How to write the equipment acceptance

Question 1: How should I write the equipment acceptance report? First of all, the purpose of acceptance, principles, and then the composition of the acceptance team, and then acceptance criteria, and finally can be summarized

Question 2: How to write the acceptance report of machinery and equipment equipment acceptance record

Xxxxxx unit XX XX year

First, the appearance of the inspection

1. The equipment and the outer packaging of the photographic records to check whether the equipment Whether the outer packaging is intact, there is no damage, soaking, moisture, deformation, etc., the surface of the outer box and the state of encapsulation;

2. Check the surface of the equipment and accessories for damage, rust, bruises, etc., focusing on the inspection of the rotor impeller with or without damage, the main components and the main working surfaces;

3. If you find that there is damage to the packaging, the equipment and accessories have damage, rust, If you find that the packaging is damaged, equipment and accessories have damage, corrosion, signs of use, etc., you should make a detailed record, and focus on taking pictures and retaining evidence, and timely return to the supplier for replacement, claim procedures.

Second, the number of inspections

1. Quantity inspection should be based on the supply contract and packing list, check the host, accessories and other equipment specifications, models, configurations and quantities, and piece by piece inventory check;

2. Carefully check the random information is complete, such as manuals, certificates of conformity of the product inspection, warranty, etc.;

3. Serial number and factory number, if necessary, you can check online;

4. Carefully make a good record of unpacking and counting, write down the location, time, participants, box number, product name, should be to the actual number of real, such as found in shortages, misdirection and other issues, we must promptly make a record and retain the relevant materials.

Third, fill in the acceptance record table

1. Box acceptance is over, found that any one does not meet the requirements of the contract documents, must be recognized by the supplier's representative (signature, seal).

2. Write the equipment opening inspection record sheet, serial number and factory number, field photos as part of the equipment acceptance documents.

Equipment unpacking and acceptance record sheet

No.:

