Xinyang City is located in the south of Henan Province, is located in the upper reaches of the Huai River, the northern foot of the Dabie Mountains, is an important channel for economic and cultural exchanges between the north and the south, known as the "Pearl of South Henan", "three provinces thoroughfare". The city has a total area of 18,915 square kilometers, with 8 counties, 2 districts and 6 administrative districts under its jurisdiction and a population of 8.03 million. Xinyang is located in the transition zone from subtropical to warm-temperate zone, on the north-south demarcation line of China's geography, the city's forest coverage rate of 32%, more than 10 percentage points higher than the national average. Xinyang seasonal climate is obvious, and both the mountain climate characteristics, abundant light, abundant rainfall, warm and humid climate to meet the needs of a variety of plant cultivation and growth, and thus rich in agricultural and sideline products, the famous local agricultural products Xinyang Maojian tea is one of the top ten famous tea. Xinyang is rich in tourism and mineral resources, with overlapping mountains and low hills, open plains and basins surrounded by mountains. There are many revolutionary sites, monuments and cultural relics in the city. The city has 6 national cultural relics protection units, more than 400 provincial and sub-provincial cultural relics protection units, and more than 400 important revolutionary memorial sites and old revolutionary sites.
Dong Yuancheng, member of the party group, researcher (presiding)
Hu Min, deputy secretary of the party group (female)
Cao Xiaolin, member of the party group, deputy director
Li Jiguang, member of the party group, deputy director
Xiong Wei, member of the party group, deputy director
Yang Fushan, member of the party group, head of the disciplinary group
Yu Haizhong, member of the party group, Chief Engineer
Dong Yuancheng Brief introduction: Han nationality, Chinese *** party members, full-time college education. 1977 July to work, 1982 ~ 2001, successively served as the former xinyang area industrial bureau of the personnel section deputy director of the former xinyang area economic and trade commission political department, deputy director, director, vice mayor of the people's government of xi xian, xinyang school of agricultural mechanization, xinyang area director of the bureau of geology and minerals; December 2001 ~ June 2008, the director of the bureau of geology and minerals. December 2001 ~ 2008 June, as Xinyang City Bureau of Land and Resources, party group members, deputy director; June 2008, as Xinyang City Bureau of Land and Resources, party group members, researcher; November 20, 2008 onwards to preside over the overall work of the Bureau.
Organization set up the bureau set up office, personnel, finance, cadastre, planning, land, cultivation and protection of the section, mining management, geology, the use of the section, surveying and mapping section, regulations, the party committee, discipline inspection and supervision office, the Office of letters and visits, the veterans of the section of the 16 sections. Set up land reserve center, land law enforcement and supervision detachment, land resources trading center, land development and finishing center, land planning and surveying team, land value assessment of six directly under the institutions. Set Shihe a branch, Shihe two branches, Pingqiao Branch, Minggang Branch, Yangshan Branch, South Bay Branch, Industrial City Branch, Jigongshan Branch 8 Branch.
Land resources as of December 31, 2010, the city's total land area of 189,156.35 hectares. Among them, 838563.47 hectares of arable land; 67,345.14 hectares of garden land; 43,714.58 hectares of forest land; 58,775.36 hectares of grassland; 215540.01 hectares of land for towns, villages, industry and mines; 39,476.62 hectares of land for transportation; 219,142.92 hectares of land for watersheds and water conservancy facilities; and 21,003.25 hectares of other land.
Cultivated land protection: In 2010, the city strictly implemented the cultivated land occupation-supplementation balance, and in accordance with the principles of "replenish first before occupying" and "occupying one to compensate for another", established "three banks", i.e., the cultivated land reserve resource bank, the cultivated land occupation-supplementation balance bank, the cultivated land reserve resource bank, the cultivated land reserve bank and the cultivated land reserve bank. In 2010, 11 batches of supplementary arable land reserves were accepted, 793.09 hectares of supplementary arable land were put into the reserves, 808.3222 hectares of arable land were declared to be occupied for construction, and 808.3222 hectares of supplementary arable land reserves were utilized, so that arable land retention remained stable at 792,900 hectares, and arable land occupation and replenishment balance was achieved. The balance of arable land has been realized.
