use of construction machinery and facilities, should be organized by the relevant units for acceptance, can also be entrusted with the appropriate qualifications of the inspection and testing institutions for acceptance; the use of leased machinery and equipment and construction equipment and accessories, by the general contractor, subcontracting units, leasing units and installation units **** with acceptance. Acceptance before use. "Special Equipment Safety Supervision Regulations," the construction of lifting machinery, before acceptance should be qualified by the appropriate inspection and testing organizations to supervise and pass the test. Construction units should be since the construction machinery erection facilities within 30 days from the date of acceptance, to the competent administrative department of construction or other relevant departments to register. Registration mark should be placed or attached to the equipment in a prominent position.

Chapter IV project safety construction measures and construction unit project management system

1, the construction unit engaged in construction projects such as new construction, expansion, alteration and demolition of activities, should have the national provisions of the registered capital, professional and technical personnel, technical equipment and safety conditions, according to law, to obtain the appropriate level of qualification certificates, and its qualification level within the scope of the license to undertake the project.

2, the main person in charge of the construction unit according to law is fully responsible for the unit's production safety work. The construction unit shall establish and improve the production safety responsibility system and production safety education and training system, the development of production safety rules and regulations and operating procedures to ensure that the unit of production safety conditions required for the investment of funds, the construction works undertaken by regular and special safety inspections, and make a good record of safety inspections. The project manager of the construction unit shall be a person who has obtained the corresponding licensing qualification, and shall be responsible for the safe construction of the construction project, implement the system of responsibility for production safety, production safety rules and regulations and operating procedures, ensure the effective use of production safety expenses, and organize and formulate safety construction measures according to the characteristics of the project, eliminate hidden dangers of safety accidents, and report production accidents in a timely and truthful manner.

3, the construction unit for the construction project budget estimates included in the safe working environment and safety construction measures required, should be used for the construction of safety protection equipment and facilities procurement and updating, the implementation of safety construction measures, the improvement of safety production conditions, and shall not be diverted to other uses.

4, the construction unit shall set up production safety management organization, with full-time production safety management personnel. Full-time safety and production management personnel are responsible for on-site supervision and inspection of production safety. Found hidden safety accidents, should be promptly reported to the project manager and production safety management organization; for unauthorized command, unauthorized operation, should be immediately stopped.

Methods for equipping full-time production safety management personnel shall be formulated by the competent department of construction administration under the State Council in conjunction with other relevant departments of the State Council.

5, the construction project to implement construction general contracting, the general contractor is responsible for production safety at the construction site.

6, vertical transportation machinery operators, installation and dismantling workers, demolition workers, blasting operators, lifting signal workers, elevated erection workers and other special operators, must be in accordance with relevant state regulations after special training in safety operations, and obtain a special operation qualification certificate, before they can work.

7, the construction unit should be in the construction organization design of the preparation of safety and technical measures and construction site temporary electricity program, the following to reach a certain size of the hazardous sub-items of the project preparation of special construction programs, with the results of the safety calculations, by the construction unit of the technical officer, the superintendent of the construction engineer signed the implementation of the full-time safety management personnel to carry out on-site supervision.

8, before the construction project, the construction unit responsible for the project management of technical personnel should be on the technical requirements related to safety construction to the construction team, the operator to make a detailed description, and signed by both parties to confirm.

9, the construction unit should be at the entrance to the construction site, construction cranes, temporary power facilities, scaffolding, access to the mouth, holes, bridges, tunnels, pit edges, explosives and hazardous gases and liquids, and other dangerous parts, set up a clear safety warning signs. Safety warning signs must comply with the national air standards.

Construction units should be based on different construction stages and the surrounding environment and seasonal and climatic changes in the construction site to take appropriate safety construction measures. Construction site is temporarily suspended, the construction unit shall do a good job of on-site protection, the required costs have the responsible party to bear, or in accordance with the contract.

10, the construction unit shall be set up on the construction site of the office, living area and operation area separately, and maintain a safe distance; office, living area site selection should be in line with the safety requirements. Employee meals, drinking water, resting places and so on shall comply with health standards. The construction unit shall not set up employees' collective dormitories in buildings that have not yet been completed. Temporary buildings erected on the construction site shall meet the requirements for safe use. Construction site use of assembled mobile homes should have product certification.

11, the construction unit for the construction works may cause damage to neighboring buildings, structures and underground pipelines, etc., shall take special protective measures.

12, the construction unit shall comply with relevant environmental protection laws and regulations, in the construction site to take measures to prevent or reduce dust, exhaust, waste water, solid waste, noise, vibration and construction lighting hazards and pollution of people and the environment.