Question 3: How to write the acceptance opinion of the laboratory instrument and equipment acceptance personnel acceptance Instrument and equipment management Equipment, as an important element of resources, should be included in the quality management system, participate in the operation of the system in order to achieve the quality policy and objectives. Therefore, should be established in line with the guidelines for equipment management system, the implementation of comprehensive quality management, so that the instrumentation and equipment to maintain a good working condition, to meet the needs of the testing work.  Establishment of equipment quality management system (1) Establishment of equipment management organization Equipment management organization consists of quality management department, technical department and support service department. According to the characteristics, scope and workload of the equipment management work, determine the duties, powers and mutual relations of the management personnel, verifiers, operators and service personnel, so that the management functions are decomposed and implemented to the relevant departments and positions, and try to make the duties clear and the division of labor clear.  (2) Develop equipment management procedures Equipment management procedures are the way for testing organizations to implement equipment management. Through the establishment of the corresponding program documents, clear process of equipment management activities, steps, content and all the links, so that all the work can be followed.  (3) the preparation of equipment operating instructions equipment operating instructions is to guide the test personnel to operate the equipment specification documents. General equipment can be operated in accordance with the instructions, large, complex instruments or operators of large mobility, unstable performance of the equipment need to prepare operating instructions or operating procedures.  Sound equipment quality management system (1) evaluation system Evaluation is a preliminary work to add or dispose of equipment, mainly from the adaptability of the equipment, reliability, economy, safety, maintenance and other aspects of a comprehensive analysis, the purpose is to rationalize the allocation of equipment resources, equipment to play the best benefits. For large, valuable, sophisticated instruments need to be certified for feasibility, to achieve technically advanced, reliable performance, work needs, economic rationality; for rental, maintenance, elimination of equipment, as well as small or auxiliary equipment, the necessary review should be carried out.  (2) Acceptance system Acceptance is an important means to ensure the normal operation of additional or repaired equipment. The unpacking and unsealing of instruments and equipment should be carried out in the presence of equipment managers, operators, supply staff and other relevant personnel. During the acceptance process, the equipment evaluation requirements, ordering contracts and packing lists should be counted one by one and records should be made. For large-scale, precision instruments and equipment, after installation and commissioning, should also be through a certain period (within the contract period) of trial operation, according to the actual operating results and indicators of the test conclusions, to confirm that there is no quality problems before acceptance. Instruments and equipment can only be accepted for handover procedures, delivery and use.  (3) the use of the system in order to extend the service life of the equipment, give full play to its role, we must establish a system for the use of equipment, personnel, working environment, facilities conditions, maintenance, repair and other clear requirements to make provisions.  (4) record system records is to establish a complete file of equipment to ensure that the normal operation of the equipment sales of a basic job, the implementation of the responsibility for equipment management, the implementation of the system and the operation and improvement of the management program are very important. Each piece of equipment from the plan to purchase to eliminate should maintain a complete record of the content in addition to the general equipment files, should also be the acquisition of equipment, verification, maintenance plans, demonstration or report, commissioning and acceptance report, equipment use and calibration records, instrument failure and maintenance records, operating conditions, performance changes, anomalies and corrective action, and so on.  (5) Verification system Verification is an important initiative to confirm that the equipment complies with the technical specifications and to avoid influencing the test results. Before and after the use of the instrument, the operator should take self-calibration, comparison and other methods to calibrate the main performance parameters in accordance with the technical specifications and instructions to ensure that the accuracy and range of the instrument meet the requirements. The quality management team shall regularly check the use and records of the equipment, etc. Verification procedures shall be formulated for newly purchased or leased equipment, equipment used for on-site testing, and equipment with frequent use or large drift, so as to keep the equipment in good working condition.  Calibration and Verification of Instruments and Equipment Calibration (1) Definition of Calibration Calibration is a set of operations to determine, under specified conditions, the relationship between the quantitative values indicated by a measuring device or a measuring system, or the quantitative values represented by a physical gauge or a reference substance, and the corresponding quantitative values reproduced by a standard.  The meaning of this definition is: ① To assign a value to the characteristics of a measuring instrument, including a reference material, under specified conditions, using a reference standard, and to determine the error in its indication.  ② To trace the quantity value indicated or represented by a measuring instrument, according to the calibration chain, to the quantity value reproduced by the standard (2) Purpose of calibration ① To determine the error of the indication value and to be able to determine whether it is within the expected tolerance; ② To derive a reported value for the deviation from the nominal value, ...... >>

Question 4: *** Procurement of machinery and equipment acceptance opinion how to write *** Procurement of machinery and equipment acceptance is generally from the equipment to meet the technical specifications, whether the equipment is running well, whether the manufacturer to the use of the department of training, whether the equipment acceptance information is complete, in short, can turnkey project is best. Like Shaanxi Shiyu non-standard testing machine industry is basically this form, equipment acceptance is complete, the competent leader can sign

Question 5: How to write a machine acceptance report ah Mechanical Industrial Quality Management Requirements Acceptance Report

Name of the enterprise:

Product name:

Type of product:

Year Month Day

The basic quality management work

The basic quality management work

No. Inspection Items Inspection Content Inspection Records

1

1.1

1.2 Quality Policy

The formulation of quality policy a) The factory quality policy should be formulated on the basis of adequate and in accordance with the prescribed procedures, and can reflect the quality policy of the factory, quantitative goals and measures. b) The quality policy of the factory should be formulated on the basis of the quality policy of the factory, and can reflect the quality policy of the factory, quantitative goals and measures. c) The quality policy of the factory is based on the quality policy of the factory.

b) The quality policy should be developed according to the objectives and measures corresponding to the development of the full coordination of various departments and the corresponding implementation of the implementation of the department responsible for the department and the person in charge.

Implementation and management of the quality policy a) The factory should set up a regular inspection and diagnosis system of the quality system and implement it seriously,

b) There are quality system management review, evaluation and improvement measures.