Signing the target management responsibility letter of arable land protection at each level, carrying out the target assessment of arable land protection, implementing the rectification work of the 2008 target assessment of arable land protection, and welcoming the Henan Provincial Government's inspection of the fulfillment of the 2009 target of arable land protection in Xinyang City. Strictly implement the basic farmland replenishment system to ensure that the city's basic farmland will not be reduced, the quality of the basic farmland will not be reduced, and the area of basic farmland protection will be stabilized at 686,400 hectares. Luoshan County, under the jurisdiction of the city, has been jointly recognized by the Ministry of Land and Resources and the Ministry of Agriculture as an "advanced unit in the protection of basic farmland nationwide".
Land resources planning and management in 2010, Xinyang City, township-level planning revision was successfully completed, in accordance with the principle of full coverage of the planning land, this round of planning revision Xinyang City **** need to approve 199 township-level planning, including 64 townships, 111 townships, 11 offices, 5 management areas, and other 8. The city's 199 township-level land-use master plans were approved and adopted by the municipal government in May 2011 and implemented.
Urban and rural construction land increase/decrease linkage in 2010, the organization prepared 16 batches of "2010 urban and rural construction land increase/decrease linkage project area implementation planning",*** planning to build new areas of 95 projects, with a total land scale of 742.407 hectares.
By the end of 2010, the city's 16 batches of implementation planning for the increase/decrease linkage project area has been approved by the provincial department of 8 batches, with an area of 297.5577 hectares, and an increase of 272.7264 hectares in new arable land. The area is 297.5577 hectares, and the new cultivated land is 272.7264 hectares. The new areas set up by the implementation plan of the urban and rural construction land increase and reduction linkage project area have all been implemented into specific projects and incorporated into the new round of township land use overall planning, and the new projects are in line with the national industrial policy and construction land control indexes. The indicators of "Rural Collective Construction Land Improvement" used in the old demolition areas have been filed in accordance with the requirements, and the old demolition areas that were built before demolition and those that have been demolished and are awaiting acceptance have been implemented into specific plots, all of which are rural construction land. The setup of the old demolition area is reasonable, the resettlement program is feasible, and the total scale of the old demolition area and the increase in the area of cultivated land are larger than the scale of the new construction area.
Land use management to strengthen the dynamic monitoring of the land market, from January 1, 2010 onwards in the backbone of the full operation of the land market dynamics of the monitoring and supervision system, fully realized from the source of the land to the land supply and market transactions and other processes of dynamic tracking supervision. Continuing to carry out the work of approving and checking the approval and post-approval verification of land granted but not yet used and construction land, the city has effectively promoted the speed of land acquisition and supply, cleaning up and rectifying 146.02 hectares of "land granted but not yet used", completing the acquisition and handover of 91.11 hectares, and completing the supply of 36.54 hectares of land. It actively and conscientiously carried out special rectification of real estate land, and disposed of idle real estate land according to the requirements of the provincial department.
In 2010, the city***supplied all kinds of construction land area of 459.86 hectares, of which 429.5696 hectares were supplied by way of land grant, and the land transaction price was 3.27258 billion yuan. Of the land offered for sale, 394.5797 hectares were supplied by "auction and listing", accounting for 86% of the total area offered for sale, and the price of the land sold was 3.2016 billion yuan, accounting for 98% of the total turnover. At the same time, the city **** counted 34.9899 hectares of land allocated to make up for the transfer formalities, and paid 0.7098 billion yuan in premiums.
Cadastral ManagementIn 2010, the second land survey was completed. Xinyang City Bureau of Land and Resources made full use of the results of the survey to further expand the coverage of rural collective land registration and issuance of certificates, completing the registration of ownership of 3,429 rural collective land, with the registration rate reaching over 95%. Collective land use certificates for construction were issued in 1,294,000 cases, with the rate of issuance reaching 85.01 per cent. The land registration window office continues to implement the "first-question-responsibility", "one-stop" acceptance of documents at the window, and "one-stop" service. Municipal **** through the window acceptance of applications for the issuance of state-owned land registration report 495 cases, including approval of state-owned land use certificates 392 cases (390 cases have been completed, 2 cases returned). Fifty-three urban housing land division registrations were accepted and approved, and 2,566 urban housing land division land use certificates were issued. 50 land mortgage registrations were accepted and approved, involving a land mortgage area of 535.74 hectares and a mortgage amount of 233,545,000 yuan.
Construction Land Management In 2010, the government carried out the "Double Guarantee Project" to provide resources for stabilizing growth, changing mode and adjusting structure. Do a good job of construction land approval work, highlighting a "fast" word, proactive services, fast distribution, fast volume, fast approval. As of the end of 2010, approved by the provincial government batch construction land 6, an area of 188.3068 hectares, reported to the provincial department for review of the batch construction land 49, an area of 1,400.7934 hectares, the above *** counted 1,589.1002 hectares. Reported for approval by the municipal government of agricultural land reuse no longer expropriation project 9, an area of 99.0666 hectares. To serve the national key construction projects, we have actively organized the declaration of construction land for the Lanzhou-Zhengzhou-Changsha oil pipeline project, West-East gas pipeline Huaiwu branch pipeline project and other national key construction projects. At the same time, we also carried out the land requisition and approval work for the electrification of Beijing-Kowloon Railway, HuaiXi Expressway and HuaiGu Expressway, and the first land requisition and approval work for the key projects in 2010 has been organized and reported to the Ministry of Land and Resources, the official land requisition and application materials have been organized and reported to the Provincial Department of Land and Resources, and the land requisition and approval work for the "four electric" land requisition and approval work for the ShiWu Railway has also been fully launched. The work has also been fully launched.
Rural land remediation in 2010, Xinyang City, rural land comprehensive remediation work has taken a new step. Xinyang City Government issued the "Xinyang City People's Government on the issuance of Xinyang City, land reclamation and consolidation and new rural construction project management of the implementation of the views of the notice" (Xinzhengwen [2010] No. 211). Xinyang City, comprehensive land remediation work in practice to find out a new way, has accumulated new experience. In the rectification process to take a "point to lead the face, pilot first, highlights out of the effect" approach, select the appropriate project area for centralized and continuous finishing, in strict implementation of the control targets issued by the higher levels of the premise, combined with the overall land use planning and construction of a typical demonstration area, so as to promote the city's land comprehensive rectification work carried out smoothly. Developed a land reclamation development project "monthly report system", "notification system", "work exchange system" and "supervision system ". The technical evaluation of various types of land reclamation and development projects has been carried out in a comprehensive manner, and the historical legacy of the projects has been resolved. Based on the principle of respecting history and focusing on reality, the procedures of some projects before 2010 as well as the internal information were improved, and on this basis, the technical evaluation work in 2010 was fully completed.**** In 2010, the feasibility study reports of 54 projects were validated. The design reports of 52 projects were evaluated, including 6 projects with new fees in 2007 and 2008, 17 projects with new fees in 2010, and 29 projects that accounted for the balance of payments. The technical evaluation of changes in the design reports of two projects was completed, and the bidding programs and bidding documents of 16 projects were reviewed.
Surveying and mapping supervision in 2010, consolidate the rectification and standardization of geographic information market order results, the introduction of the interview mechanism to strengthen the city's surveying and mapping unified supervision. Through the discovery of mapping violations of the first signs of investigation and verification and interviews, the licensed surveying and mapping units to remind and early warning of violations, clear costs and consequences of violations, to avoid direct access to the legal penalty process, in order to promote the healthy and orderly development of the city's surveying and mapping industry. In 2010, we did a good job in mapping management and service guarantee, strengthened the promotion and application of mapping standards, mapping task filing and results management, and review and renewal of mapping qualifications. The city's county-level D GPS three-dimensional geodetic control network was completed and passed the quality inspection and acceptance of the Provincial Surveying and Mapping Product Quality Supervision Station. Substantial progress has been made in the construction of "Digital Xinyang" and "Digital County", and Xinyang City was included in the 2010 National Digital City Geospatial Framework Construction Program.
Mineral resources in Xinyang City, the geotectonic position in the North China Plateau and the Qinling orogenic belt combined. In the north is the southern edge of the North China Plateau, and in the south is the Tongbai-Dabie orogenic belt, which is the eastern extension of the Qinling orogenic belt. Two major geological units in the long-term geological history of the period, creating favorable geological conditions for mineralization, the formation of rich mineral resources, is one of the important mineralization zone in Henan Province. The city has discovered 51 kinds of minerals: 3 kinds of energy minerals, 17 kinds of metal minerals and 31 kinds of non-metal minerals. Found large, medium and small solid mineral deposits 161, of which 16 large deposits, 24 medium-sized deposits, 121 small deposits; geothermal water 1. A large number of ore points, mineralization points and physical and chemical exploration anomalies have also been found in the area. The advantageous minerals in Xinyang City are mainly molybdenum and non-metallic minerals of building materials. In recent years, the newly discovered and proved Tangjiaping molybdenum mine and Qiangechong molybdenum mine, the reserve scale reaches the large-scale and extra-large deposits scale. Building materials non-metallic minerals are mainly perlite, bentonite, zeolite, cement marble (limestone), dolomite, building stone and construction sand. Xinyang City, the main minerals, perlite, bentonite, zeolite and fertilizer serpentine reserves ranked first in the province (of which perlite ranked first), molybdenum ore reserves ranked third in the province.
Mineral resource management in 2010, in accordance with the requirements of Yu Zhengban [2010] No. 34 to further carry out the integration of mineral resources. In order to ensure the comprehensive completion of the integration work, the municipal government adjusted and enriched the integration of the city leading group, the municipal government issued a "notice on the further advancement of mineral resources exploration and development of the integration of work", "Xinyang City, mineral resources exploration and development of the integration of program" and "Xinyang City, the provincial key mining integration of the work of the implementation of the program", to ensure that the city's integration of work carried out in an orderly manner. The city's three key mining area integration work has been fully completed, seven key exploration area exploration work has been in the provincial government's unified arrangements to start, the integration of the counties and districts are in an orderly manner, on the ladder of non-metallic mining rights by the original 55 mining enterprises integrated into the current four mining rights. In the province to do a good job in the three key mining resources integration work at the same time, the city, county and district levels to develop the actual mineral resources integration in line with the implementation of Xinyang program. Prospecting rights to clean up the work, county-level land and resources departments to do 100% field verification, city land and resources departments by no less than 30% of the proportion of field spot checks.
Comprehensively carry out special rectification of fluorite ore, strengthen the total amount of mining control, and fluorite mining enterprises signed a control index responsibility letter, the city's total amount of 120,000 tons of fluorspar ore mining in 2010, the decomposition of fluorite ore mining control targets to the implementation of the mining enterprises.
Multiple measures to maintain the orderly development of mining enterprises. First, highlight the key, strict investigation and handling. Increase the fluorspar mine, iron ore, building stone and other mining enterprises, such as unlicensed mining, cross-border mining and other illegal mining enterprises to crack down, the shutdown and rectification resolutely shut down and rectification, the banned resolutely banned according to law. Second, strict law enforcement, the establishment of long-term law enforcement and monitoring mechanism. Adhere to the combination of centralized random inspection and long-term monitoring, further refinement of the production of mining enterprises to monitor the inspection and implementation of mine supervisors package mine responsibility system. Third, adhere to the 24-hour inspection and supervision system. Always nip mining violations in the bud. Fourth, the law enforcement difficulties, and actively coordinate the relevant functional departments to cooperate, joint strikes, to ensure that the law enforcement in place. By carrying out the rectification and standardization of the order of mineral resources exploration and development, rectification, standardization of the "look back", in-depth crackdown on all kinds of illegal exploration and mining special rectification and remote sensing law enforcement and other special work, the city's unlicensed exploration and mining, indiscriminate digging, waste or destruction of mineral resources, serious pollution of the environment and other violations have been comprehensively curbed! Illegal behaviors such as over-layered and over-boundary mining and illegal transfer of prospecting and mining rights have been comprehensively cleaned up, and cases of violations have been investigated and dealt with in a timely manner. Mining safety accidents and the destruction of the ecological environment have been significantly reduced.
In 2010, the city added 10 provincial financial funds exploration projects, exploration funds of 35 million yuan. 75 commercial exploration projects invested more than 150 million yuan in exploration funds. Newly discovered molybdenum, iron, gold mineralization 16 and reached the level of detailed exploration. Proven resource reserves, of which 600,000 tons of molybdenum reserves have been proved in Guangshan County Qiangechong molybdenum ore, up to the scale of extra-large deposits. Luoshan County Shandian gold mine proven reserves of 4,000 kilograms, realizing a major breakthrough in the search for gold in the Dabie Mountains. The city's mining rights management information system was comprehensively updated, and the unified system with the Ministry of Land and Resources was docked. Field verification of the city's mining rights, on the basis of mapping the distribution of the current situation of mining rights, timely rectification of existing problems, updated the mining rights registration database, and comprehensively enhance the scientific management of mining rights. By the end of 2010, the city *** there are 400 mining rights, of which: 28 issued by the provincial level, 3 issued by the municipal level, 369 issued by the county level.
Disaster prevention and control in July 2010, Xinyang City, heavy to heavy rainfall, localized extraordinarily heavy rainfall, the city appeared in many places of danger. In the face of severe flood conditions, Xinyang City Bureau of Land and Resources issued the "Xinyang City Bureau of Land and Resources emergency investigation of geological hazards during the flood season program", "Xinyang City Bureau of Land and Resources on the strengthening of flood prevention and control of geological hazards of the emergency notice" and other documents. At the same time, combined with the actual, seriously carried out the land and resources geological disaster prevention and control "five in place" (i.e., assessment, inspection, planning, publicity and personnel five in place) publicity and training activities, the city's training number of 1,000 people. For 178 geologic disaster group monitoring and prevention points, arrange special monitoring, set up warning signs, make plans, dispatch 336 times of inspection and rescue personnel, issued more than 1,500 copies of the card. Successfully organized two geological disaster avoidance, avoiding more than 330 casualties, and recovering economic losses of more than 10 million yuan. Geological disaster prevention and control "ten counties" creation activities are solid and effective, Shangcheng County was approved by the Ministry of Land and Resources as a geological disaster group survey and prevention "ten counties". Actively strive to obtain the national special funds, including the "two rights" price project funds 31.94 million yuan, geological relics protection project funds 9.79 million yuan, a total of more than 40 million yuan for the city's mining geological environment protection and governance and restoration to provide a strong financial guarantee.
Turning the way to adjust the structure in 2010, Xinyang City Bureau of Land and Resources in turning the way to adjust the structure, crack the problem of reform and innovation has made a new breakthrough. Reform and innovation throughout the entire work, planning ahead, put forward the "improve the quality, improve the system, standardize the management, crack the problem, and then on the level" of the overall work of the idea. The work is more specific, the direction is more clear, Xinyang City Bureau of Land and Resources around the overall idea, highlighting the "eight practical things" and "crack five problems", these practical things and problems decomposed into the relevant units, each unit has conducted a serious study and exploration.
First of all, in-depth research has been carried out. First, the industrial clusters land research, more targeted for the construction and development of industrial clusters to provide a more effective service, and greatly meet the needs of industrial clusters construction land. Second, the construction land approval system reform research. Around the construction land approval work in the key points, difficulties and the actual situation of construction land approval work in recent years, seriously carried out a construction land approval system reform research. On the basis of the research, actively implement the reform of the land use approval system, pay close attention to the quality of the report and the speed of approval, greatly improving the efficiency of the work. Third, the land use situation in 2010 scientific forecast research. Developed a "proactive communication, early intervention, active planning, full service, as early as possible approval" of the construction of land declaration strategy to ensure that all types of construction projects land needs. Second, the implementation of the project forecast "control" land. Timely grasp of the construction project land information is the key to scientific and reasonable arrangements for the total amount of land, layout and timing. In order to ensure that major projects can start construction in a timely manner, Xinyang City Bureau of Land and Resources has developed a construction land forecast system. in early 2010, in consultation with the jurisdictional government on the basis of the views of the social and economic development plan, industrial policy, land use master plan, land use annual plan, urban planning and land market conditions, together with the urban planning department to prepare a state-owned land use right transfer plan, reported to the people's government of Xinyang City, approved, and then promptly submitted to the people's government of Xinyang City. After the approval of the People's Government of Xinyang City, timely public release to the community. Not included in the state-owned land use right transfer plan, in principle, will not be supplied to the land, so that more than 80% of the land use index for key projects, Xinyang City, to achieve leapfrog development to provide land security.
Secondly, the adjustment of land-use structure and the transformation of land-use mode promote the adjustment of economic structure and the transformation of development mode. 2010, Henan Province issued 367 hectares of land-use plan index for new construction in Xinyang City, and these indexes have a big shortfall in comparison with the projected annual land-use plan of Xinyang City and the indexes are very limited. In order to ensure the reasonable utilization of the index, Xinyang City Land and Resources Bureau has made reasonable arrangements for the land use plan index. Priority to protect the province to determine the industrial clusters land, the city's 15 industrial clusters land plan *** arrangement of new construction land indicators 300 hectares. At the same time, increased security housing, ecological construction and environmental protection and other livelihood areas, energy saving and emission reduction and recycling economy and other construction land security. In order to promote the integrated development of urban and rural areas, of the 67 hectares of land reserved in the city's land plan, 18.35 hectares of land for rural construction has been allocated as a planning target. The creation of model counties (cities) of conservation and intensification of activities is solid and effective, set up organizations, formulate programs, determine the pilot, adhere to the connotation of tapping potential, revitalization of 331.6124 hectares of stock.