13, in the urban areas of the city's construction projects, the construction unit shall be closed to the construction site fencing.

14, the construction unit single in the construction site to establish fire safety responsibility system, to determine the fire safety personnel, the development of fire, electricity, the use of flammable and explosive materials and other fire safety management system and operating procedures, set up fire escapes, fire fighting water sources, equipped with fire fighting facilities and fire extinguishing equipment, and set up a clear sign at the entrance to the construction site.

15, the construction unit shall provide safety protective gear and safety protective clothing to the operators, and inform in writing of the operating procedures of dangerous jobs and the hazards of unauthorized operation.

16. Operators have the right to criticize, report and complain about the safety problems in the operating conditions, operating procedures and operating methods at the construction site, and have the right to reject unauthorized command and forced risky operations.

17, in the construction of emergency situations that endanger personal safety, the operators have the right to immediately stop the operation or take the necessary emergency measures to evacuate the danger zone.

18, the operator should comply with the mandatory standards of safety construction, rules and regulations and operating procedures, the correct use of safety equipment, machinery and equipment.

19, the construction unit procurement, leasing of safety protective gear, machinery and equipment, construction equipment and accessories, should have production (manufacturing) license, product certification, and check before entering the construction site.

20, the construction site of the safety protection gear, machinery and equipment, construction machinery and accessories must be managed by specialized personnel, regular inspection, repair and maintenance, the establishment of the corresponding data files, and in accordance with relevant state regulations in a timely manner scrapped.

21, the construction unit in the use of construction machinery and overall lifting scaffolding, templates and other self-erecting erection facilities before the organization shall organize the relevant units for acceptance, but also can be entrusted with the appropriate qualifications of the inspection and testing agency for acceptance; the use of leased machinery and equipment and construction equipment and accessories, by the general contractor for the construction of the unit, subcontracting units, leasing units and installation units*** with acceptance. The use of rented machinery and equipment and construction equipment and accessories shall be accepted by the general contractor, subcontracting unit, renting unit and installation unit *** together. Acceptance before use.

22, "Special Equipment Safety Supervision Regulations," the construction of lifting machinery, in the acceptance should be qualified by the appropriate inspection and testing organizations to supervise the inspection.

23, the construction unit should be since the construction of lifting machinery and overall lifting scaffolding, templates and other self-erection facilities within 30 days from the date of acceptance, to the competent administrative department of construction or other relevant departments to register. Registration mark should be placed or attached to the equipment in a prominent position.

24, the construction unit of the main person in charge, the project manager, full-time production safety management personnel should be qualified by the competent administrative department of construction or other relevant departments before taking office.

Construction units should be managers and operators at least once a year for production safety education and training, their education and training is recorded in the individual work files. Production safety education and training assessment failed personnel shall not be allowed to work.

25, operating personnel into new positions before the new construction site, should receive safety education and training. Without education and training or education and training assessment of unqualified personnel, shall not be on duty.

26, the construction unit in the use of new technologies, new techniques, new equipment, new materials, should be the corresponding production safety education and training of operators.

27, the construction unit should be engaged in dangerous work for the construction site for accidental injury insurance.

28, construction workers in the construction process should meet the following safety requirements:

(1) in accordance with the technical standards for construction safety and the safety of the type of construction work;

(2) workers should comply with the mandatory standards for safe construction, rules and regulations and operating procedures, in accordance with the relevant provisions of the national labor protection, the correct use of safety protective gear, machinery and equipment, etc.;

(3) in the construction of emergency situations that jeopardize personal safety or find abnormalities in the safety of the construction site, the operators have the right to immediately stop the operation or evacuate from the danger zone after taking the necessary contingency measures and report to the safety administrator or construction management personnel. Construction workers on the management personnel in violation of construction safety technical standards or safety operation procedures operation instructions, the right to refuse to carry out, may affect human health and personal safety of the operating procedures, operating conditions, the right to put forward suggestions for improvement, and may be responsible for the construction safety management, construction safety supervision bodies of the construction project, the right to report on unauthorized directing prosecution, report.

(4) Operators have the right to criticize, report and charge the safety problems in the operating conditions, operating procedures and operating methods at the construction site, and have the right to reject the unauthorized command and forced risky operations.

29, the enterprise's subordinate engineering contractors for safety management of a clear power obligations of an economic measure, in the economic contract, agreement to be clear with the economic linkage of the specific methods and measures to achieve a clear distinction between rewards and punishments, the economic contract, the agreement has a safe production targets. The economic contract and agreement shall enter into force after both parties have signed it. Signed economic contract, agreement (production safety indicators) and in the construction site safety management information on file for inspection.