2

2.1 Organization

Quality management organization system a) The factory should have a representative of the quality management personnel.

b) The factory should establish a three-level quality management network at the factory level, workshop (section) and shift. And can provide quality management organization system block diagram. Its responsibilities and powers, interrelationships should have a clear link, focusing on the actual operation.

c) The factory should be led by the factory director or authorized quality management representative of the quality inspection agency, and is equipped with enough full-time staff to do the job.

2.2 There should be a clear quality function inspection program a) According to the requirements of the quality function to formulate the quality of each department and department head's quality responsibilities

b) Quality-related departments should have a clear documented basis for the work procedures and implement them seriously.

c) Quality accountability should have assessment methods.

3

3. 1

Product development and design and product quality improvement

Product development and design a) Product development and design should have a complete, scientific work procedures.

b) Development and design of each stage of the program should have a clear quality assurance content.

c) The product being examined should be quality characteristics of the importance of grading table. (Can be marked on the drawings, process documents)

No. Inspection Items Inspection Content Inspection Records

3.2

Product Quality Improvement a) There should be a product quality improvement plan and implementation of the summary.

b) There should be a product quality improvement program management system.

4

4.1 Production Technology Preparation and Manufacturing

Product Standards and Internal Control Quality Indicators The factory must implement the product standards recognized by the production license. Superior and first-class products shall implement internal control quality indicators higher than the current standards.

4.2 Management of equipment and tools and testing apparatus a) The management system of equipment and tools and testing equipment (apparatus) shall be formulated. b) The management system of equipment and tools shall be formulated in accordance with the following principles Affect the product A, B class characteristics should be strict, C class relaxation. Play a role in the inspection of A, B type of equipment and fixtures should be made weekly inspection.

b) Random sampling of equipment, equipment, equipment (apparatus) should be measured each of the three, check the acceptance rules, operating procedures. (Including homemade equipment)

c) Check the plant equipment and tooling intact rate, check the preliminary data and statistics. (Superior product intact rate of 90%, first-class, qualified product intact rate of 80%)

d) "Quality control points on the equipment, tooling and testing instruments should have a daily point inspection system, and according to the requirements of the control point to establish point inspection card.

e) According to the requirements of the management system, random sampling of equipment, tooling and testing equipment, each of three, check the implementation.

4.3 Measurement management a) The factory should be based on the size, the establishment of measurement management department (room) or measurement management personnel.

b) responsible for measuring the value of the transfer and testing personnel should have a higher level of measurement issued by the department and the work of the appropriate certificate.

c) There is a measurement management system, and in accordance with the provisions of the periodic calibration. (Including homemade, specialized measuring instruments precision, accuracy.)

d) Any three self-made measuring instruments, should provide complete information.

No.

Inspection Items Inspection Content Inspection Records

4.4

4.5

4.6

Process Discipline and Management

Management of Quality Control Points

Positioning Apparatus

f) Arbitrarily draw 10 pieces of measuring instruments, check the system to carry out.

g) Measurement room environment and health conditions in line with the provisions of the measurement department.

a) There should be a complete process discipline and system.

b) There should be process discipline assessment methods.

c) Any draw three months of statistical tables, check the operating workers, teams and workshops of the process implementation rate statistics.

d) Check the enterprise to implement process discipline and management system, process discipline assessment methods

...... >>

Question 6: how to write the acceptance report Acceptance Report Format

1, the basis of construction

Briefly explain the project feasibility study report approval or plan task book and approval of the unit and the approval number, the approval of the construction investment and project budget estimates (including the revised budget estimates), the scale of the construction of the required production capacity and production capacity, construction of the project of the package deal the main The main content of the contractual agreement of the construction project.

2, project overview

(1) the preliminary work and implementation of the project;

(2) design, construction, general contracting, construction supervision, equipment suppliers, quality supervision agencies and other units;

(3) the individual. On behalf of, write, the start and completion date of the project;

(4) the completion of the workload and electrification: the youngest three two. Two order five three, five zero zero six formed production capacity (detailed description of the reasons for the construction period in advance or delayed and production capacity and the original plan of the reasons for the discrepancy between the original plan, as well as the construction of the countermeasures taken to ensure the implementation of the original plan).

