Grade d-yellow and black twill zebra crossing (inclined 45? ) dangerous goods area line, warning area line, fire evacuation line; Positioning line, Class A-equipment positioning: all equipment and workbench are positioned with yellow four-corner positioning lines, and the empty space of the four-corner positioning lines of the workbench is marked with the words "XX workbench/equipment".
Class B-Defective areas (waste recycling bins, boxes and defective product shelves) are marked with red lines. If the positioning range is less than 40cm×40cm, directly use the closed solid wireframe for positioning.
Extended data:
Workshop layout should be determined according to the production outline and division of labor table, production technology, process route, production organization form, types, models and quantities of mechanical equipment and lifting and transportation equipment. A good workshop layout should minimize the transportation distance, so that the materials will flow through each station in turn after entering the workshop, and then flow out of the workshop.
The layout of production workshop refers to the overall arrangement of basic workshop, auxiliary workshop, production service department, facilities, equipment, warehouse, passage and other mutual positions. In space and on the plane. Workshop layout aims to make the most effective use of workshop space, on the one hand, it is convenient for work and operation, and avoids the overcrowding of production equipment; On the other hand, pay attention to the ventilation, fire prevention and explosion prevention of the factory building to ensure safe production. Its specific contents include:
1, longitudinal span, span, high span and open-air span construction area layout;
2. Arrangement of workshop space stratification;
3. Layout in multi-storey buildings.
Workshop layout should be determined according to the production outline and division of labor table, production technology, process route, production organization form, types, models and quantities of mechanical equipment and lifting and transportation equipment. A good workshop layout should minimize the transportation distance, so that the materials will flow through each station in turn after entering the workshop, and then flow out of the workshop.