30, the development of the completion of the safety management objectives to meet the standard plan of the practical steps and measures, as well as assessment of rewards and penalties, and will be the goal of the plan decomposition, implementation of the project to the Department of each manager and all the production team. The decomposition and implementation of the safety management target plan can be carried out in the form of a certificate of responsibility for safety production and civilized construction target signed by the company and the project department, the project department and each managerial personnel and production team, and regular assessment and filling in the Record Sheet for Assessment of Safety Production Targets and Responsibilities. Safety management objectives should be archived in the construction site safety management information for inspection.

Chapter V requires the construction unit to do a good job in the project civilized construction and safety of internal data and file management

Strictly in accordance with the construction safety specifications and standards of construction site supervision and management, and check the construction unit truthfully do the following information:

1, the production safety responsibility system (centered on the production safety responsibility system of the production safety, civilized construction of the management of the regulations , methods and safety technical operation regulations for each type of work, etc.).

2, safety target management.

With the form: "safety responsibility target assessment record sheet" (Table & lt; a & gt;).

3, construction organization design (construction program) and special safety construction organization design.

4, safety technology delivery.

With the form: "Safety Technical Submission" (Table & lt; two & gt;)

5, safety inspection.

With the form: "Safety Inspection Record Sheet" (Form & lt; three & gt; -1), "accident hidden danger rectification notice" (Form & lt; three & gt; -2), "accident hidden danger rectification feedback report form" (Form & lt; three & gt; -3)

6, safety education.

With the form: "Safety Education Record Sheet" (Form <IV>-1), "three-level safety education registration card" (Form <IV>-2), "change the type of worker safety education registration form" (Form <IV>-3), "the Construction Site Management Personnel Safety Training Registration Form" (Table <IV>-4)

7, pre-shift safety activities.

With the form: "Shift pre-shift safety activities record sheet" (Table & lt; V & gt;)

8, special operations licensed.

With the form: "special operators roster" (Table & lt; six & gt;)

9, industrial accidents.

With the form: "work-related accidents fast report" (Table & lt; VII & gt; - 1), "work-related accidents monthly report" (Table & lt; VII & gt; - 2)

10, safety signs.

With the form: "construction site safety signage list" (Table & lt; VIII & gt;)

11, various types of equipment, facilities acceptance, testing.

With the form:

Pit support, scaffolding, formwork, holes and edge protection facilities, close-meshed safety net hanging, temporary electricity, material hoists, external elevators, tower cranes, construction equipment, civilized construction and other acceptance form (Table & lt; IX & gt;-1 to Table & lt; IX & gt;)

11, all kinds of equipment, facilities acceptance, testing. -11), grounding resistance, earth leakage protector, insulation resistance and other test record sheet (Table <ten>-1 to Table <ten>-3), "construction site safety protection equipment use registration form" (Table <eleven>).

12, construction site level 3 fire application approval.

With the form: "construction site three-stage fire application approval form" (Table & lt; twelve & gt;).

Construction site safety management information should be categorized according to the above twelve items respectively.

Construction engineering construction site accident, the construction unit shall take emergency measures to reduce casualties and property damage, and immediately to the municipal administrative department of construction and the municipal construction engineering construction safety supervision agency report. The investigation and treatment of construction project construction casualties, in accordance with the relevant provisions of the state, and voluntarily set the development of the project management personnel, technical personnel and special types of operators safety training plan, and is responsible for the organization and implementation. Should regularly do a good job in the construction enterprise employee casualty statistics, analysis and reporting.

Supervisory units should be used to the construction unit, the construction unit of the implementation of the relevant provisions of this measure on a regular basis or from time to time supervision and inspection.

Supervision units, safety supervisors in the supervision and inspection, found responsible units in violation of national construction project construction safety management laws, regulations, rules, technical standards and norms and the provisions of this act, found that there is a hidden safety hazard on the construction site or does not meet the requirements of the provisions of the construction operations, the following administrative measures can be taken; on the non-performance of the duties of the construction safety management of construction projects, the existence of safety hazards on the construction site , the occurrence of construction safety accidents, construction safety management violations, shall be issued respectively "accident hidden danger rectification notice", "suspension or partial suspension of construction rectification notice", "ordered to stop the illegal act notice", and in accordance with the relevant provisions of the implementation of administrative penalties.

When the construction project is completed, the construction unit shall evaluate the construction safety management of the construction project. Supervision unit entrusted by the owner of the construction company safety education and supervision of the implementation of the work system supervision and management.

Construction unit:

Signature of representative: