How is CT-E laid in electricity?

Special for Construction Drawing-Code of Line Laying Method

Wc is hidden in the wall.

L 1, L2, L3, n, PE- three-phase fire line. Zero line Protective wire

BV-4X4+ 1X2.5 insulated copper wire, 4 cores, 4 mm2 plus 1 2.5 mm2.

rated power

Cos=? Usually the power factor.

Is current

C65N-63/3P20A is an open model, which seems to be the rated current of Grade 3 of Schneider.

Fc is used under the floor.

Cc is hidden in the roof or roof,

CE- surface coating along the top plate

Fu Yongming along the wall

Toilet-hidden application along the wall

FC- Hidden application along the ground

CC- hidden application along the roof

CT- laying along the bridge

Common laying methods in collected electrical design and construction drawings:

SR: Laying along steel trunking.

BE: Laying along or across the roof truss.

CLE: placed along or across a column.

We: Lying along the wall.

CE: laying along the ceiling surface or ceiling surface.

ACE: It is laid on the ceiling where people can enter.

BC: Buried in the beam.

CLC: Buried in a column.

WC: Buried in the wall.

Cc: Buried in the ceiling.

ACC: Buried in an inaccessible ceiling.

FC: Buried underground.

SCE: When laying in the ceiling, metal pipes should be worn.

First, the wire goes through the pipe and says

Super capacitor welded steel pipe

MT- catheter

PC-PVC plastic rigid pipe

FPC flame retardant plastic rigid pipe

Current transformer bridge

MR- metal trunking

Mobile cable

CP- metal hose

Plastic trunking

Reinforced concrete galvanized steel pipe

Second, the expression of conductor laying mode

Direct burial

TC- cable trench

BC- hidden in the light beam

CLC- hidden in the column

WC- hidden in the wall

CE- laying along the ceiling

CC- hidden in the ceiling

SCE- Laying in suspended ceiling

F- under the floor and terrace

SR- along the cable

BE- along the roof truss and beam

Fu Yongming along the wall

Third, the installation method of lamps and lanterns

CS- chain crane

DS- pipeline crane

W-wall installation

C-ceiling

R- embedding

S-bracket

CL- on chromatographic column

Along the groove of steel: SR

Along or through the roof truss: Yes.

Along or through the cylinder: CLE

Laying through welded steel pipe: SC

Catheter laying: MT

Hard plastic pipe laying: PC

Laying through flame retardant semi-rigid PVC pipe: FPC

Cable trough laying: CT

Metal trough laying: MR

Plastic trunking laying: PR

Cable laying: m

PVC laying in plastic corrugated pipe: KPC

Laying through metal hose: CP

Direct burial: DB

Cable trench laying: TC

Marking of conductor laying parts

Laying along or across beams (roof truss): AB

Hidden in the light beam: BC

Laying along or across columns: AC

Buried in a column: CLC

Laying along the wall: WS

Buried in the wall: WC

Laying along the ceiling or roof: ce

Buried on the roof or roof: CC

Ceiling laying: SCE

Ground or underground laying: FC

HSM8-63C/3P

DTQ30-32/2P should be two types of molded case circuit breakers.

HSM8-63C/3P is suitable for lighting circuit, and it is a three-pole switch with rated current of 63A (three-way switch).

DTQ30-32/2P is also a plastic case circuit breaker with rated current of 32A, with two-pole switch.

Line laying mode code

PVC- flame retardant plastic pipe laying

DGL- Electrical Steel Pipe Laying

Vxg- laying with plastic trunking

GXG- laying with metal trunking

Krg- laying with flexible plastic pipe

⑦ Code of exposed part of line

LM —— Laying along the roof truss or the lower chord of the roof truss.

Zm-lying along the pillar

QM- Laying along the wall

PL-Laying along the ceiling

(3) The code of the concealed part of the line.

La- hidden in the light beam

ZA- hidden in the column

QA- Hidden in the Wall

Pa- hidden in the roof or ceiling.

Da- hiding in the ground or on the floor.

PNA-hidden in the unreachable ceiling.

(4) Lighting installation specification

D-ceiling

L chain suspension type

G tube suspension type

B- wall-mounted

R- embedded

Br-installed on the wall

(4) Equipment labeling method

⑦ Marking method of distribution lines

A-b (c× d) e-f where: a-number of loops.

B conductor model

C- number of wires

D conductor section

E- laying method and pipe diameter

F- laying parts

Represents two lines.

Represents three lines.

Represents n wires

⑦ Marking method of lighting lamp

General marking method:

Marking method for ceiling installation of lamps and lanterns:

Where: number of lamps

Type b or number

C- number of bulbs per lighting device.

D- bulb capacity, w

Installation height of electronic bulb, m

F- installation method

L light source, incandescent lamp or fluorescent lamp

Line laying mode code

PVC- flame retardant plastic pipe laying

DGL- Electrical Steel Pipe Laying

Vxg- laying with plastic trunking

GXG- laying with metal trunking

Krg- laying with flexible plastic pipe

⑦ Code of exposed part of line

LM —— Laying along the roof truss or the lower chord of the roof truss.

Zm-lying along the pillar

QM- Laying along the wall

PL-Laying along the ceiling

(3) The code of the concealed part of the line.

La- hidden in the light beam

ZA- hidden in the column

QA- Hidden in the Wall

Pa- hidden in the roof or ceiling.

Da- hiding in the ground or on the floor.

PNA-hidden in the unreachable ceiling.

(4) Lighting installation specification

D-ceiling

L chain suspension type

G tube suspension type

B- wall-mounted

R- embedded

Br-installed on the wall

(4) Equipment labeling method

⑦ Marking method of distribution lines

A-b (c× d) e-f where: a-number of loops.

B conductor model

C- number of wires

D conductor section

E- laying method and pipe diameter

F- laying parts

Represents two lines.

Represents three lines.

Represents n wires

⑦ Marking method of lighting lamp

General marking method:

Marking method for ceiling installation of lamps and lanterns:

Where: number of lamps

Type b or number

C- number of bulbs per lighting device.

D- bulb capacity, w

Installation height of electronic bulb, m

F- installation method

L light source, incandescent lamp or fluorescent lamp