3, the initial inspection and test run

The initial inspection time and the main conclusions of the initial inspection and test run (should be accompanied by the initial inspection report and test run of the main test indexes, test run time is generally 3-6 months).

4, the completion of the final account overview

Estimates (revised estimates), budget execution and preliminary final accounts, and investment analysis of communications construction projects.

5, the organization of engineering and technical files

The construction of the project in the major records, the completion of the project data, hidden works with the acceptance of the data, design documents and drawings, supervision of the documents, the main equipment, technical data and engineering construction of documents, such as the organization of the archives.

6, economic and technical analysis

(1) the main technical indicators of test values and conclusions;

(2) the analysis of project quality, the quality of construction accidents occurring in the treatment of the situation after the description;

(3) the analysis of the construction cost and the main economic indicators, as well as the use of new technologies, new equipment, new materials, new technologies to obtain the benefits of investment;

(4) analysis of investment benefits, the formation of fixed assets as a proportion of investment, direct corporate income, analysis of the years of return on investment, break-even analysis.

7, the situation of preparation for commissioning

The organizational structure of the operation and management department, the production staffing situation. Training and the establishment of the operation of the rules and regulations of the situation.

8, the treatment of finishing works.

9, the preliminary views of the project put into operation.

10, engineering construction experience, lessons learned and suggestions for future work.

Question 7: how to write the conclusion of the completion inspection After inspection, in line with the design requirements and acceptance criteria, agreed to a acceptance

Question 8: how to write the acceptance report, completion acceptance report is responsible for filling in by the construction unit. 2, the completion of the acceptance report in four copies, all written in pen, handwriting should be clear and neat. Construction units, construction units, urban construction records department, the administrative department in charge of construction each store a copy. 3, the content of the report must be true and reliable, if found false, not for the record. 4, the report shall be signed by the construction, design, construction, engineering supervision unit legal representative or his proxy, and stamped with the official seal of the unit to be valid. 5. The report on acceptance of project completion shall be accompanied by the following copies: (1) construction permit; (2) engineering survey results and approval certificate for review of construction plan design documents; (3) engineering completion report of the construction unit; engineering quality assessment report of the supervisory unit; and quality inspection report of the survey and design unit; (4) approval documents or permitted-use documents issued by the departments of planning, public security, fire-fighting and environmental protection, etc.; (5) (5) Project quality warranty signed by the construction unit. Completed project review Table 1 Project name Project address Construction unit Structural form Survey unit Number of storeys Number of buildings Design unit Scale of project Supervision unit Date of commencement Date of commencement Construction unit Date of completion Date of completion Construction license No. Total cost Review items and contents Review situation I. Completed design items Foundation, main body, indoor and outdoor decoration works, waterproofing works Water supply and drainage works, gas works, fire-fighting works Building electrical Installation Ventilation and air-conditioning Elevator and escalator installation Outdoor works II. Completion of contractual agreements General contract agreements Sub-contracting contract agreements Specialized contract agreements III. Technical files and construction management data Pre-construction, construction plan design document review and other technical files Supervision technical files and management data Construction technical files and management data Continued from Table 1 IV. Main use function inspection report of equipment V. Quality evaluation documents Survey unit quality inspection report Design unit quality inspection report Construction unit completion report Supervision unit quality assessment report VI. Project quality repair book General and subcontracting unit Specialized contracting unit Conclusion of the review: Head of engineering of the construction unit: Monthly 20 Completion acceptance organization Implementation situation I. Acceptance organization (a) Leadership

Issue 9 : how to write the acceptance report engineering completion acceptance work by the construction unit (that is, your unit) organization; "Engineering Completion Acceptance Report" by the contractor to prepare and submit to the supervisory unit of the quality of the project for completion of the pre-acceptance, found that after the problem of the supervisory unit will require the contractor to rectify the rectification in a timely manner, rectification is completed by the superintendent engineer to sign the completion of the project report form, on the basis of the quality of the project assessment report, the superintendent engineer and supervisory unit of technology to assess the quality of the project, the project is completed. Chief Superintendent Engineer and Supervision Unit technical responsible person to review and sign before they can take effect.