By the end of 2010, the "five problems" (i.e., the slow progress of comprehensive rural land remediation of the problem, the problem of wasteful land idling, the problem of the rebound of clay brick kilns, the problem of land and resource law enforcement contradictions, the problem of inefficiency) basically resolved, and a breakthrough has been found to carry out the work smoothly. The "eight practical matters" have basically been implemented and achieved good results. Among them, the service of the Shandian reservoir, Minggang Airport and other key projects, the completion of comprehensive land remediation of 350,000 mu, 15,000 mu of new arable land, revitalization of the stock of 280 hectares of land, the completion of the field verification of the city's 401 mining rights, to promote the city of Xinyang City, "digital city," the construction of geospatial, the city's more than 75% of the grass-roots land and resources The six tasks of standardizing the construction standards of the city's grass-roots land resources offices were successfully completed. The indoor exhibition of the Land and Geology Museum and the creation of a municipal spiritual civilization unit and a municipal advanced unit of peace building are also being actively processed.
Basic land construction in 2010, Xinyang City Bureau of Land and Resources to promote the creation of grass-roots land and resources satisfied with the masses to do "three in place". First, mobilization in place. The city's land system to create a mass satisfaction of the grass-roots station mobilization meeting to ensure that each comrade of the creation of a clear understanding of the work to create a program to create a specific arrangement for the creation of the work to create a clear standard, methods, steps and assessment methods. Do everyone involved, everyone has the responsibility. Second, measures in place. Each institute has established a job responsibility system, service commitment system, time-bound completion system, the first responsible for the system, accountability system, one-time notification system, etc., in the township of the centralized area of the flow of people, timely disclosure of the workflow, fees and other aspects of the information, to accept the public supervision. Third, the supervision in place. The Bureau set up a monitoring office and the Office of the inspection team, respectively, to each of the grass-roots land and resources to the public satisfaction of the creation of the work carried out on a regular basis or from time to time to supervise the situation. In the city-wide standardized construction of land and resource offices, the city reached 167 land and resource offices, accounting for 83.5% of the total number of land and resource offices in the city, exceeding the 75% standardization rate stipulated by the provincial department, of which 39 were commended.
Law enforcement and supervision in 2010, Xinyang City, illegal land use has been significantly reduced. The city ****found 93 cases of land violations, involving 22.65 hectares of land (including 9.31 hectares of arable land). Forty-eight cases were opened and investigated, 38 cases were closed, 45 cases were stopped by dynamic inspection, involving 10.7 hectares of land (including 4.3 hectares of arable land), 30,000 yuan of economic loss was recovered, and 3,451,400 yuan of fines and forfeitures were collected. Give full play to the function of the 12336 reporting phone, *** received 12336 higher departments, referred to the case of 103 cases, has completed the report of 95 cases; acceptance of the city's 12336 violation of the report of 57 cases, has been completed 53 cases. At the same time, seriously carried out administrative reconsideration hearings, properly resolved and resolved administrative reconsideration disputes 2, acceptance of hearings 4. The tenth law enforcement inspection of land use film is progressing smoothly. Land law enforcement inspection, Xinyang City **** filed 88 cases. Demolition of building area of 39,610,000 square meters, confiscated an area of 181,100 square meters, apply for court enforcement of 64 cases, the implementation of 39 cases, administrative sanctions 28 people, the implementation of 24 people, the transfer of 1 people, the collection of confiscated funds 7,530,820,000 yuan, illegal land occupation of arable land accounted for the proportion of new construction land occupied by arable land of the total area of 4.2%, and passed the inspection and acceptance of the state land inspection Jinan Bureau and the Provincial Department of Land and Resources. The inspection and acceptance of the State Land Inspection Jinan Bureau and the Provincial Department of Land and Resources were successfully passed.
In 2010, the city's land-related visits to the Ministry of 30, 92 person-times, compared with the same period last year, 30, 101 people, the number of cases is the same as last year, the number of people fell by 11.2%; land-related visits to the province of 26, 60 person-times, compared with the same period last year, 22, 74 person-times, the number of cases rose by 18%, the number of people fell by 19%; soil-related visits to the city of 91, 231 person-times, compared with the same period last year, 102, 3 person-times; land-related visits to the city of 231 people, compared with the same period last year, 102, 3 person-times; land-related visits to the city of 231 people, compared with the same period last year, 102, 3 people-times. Compared with the same period of last year 102 cases, 324 people, the number of cases fell by 13.7%, the number of people fell by 28.7%. Handle 44 pieces of letters from the public, handle 12 pieces of review and re-examination.