Question 10: just purchased machinery and equipment, need to write acceptance report, how to write? Give a suggestion Acceptance report of the necessary conditions for quality management of machinery industry enterprises

Name of the enterprise:

Product name:

Product type:

Month of the year

First, the quality management of the basic work

Serial number Inspection items Inspection content Inspection records

1

1.1

1.2 Quality policy

The formulation of quality policy a) The formulation of quality policy should be based on sufficient grounds and in accordance with the prescribed procedures, and can reflect the quality policy of the factory, with quantitative objectives and measures.

b) The quality policy should be developed according to the objectives and measures corresponding to the development of the full coordination of various departments and the corresponding implementation of the implementation of the department responsible for the department and the person in charge.

Implementation and management of the quality policy a) The factory should set up a regular inspection and diagnosis system of the quality system and implement it seriously,

b) There are quality system management review, evaluation and improvement measures.

2

2.1 Organization

Quality management organization system a) The factory should have a representative of the quality management personnel.

b) The factory should establish a three-level quality management network at the factory level, workshop (section) and shift. And can provide quality management organization system block diagram. Its responsibilities and powers, interrelationships should have a clear link, focusing on the actual operation.

c) The factory should be led by the factory director or authorized quality management representative of the quality inspection agency, and is equipped with enough full-time staff to do the job.

2.2 There should be a clear quality function inspection program a) According to the requirements of the quality function to formulate the quality of each department and department head's quality responsibilities

b) Quality-related departments should have a clear documented basis for the work procedures and implement them seriously.

c) Quality accountability should have assessment methods.

3

3. 1

Product development and design and product quality improvement

Product development and design a) Product development and design should have a complete, scientific work procedures.

b) Development and design of each stage of the program should have a clear quality assurance content.

c) The product being examined should be quality characteristics of the importance of grading table. (Can be marked on the drawings, process documents)

No. Inspection Items Inspection Content Inspection Records

3.2

Product Quality Improvement a) There should be a product quality improvement plan and implementation of the summary.

b) There should be product quality improvement program management system.

4

4.1 Production Technology Preparation and Manufacturing

Product Standards and Internal Control Quality Indicators The factory must implement the product standards recognized by the production license. Superior and first-class products shall implement internal control quality indicators higher than the current standards.

4.2 Management of equipment and tools and testing apparatus a) The management system of equipment and tools and testing equipment (apparatus) shall be formulated. b) The management system of equipment and tools shall be formulated in accordance with the following principles Affect the product A, B class characteristics should be strict, C class relaxation. Play a role in the inspection of A, B type of equipment and fixtures should be made weekly inspection.

b) Random sampling of equipment, equipment, equipment (apparatus) should be measured each of the three, check the acceptance rules, operating procedures. (Including homemade equipment)

c) Check the plant equipment and tooling intact rate, check the preliminary data and statistics. (Superior product intact rate of 90%, first-class, qualified product intact rate of 80%)

d) "Quality control points on the equipment, tooling and testing instruments should have a daily point inspection system, and according to the requirements of the control point to establish point inspection card.

e) According to the requirements of the management system, random sampling of equipment, tooling and testing equipment, each of three, check the implementation.

4.3 Measurement management a) The factory should be based on the size, the establishment of measurement management department (room) or measurement management personnel.

b) responsible for measuring the value of transmission and testing personnel should have the superior measurement of the famine issued by the department and the work of the appropriate certificate.

c) There is a measurement management system, and in accordance with the provisions of the periodic calibration. (Including homemade, specialized measuring instruments precision, accuracy.)

d) Any three self-made measuring instruments, should provide complete information.

... >>